Song Bingjing.Research on Three-dimensional Model of Regional Transportation Hub of Metro with High - speed Railway [J].Journal of Railway Engineering Society,2012( 2) : 90-93.
[5]彭文盛,彭辉. 高速铁路引入既有枢纽客运站的布局[J].交通运输工程学报,2004( 2) :62-65.
Peng Wensheng,Peng Hui. Passenger Station Layout of High-speed Railway Existing Terminal[J].Journal of Traffic and Transportation Engineering,2004 ( 2) : 62-65.
[6]徐行方,向劲松.环形铁路枢纽车流组织方案研究[J]. 铁道运输与经济,2005(7) :45-47.
Xu Xingfang,Xiang Jinsong. Circular Railway Terminal Flow Organization Plan[J].Railway Transport and Economy,2005(7) : 45-47.
[7]刘术红.高速铁路客运枢纽交通规划研究[J].山西科技, 2007( 2) : 27-28.
Liu Shuhong.Study on the Traffic Planning of the High-speed Railway Transport Hub of Passengers[J]. Shangxi Science and Technology,2007( 2) : 27-28.
[8] 郝之颖. 高速铁路站场地区空间规划[J]. 城市交通,2008 (5) :48-52.
Hao Zhiying.Space Planning around High - speed Rail Stations[J].Urban Transport of China,2008(5) : 48 - 52.
[9]吴家豪.日本东京铁路客运站高速车场布设与作业的剖析[J].铁道标准设计,2006( 增刊) :47-52.
Wu Jiahao. Analysis of Tokyo,Japan,High-speed Rail Passenger Terminal Yard Layout and Operating [J].Railway Standard Design,2006(S) :47-52.