Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
Other articles related with "U 213.1":
35
JIANG Chu-sheng, ZHAO Xiao-yan, LI Qing-hai, HE Gang
Discussion on Design Theory on Joint Use of Pile and Soil-nailing or Retaining Walls
Journal of Railway Engineering Society 2010 Vol.27 (4): 35-39 [
Abstract
] (
2645
) 1 [
HTML
1 KB] [
PDF
242 KB] (
119
)
22
WEI Yong-xing, XUE Xin-hua, GONG Xiao-nan
Study on the Bearing Capacity of Foundation under Flexible Embankment Load
Journal of Railway Engineering Society 2010 Vol.27 (2): 22-26 [
Abstract
] (
2656
) 1 [
HTML
1 KB] [
PDF
831 KB] (
212
)
7
HU Rong-guang
Multivariate Nonlinear Regression Analyses of Time Series Law to Subgrade Settlement of High-speed Railway Based on the Foundation of Layer-summation
Journal of Railway Engineering Society 2009 Vol.26 (3): 7-10 [
Abstract
] (
2511
) 1 [
HTML
1 KB] [
PDF
196 KB] (
176
)
First page | Prev page | Next page | Last page
Page 1 of 1, 3 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech