铁道工程学报  2012, Vol. 29 Issue (3): 69-73    DOI:
Current Issue | Archive | Adv Search |
Treatment Technology for Mud Bursting of Baiyun Tunnel of Nanning -Guangzhou Railway in Fault
ZHANG Min - qing1,WANG Gang - ling2,SUN Guo - qing2
1. Engineering Management Centre,Ministry of Railways,Beijing 100844,China; 2. China Railway Tunnel Group Co. Ltd,Luoyang,Henan 471009,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech