Xie Xiaoyi,Gong Zhihui,Zhou Guangyi. Model Test on Lining of Single Arch Large Cross-section Highway Tunnel to Partial Press[J].Journal of Hunan University of Arts and Science ( Natural Science Edition) ,2011( 1) : 90-94.
[2]王志杰.钢钎维混凝土隧道衬砌破坏模式及承载能力研究[J].铁道科学与工程学报,2007( 6) :40-43.
Wang Zhijie.Bearing Capacity and Collapse Behavior of Steel Fiber Reinforced Concrete Tunnel Lining[J]. Journal of Railway Science and Engineering,2007 ( 6) : 40-43.
[3]项贻强,唐国斌,朱汉华,等. 预应力混凝土箱梁施工过程中底板崩裂破坏机理分析[J].中国公路学报,2010,23 (5) :70-75.
Xang Yuqiang,Tang Guobin,Zhu Hanhua,etc. Failure Mechanism Analysis of Bottom Plate of Prestressed Concrete Box Girder Bridge During Construction[J]. China Journal of Highway and Transport,2010 ( 5 ) : 70-75.
[4]董承全,孟军涛. 声发射预测岩体破坏的试验研究与应用[J]. 西部探矿工程,2010( 10) :30-32.
Dong Chengquan,Meng Juntao. Experimental Research and Application on Predicting Rock Mass Failure by Acoustic Emission[J]. West-China Exploration Engineering,2010( 10) : 30-32.
[5]董承全,吴绵拔,唐仁明.预测岩体破坏的试验研究[J].大众科技,2009( 11) :79-80.
Dong Chengquan,Wu Mianba,Tang Renming. Experimental Study on Prediction of Rock Mass Failure[J].Popular Science & Technology,2009( 11) : 79-80.
[6]杨叔子,吴雅,轩建平,等著. 时间序列分析的工程应用 (上,下册) [M].武汉: 华中科技大学出版社,2007.
Yang Shuzi,Wu Ya,Xuan Jianpin,etc.Time Series Analysis in Engineering Application [M].Wuhan: Huazhong University of Science&Technology Press,2007.
[7]丁斌.用组合模型预测软土地基桩基沉降[J].混凝土与水泥制品,2011(3) :32-35.
Ding Bin. Prediction for Pile Foundation Settlement of Soft Soil Foundation by Combined Models [J].China Concrete and Cement Products,2011(3) : 32-35.
[8]张昆,郭菊彬,王鹰. 基于时间序列的沉降预测[J]. 铁道建筑,2006( 4) :44-45.
Zhang Kun,Guo Jibing,Wang Ying.Subsidence of Subsoil Prediction Based on Time Series[J]. Railway Engineering,2006( 4) : 44-45.
[9]肖武权,冷伍明. 路基沉降的时间序列动态预测方法[J].铁道工程学报,2004(4) :50-53.
Xiao Wuquan,Leng Wuming.Methods of Time Series Dynamic Prediction of Road Embankment Settlement [J].Journal of Railway Engineering Society,2004(4) :50 - 53.