Jiang Xudong.Determination of Scheme and Construction Control of Initial Tensioning Force of Suspenders of Tied Arch Bridger[J].Shanghai Highways,2008(1):37-39.
[10]冯楚桥.高速铁路无砟轨道112m尼尔森体系提篮系杆拱桥设计[J].铁道工程学报,2007(增刊):232-235.
Feng Chuqino.Design of 112 m A-shaped Tied Arch Bridge of Nielsen System in High Speed Railway with Ballastless Track[J].Journal of Railway Engineering Society,2007(S):232-235.