[11] 王小军,韩文峰,蒋富强,等. 青藏铁路片石通风试验路基沉降与普通路基裂缝解剖分析[J]. 岩石力学与工程学报,2006( 9) : 1904 -1911.
Wang Xiaojun, Han Wenfeng, Jiang Fuqiang. Dissecionn and Analysis of Settlement of Rubble Ventilation Embankment and Crack of Ordinary Embankment in Permafrost Regions [J]. Chinese Journal of Rock Mechanics and Engineering,2006( 9) : 1904 - 1911.
[12] 李永强. 青藏铁路多年冻土区热棒路基裂缝产生原因分析[J]. 兰州大学学报( 自然科学版) ,2006( 专辑) : 100 - 103.
LI Yongqiang. An Analysis of the Causes of Cracks in the Thermal Probe Subgrade of the Qinghai - Tibet Railway[J]. Journal of Lanzhou University ( Version of Sciences) ,2006( Special) : 100 - 103.
[13] 满高峰,刘建坤. 多年冻土地区路基纵向裂缝形成机理的数值分析[J]. 铁道建筑,2007( 5) : 51 -54.
Man Gaofeng, Liu Jiankun. Numerical Analysis on Mechanism of Longitudinal Crack Occurred in Subgrade in Permafrost Region [ J ]. Railway Engineering,2007( 5) : 51 - 54.
[14] 李金城. 2001 -2006 年青藏铁路多年冻土区冻害调查与分析[J]. 冰川冻土,2008( 2) : 147 -152.
Li Jincheng. Frost Damages in Permafrost Regions along the Qinghai - Tibet Railway in 2001 - 2006: Investigation and Analysis[J]. Journal of Giaciology and Geocryology,2008( 2) : 147 - 152.