Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "U 455.4":
68 ZHANG Min-qing, HUANG Hong-jian
  Technology for Blocking Water by Grouting for High - pressure Cranny Water of Qiyueshan Tunnel
    Journal of Railway Engineering Society   2010 Vol.27 (1): 68-72 [Abstract] (2511) 1 [HTML 1 KB] [PDF 900 KB] (230)
79 LAN Yu, FANG Yong, DUAN Shao-he,ZHONG Shan
  Numerical Similation for Construction of Metro Shield Tunnel Under crossing Jinjiang Bridge
    Journal of Railway Engineering Society   2009 Vol.26 (3): 79-83 [Abstract] (2477) 1 [HTML 1 KB] [PDF 787 KB] (159)
93 BAO Yong-liang, ZHENG Qi-zhen, TANG Jian-zhong
  Monitoring Analysis of Construction for Connecting Aisle in Metro Tunnel with Freezing Method
    Journal of Railway Engineering Society   2009 Vol.26 (3): 93-95 [Abstract] (2471) 1 [HTML 1 KB] [PDF 355 KB] (233)
First page | Prev page | Next page | Last pagePage 1 of 1, 3 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech