Soil Disturbance Analysis and Settlement Control of Rectangular Pipe Jacking with Super Large Section |
JIANG Liutao1, LI Hongbo2 |
1. Shaanxi Railway Institute, Weinan, Shaanxi 714000, China; 2. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou, Henan 450001, China |
|
|
Abstract Research purposes: The soil disturbance and settlement control in the construction of super-large section pipe jacking is very important to the risk control of the whole project. In order to explore the soil disturbance law and settlement control method of super-large section rectangular earth pressure balance pipe jacking, based on the pipe jacking project of Zhengzhou Hongzhuan Road crossing Zhongzhou Avenue, through the pipe jacking model and numerical solution analysis of soil settlement, the influence law of pipe jacking process parameters on soil deformation is deeply analyzed. Research conclusions: (1) The numerical solution of soil settlement under different factors of rectangular pipe jacking is consistent with the measured value, which verifies the accuracy of the numerical model solution. (2) Through the analysis of the influencing factors of soil disturbance, it is found that the friction coefficient of mud jacket has little influence on the ground settlement, and the proper increase of thrust and grouting pressure can inhibit the ground settlement. It is suggested that the thrust should be slightly greater than 1 time of the central earth pressure of the face, and the grouting pressure should be controlled within 2 times of the overlying soil pressure. (3) The comprehensive application of anti-back soil design, pipe joint wax coating, thixotropic mud, slag improvement, grouting and friction reduction, has a significant effect on reducing soil disturbance and settlement control of large-section pipe jacking. (4) The research results can provide reference for super-large section rectangular earth pressure balance pipe jacking engineering.
|
Received: 19 August 2022
|
|
|
|
|
[1] |
洪开荣.近2年我国隧道及地下工程发展与思考(2017—2018年)[J].隧道建设(中英文),2019(5):710-723.Hong Kairong. Development and Thinking of Tunnels and Underground Engineering in China in Recent 2 Years ( From 2017 to 2018)[J].Tunnel Construction,2019(5):710-723.
|
[2] |
朱瑶宏,朱雁飞,黄德中,等.类矩形盾构法隧道技术的开发与应用[J].现代隧道技术,2016(S1):1-12.Zhu Yaohong,Zhu Yanfei,Huang Dezhong,etc.Development and Application of the Technical System for Quasi-Rectangular Shield Tunneling[J]. Modern Tunnelling Technology,2016(S1):1-12.
|
[3] |
吴波,彭逸勇,蒙国往.软土地层大断面矩形顶管施工引起切口前方地表隆起分析[J].现代隧道技术,2021(2):86-92.Wu Bo,Peng Yiyong,Meng Guowang. Analysis on Ground Surface Heaving ahead of Cutting Face Caused by Large-section Rectangular Pipe Jacking in Soft Soil Layer[J].Modern Tunnelling Technology,2021(2):86-92.
|
[4] |
贾连辉. 超大断面矩形盾构顶管设计关键技术[J].隧道建设,2014(11): 1098-1103.Jia Lianhui. Key Technologies for Design of Super-large Rectangular Pipe Jacking Machine[J].Tunnel Construction,2014(11):1098-1103.
|
[5] |
彭刚.大断面矩形顶管近距离双线并行施工引发地表沉降分析[J].施工技术,2017(20):70-73.Peng Gang . Analysis of Surface Settlement Induced by Close Parallel Dual-tunnel Construction of Large Section Rectangular Jacking Pipe[J]. Construction Technology,2017(20):70-73.
|
[6] |
刘畅,周顺华,季昌,等.类矩形盾构隧道施工期上浮影响因素分析[J].华东交通大学学报,2016(1):94-99.Liu Chang, Zhou Shunhua, Ji Chang, etc. Influence Factor Analysis for Upward Floating of Quasi Rectangle Shield Tunnel in Construction Period[J].Journal of East China Jiaotong University, 2016(1):94-99.
|
[7] |
黄伟.大断面矩形顶管隧道管节结构优化设计[J].隧道建设(中英文),2020(6):859-867.Huang Wei. Optimization Design of Segmental Structure of Large Cross-section Rectangular Pipe-jacking Tunnel[J]. Tunnel Construction,2020(6):859-867.
|
[8] |
周浩,马保松,赵阳森,等.多因素下大断面矩形顶管施工对地层竖向变形影响研究[J].隧道建设(中英文), 2020(9):1324-1329.Zhou Hao, Ma Baosong, Zhao Yangsen, etc. Study on Influence of Large Cross-section Rectangular Pipe Jacking Construction on Vertical Deformation of Strata under Multiple Factors[J]. Tunnel Construction, 2020(9):1324-1329.
|
|
|
|