[5] 张昆,唐林,等. ETHIOPIA 新建准轨铁路 Addis Ababa ~ Djibouti 铁路 Sebeta ~ Adama ~ Mieso 段工程地质勘察报告[R]. 成都: 中铁二院工程集团有限责任公司,2011.
Zhang Kun,Tang Lin, etc. Geological Exploration Report on Sebeta ~ Adama ~ Mieso Section of the New Addis Ababa ~ Djibouti Standard - gauge Railway in Ethiopia[R]. Chengdu: CREEC,2011.
[6] 亚的斯亚贝巴大学. 亚的斯亚贝巴至吉布提铁路地质勘察最终报告[R]. 亚的斯亚贝巴: 亚的斯亚贝巴大学, 2011.
CED - AAU. Final Report on Geological Exploration of Addis Ababa ~ Djibouti Railway[R]. Addis Abeba: CED - AAU,2011.
[7] 张昆,郭菊彬,李建强. 埃塞俄比亚新建铁路主要工程地质问题及对策[J]. 铁道工程学报,2011( 10) : 38 -45.
Zhang Kun,Guo Jubin,Li Jianqiang. Countermeasure and Primary Engineering Geological Problems of Newly - built Ethiopian Railway [J]. Journal of Railway Engineering Society,2011( 10) : 38 - 45.