Research and Discussion on Several Key Issues of Safety Construction of the Railway Tunnel |
ZHANG Min-qing,HE Zhi-jun,HUANG Hong-jian,XIAO Guang-zhi |
Engineering Management Centre,Ministry of Railways,Beijing 100844,China |
|
|
Abstract Research purposes: China is the world's most populous country in the tunnel that usually use the drilling and blasting method. Advance geological prediction of tunnel construction method of choice,the safety of tunnel construction,step distance and the tunnel excavation footage control are four key problems in tunnel construction. In view of these problems,there are some cognitive biases and error approach in construction field,seriously affect the safety of tunnel construction. Therefore,must carry on the discussion and research on these key problems,in order to ensure the safety of the tunnel construction.
Research conclusions:(1)Advance geological forecast shall have special design,in view of the different geological shall take reasonable and effective method,should further clarify the advance geological forecast expenses and liability. (2)Step construction,the step height is 2. 5 m,to facilitate the rapid positioning that at the top of the installation of steel frame positioning,is conducive to the construction safety,step length should be 1 times of the diameter of the tunnel.(3)The construction safety step is an effective measure to step construction safety,mandatory implementation. (4)The excavation footage control is an effective measure to prevent the loss of stability of tunnel face,must be strictly controlled in the construction step method.(5)Research results can be applied to the bench method for construction of railway tunnel.
|
Received: 21 October 2012
|
|
|
|
|
[1]TB 10003—2005,铁路隧道设计规范[S]
TB 10003—2005,Cord for Design of Railway Tunnel[S].
[2]铁建设[2008]105号,铁路隧道超前地质预报技术指南[S]
Railway Construction[2008]No. 105,Railway Tunnel Geological Prediction Technology Guide [ S ].
[3]铁建设[2010]241号,高速铁路隧道工程施工技术指南[S]
Railway Construction [ 2010]No. 241, Technical Guide of Construction of High-speed Railway Tunnel Engineering [ S ].
[4]关宝树.软弱围岩隧道施工技术[M]北京:人民交通出版社,2011
Guan Baoshu. Construction Technology of Soft Rock Tunnel[M].Beijing: China Communications Press, 2011.
[5]张民庆,汪纲领,孙国庆.南广铁路白云隧道断层突泥灾害治理技术[J].铁道工程学报,2012(3):69-73.
Zhang Minqing, Wang Gangling, Sun Guoqing. Treatment Technology for Mud Bursting of Fault in Nanguang Railway BaiYun Tunneling[J].Journal of Railway Engineering Society , 2012 ( 3) : 69-73.
|
|
|
|