Zhang Qianli,Han Zili,Lv Binlin. Structural Analysis and Design Method for Subgrade Bed of High - speed Railway[J]. China Railway Science,2005( 6) : 53 - 57.
[3] 李渊. 高填方路基竖向应力分布规律研究[D]. 重庆: 重庆大学,2008. Li Yuan. Research on the Distributing Law of Vertical Stress Distribution in the Subgrade of the High Fill[D].Chongqing: Chongqing University,2008.
[4] 杨灿文,柴锦春. 铁路路基应力、应变计算方法[J]. 路基工程,1988( 3) : 48 -51.
Yang Canwen,Chai Jinchun. Calculation of Stress and Strain in Railway Subgrade[J]. Subgrade Engineering,1988( 3) : 48 - 51.
[5] 杨奇,冷伍明,邓宗伟,等. 桥台地基附加竖向压应力通用计算公式[J]. 岩土力学,2008( 3) : 833 -837.
Yang Qi,Leng Wuming,Deng Zongwei,etc. Universal Calculation Formula of Additional Vertical Stress under Bridge Abutment due to Embankment and Conical Slope[J]. Rock and Soil Mechanics,2008 ( 3 ) : 833 - 837.
[6] 蒋关鲁,王海龙,李安洪. 高速铁路路基基底应力计算方法研究[J]. 铁道建筑,2009( 4) : 65 -69.
Jiang Guanlu,Wang Hailong,Li Anhong. Research on the Calculation Method of Foundation Base Stress in Railway Subgrade of High Speed Railway[J]. Railway Engineering,2009( 4) : 65 - 69.
[7] 牛玺荣,韩萍,张晓燕. 车轮荷载下路基和基底竖向应力计算[J]. 公路,2010( 10) : 100 -103.
Niu Xirong,Han Ping,Zhang Xiaoyan. Calculation of Vertical Stress in Subgrade and Foundation Base Under Wheel Load[J]. Highway,2010( 10) : 100 - 103.
[8] 徐林荣,牛建东,吕大伟. 高速铁路软基路堤基底接触应力试验研究[J]. 路基工程,2006( 2) : 41 -43.
Xu Linrong,Niu Jiandong,Lu Dawei. Experimental Study on Contact Stress of High - Speed Railway Embankment in Soft Soil[J]. Subgrade Engineering,2006( 2) : 41 - 43.
[9] 魏永幸,邱延峻. 高速铁路无砟轨道路基面支撑刚度研究[J]. 铁道工程学报,2010( 7) : 15 -19.
Wei Yongxing,Qiu Yanjun. Research on the Subgrade Surface Stiffness of Ballastless Track of High - speed Railway [J]. Journal of Railway Engineering Society,2010( 7) : 15 - 19.
[10] TB 10621—2009,高速铁路设计规范( 试行) [S].
TB 10621—2009, Code for Design of High Speed Railway[S].
[11] 铁建设[2005]140 号,新建时速 200 ~250 公里客运专线铁路设计暂行规定( 上、下) [S].
Railway Construction[2005]No. 140,Interim Design Provisions for a New 200 km /h ~ 250 km /h Passenger Dedicated Railway[S].
[12] 铁建设函[2005]285 号,新建时速 200 公里客货共线铁路设计暂行规定[S].
Railway Construction Letter[2005]No. 285,Interim Design Provisions for a New 200 km /h Mixed Passenger and Freight Railway[S].
[13] TB 10001—2005,铁路路基设计规范[S].
TB 10001—2005, Code for Design on Subgrade of Railway[S].