Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
Other articles related with "U":
65
YANG Bao-chong
APPLICATION OF WET SHOTCRETE FOR TUNNEL
Journal of Railway Engineering Society 1999 Vol.16 (3): 65-67 [
Abstract
] (
2507
) 1 [
HTML
1 KB] [
PDF
133 KB] (
136
)
82
LUO Bin,HU Hou-tian,Lu Xiao-ping
STUDY ON CUTTING SLOPE SURFACE EROSION OF GRANITE ELUVIUM IN THE SOUTH OF CHINA
Journal of Railway Engineering Society 1999 Vol.16 (3): 82-85 [
Abstract
] (
2502
) 1 [
HTML
1 KB] [
PDF
269 KB] (
187
)
1
SUN Guang-zhong
BASIC THEORY AND APPLICATION TECHNIQUE FOR SPEEDING UP THE RAILWAY CONSTRUCTION OF CHINA
Journal of Railway Engineering Society 1999 Vol.16 (2): 1-4 [
Abstract
] (
2468
) 1 [
HTML
1 KB] [
PDF
273 KB] (
71
)
5
ZHU Yin,MEGN Zhi-yong,KAN Shu-yu
RESEARCH ON THEORY AND METHODS OF SCHEME COMPARISON FOR NEWLY-BUILT RAILWAY CONSTRUCTION
Journal of Railway Engineering Society 1999 Vol.16 (2): 5-8 [
Abstract
] (
2517
) 1 [
HTML
1 KB] [
PDF
261 KB] (
139
)
9
LIANG Qing-huai,ZENG Xue-gui
THE SITUATION AND DIRECTION OF CHINESE RAILWAY DESIGN CAD
Journal of Railway Engineering Society 1999 Vol.16 (2): 9-10 [
Abstract
] (
2528
) 1 [
HTML
1 KB] [
PDF
216 KB] (
175
)
11
QU Xiao-hui,REN Run-tang
PRE-STATION DESIGN TECHNIQUES OF HIGH SPEED RAILWAY AND EXPLORATION ON ITS ESSENTIAL PROBLEMS
Journal of Railway Engineering Society 1999 Vol.16 (2): 11-16 [
Abstract
] (
2547
) 1 [
HTML
1 KB] [
PDF
463 KB] (
116
)
17
JING Wen-chang
PRELIMINARY DISUSSION ON RAILWAY ROUTE SELECTION IN DESERT REGIONS
Journal of Railway Engineering Society 1999 Vol.16 (2): 17-22 [
Abstract
] (
2504
) 1 [
HTML
1 KB] [
PDF
427 KB] (
159
)
23
JIANG Xian-yang,CAI Jin-huo
ASSEMBLY TECHNIQUE OF STEEL TUBE ARCH RIBS FOR 100m MAIN SPAN OF HONGZHOU MAJOR BRIDGE
Journal of Railway Engineering Society 1999 Vol.16 (2): 23-26 [
Abstract
] (
2512
) 1 [
HTML
1 KB] [
PDF
260 KB] (
77
)
27
SUN Zhao-yuan
ERECTING 2 × 64 m CONTINUOUS STEEL TRUSS BY BIDIRECTIONAL COMPLETE CANTILEVER ASSEMBLY METHOD
Journal of Railway Engineering Society 1999 Vol.16 (2): 27-30 [
Abstract
] (
2528
) 1 [
HTML
1 KB] [
PDF
301 KB] (
152
)
31
LEI Xiao-yan,LI Ming-hua
ANALYSES OF CLIP BOLT FRACTURE FOR GUARD RAIL OF RAILWAY BRIDGE
Journal of Railway Engineering Society 1999 Vol.16 (2): 31-35 [
Abstract
] (
2504
) 1 [
HTML
1 KB] [
PDF
314 KB] (
126
)
36
LIANG Bo
SIMPLIFIED CALCULATION METHOD OF ACTIVE EARTH PRESSURE ON BACK OF ABUTMENT UNDER EARTHQUAKE CONDITION
Journal of Railway Engineering Society 1999 Vol.16 (2): 36-38 [
Abstract
] (
2538
) 1 [
HTML
1 KB] [
PDF
172 KB] (
164
)
39
WANG Qiang,LENG Wu-ming
UNCERTAINTY ANALYSIS OF THE DESIGN VARIABLES OF THE RAILWAY BRIDGE’S SHALLOW FOUNDATIONS
Journal of Railway Engineering Society 1999 Vol.16 (2): 39-42 [
Abstract
] (
2545
) 1 [
HTML
1 KB] [
PDF
278 KB] (
101
)
43
GUO Shan-yun
ANALYSES ON PRACTICAL EXAMPLES OF RAPID CONSTRUCTION OF MOUNTAIN TUNNELS
Journal of Railway Engineering Society 1999 Vol.16 (2): 43-47 [
Abstract
] (
2505
) 1 [
HTML
1 KB] [
PDF
454 KB] (
137
)
48
ZHANC De-he
DESIGN AND CONSTRUCTION OF TUNNEL CROSSING CAVERN WITH ACCUMULTIONS
Journal of Railway Engineering Society 1999 Vol.16 (2): 48-53 [
Abstract
] (
4768
) 1 [
HTML
1 KB] [
PDF
421 KB] (
110
)
54
HAN Wei-dong,QIAO Chun-sheng
THERMAL FIELD SIMULATION OF IMMERSED TUNNEL UNIT DURING ITS CONSTRUCTION
Journal of Railway Engineering Society 1999 Vol.16 (2): 54-57 [
Abstract
] (
2578
) 1 [
HTML
1 KB] [
PDF
278 KB] (
80
)
63
XU He-ping
THINK UPON TREATMENT OF LEAK OF TUNNEL LINING ON NANKUN RAILWAY (WEST-SECTION)
Journal of Railway Engineering Society 1999 Vol.16 (2): 63-68 [
Abstract
] (
2480
) 1 [
HTML
1 KB] [
PDF
411 KB] (
196
)
69
ZHENG Yu-xin
ANALYSIS ON SLIDE MECHANISM DURING CONSTRUCTION OF TUNNELS AND ITS TREATMENT METHODS
Journal of Railway Engineering Society 1999 Vol.16 (2): 69-72 [
Abstract
] (
2502
) 1 [
HTML
1 KB] [
PDF
286 KB] (
299
)
73
HE De-quan,ZHANG Zhao-cai
SELECTION OF TYPES AND METHODS FOR THE RESTRAINT WORKS OF LANDSLIDE AT DK163
Journal of Railway Engineering Society 1999 Vol.16 (2): 73-76 [
Abstract
] (
2489
) 1 [
HTML
1 KB] [
PDF
299 KB] (
78
)
77
ZHU Chi
CONTROLLED BLASTING TECHNIQUE OF HIGH ROCK SLOPE ON ELECTRIFIED DOUBLE TRACK RAILWAY WITH MINIMUM DISTANCE BETWEEN CENTERS OF TRACKS
Journal of Railway Engineering Society 1999 Vol.16 (2): 77-82 [
Abstract
] (
2618
) 1 [
HTML
1 KB] [
PDF
362 KB] (
79
)
83
YUAN Yu-sen
PRESTRESSED REINFORCED CONCRETE MAST FOR HIGH CAPACITY HEADSPAN SUSPENSION
Journal of Railway Engineering Society 1999 Vol.16 (2): 83-85 [
Abstract
] (
2541
) 1 [
HTML
1 KB] [
PDF
210 KB] (
188
)
86
YIN Chuan-gui,KANG Li-juan
METHOD BY SERIES CONNECTION OF CAPACITY AT EARTHING END OF TRANSFORMER AND ITS COMPARISON&ANALYSIS
Journal of Railway Engineering Society 1999 Vol.16 (2): 86-87 [
Abstract
] (
2524
) 1 [
HTML
1 KB] [
PDF
144 KB] (
100
)
88
XU An-hua
REVIEW AND THOUGHT ON MECHANIZATION OF RAILWAY CONSTRUCTION
Journal of Railway Engineering Society 1999 Vol.16 (2): 88-93 [
Abstract
] (
2513
) 1 [
HTML
1 KB] [
PDF
461 KB] (
134
)
94
HE Yu-lian
SCIENTIFIC FORECAST METHOD ON CONSTRUCTION RATE OF PROGRESS FOR TBM
Journal of Railway Engineering Society 1999 Vol.16 (2): 94-98 [
Abstract
] (
2523
) 1 [
HTML
1 KB] [
PDF
311 KB] (
162
)
99
PAN Pei-hua
ANALYSIS AND PREVENTION ON COMMON ACCIDENT OF CRAWLER CRANE DURING FORCED TAMPING ON FOUNDATION
Journal of Railway Engineering Society 1999 Vol.16 (2): 99-103 [
Abstract
] (
2525
) 1 [
HTML
1 KB] [
PDF
353 KB] (
124
)
104
WANG Xin-li
ANALYSIS ON LATERAL STABILITY OF DOUBLE一ARMED BRIDGE ERECTING MACHINE AND PREVENTIVE MEASURE AGAINST OVERTURNING
Journal of Railway Engineering Society 1999 Vol.16 (2): 104-107 [
Abstract
] (
2499
) 1 [
HTML
1 KB] [
PDF
324 KB] (
142
)
108
LING Guo-jie
PRELIMINARY EXPLORATION ON REPAIR TECHNIQUE FOR CRACKING OF CONCRETE AND MASONRY BEAM BY UTILIZING NEW TYPE MATERIALS
Journal of Railway Engineering Society 1999 Vol.16 (2): 108-111 [
Abstract
] (
2493
) 1 [
HTML
1 KB] [
PDF
308 KB] (
111
)
112
WANG Guo-min
PRACTICE ON DESIGN AND CONSTRUCTION OF FOUNDATION WORK FOR A HIGH MULTI-STOREY BUILDING WITH PARTICULAR WORKING CIRCUMSTANCES
Journal of Railway Engineering Society 1999 Vol.16 (2): 112-116 [
Abstract
] (
4805
) 1 [
HTML
1 KB] [
PDF
323 KB] (
100
)
117
YIN Jian,ZHOU Shi-qiong,XIE You-jun
MANUFACTURE AND APPLICATION OF HIGH一PERFORMANCE PFA CONCRETE
Journal of Railway Engineering Society 1999 Vol.16 (2): 117-123 [
Abstract
] (
2564
) 1 [
HTML
1 KB] [
PDF
437 KB] (
151
)
1
FAN Guangming
SPEED UP STEPS FOR CONSTRUCTING QING-ZANG RAILWAY TO PROMOTE DEVELOPMENT OF RAILWAY NETWORK IN XIZANG AU-TONOMOUS REGION
Journal of Railway Engineering Society 1999 Vol.16 (1): 1-5 [
Abstract
] (
2484
) 1 [
HTML
1 KB] [
PDF
308 KB] (
174
)
6
XIONG Xingde, WANG Baoshan
THINKING AND SUGGESTION FOR CONSTRUCTIGN LAN-YU RAIL?WAY-THE SECOND TRUNK PASSAGE BETWEEN SOUTHWEST AND NORTHWEST OF CHINA
Journal of Railway Engineering Society 1999 Vol.16 (1): 6-8 [
Abstract
] (
2477
) 1 [
HTML
1 KB] [
PDF
185 KB] (
90
)
First page
|
Prev page
|
Next page
|
Last page
Page 102 of 104, 3111 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech