Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
Other articles related with "U445.46":
50
XU Hong, ZHOU Mi, WANG Yamei, XU Ruilong
Research on the Construction Control of Arch Rib of Concrete-filled Steel Tube Stiff Skeleton Arch Bridge
Journal of Railway Engineering Society 2022 Vol.39 (9): 50-55 [
Abstract
] (
2963
) 1 [
HTML
1 KB] [
PDF
675 KB] (
1938
)
68
XU Bin
Research on the Design of High-speed Railway Turnout Continuous Beam Bridges Based on Converting Simply Supported Beams into Continuous Beam
Journal of Railway Engineering Society 2022 Vol.39 (2): 68-72 [
Abstract
] (
3725
) 0 [
HTML
0 KB] [
PDF
2068 KB] (
1981
)
47
YAO Sen
Rapid Construction Technology for Dongjiang South Bridge of Guangzhou - Dongguan - Shenzhen Intercity Railway
Journal of Railway Engineering Society 2013 Vol.30 (5): 47-51 [
Abstract
] (
2612
) 1 [
HTML
1 KB] [
PDF
2203 KB] (
404
)
59
LI Fang - feng,WANG Fang - jin
Design of Assembled Bridge Erecting Machine and Its Construction Method
Journal of Railway Engineering Society 2012 Vol.29 (9): 59-64 [
Abstract
] (
2705
) 1 [
HTML
1 KB] [
PDF
917 KB] (
178
)
42
China Railway No.9 Group Co.Ltd,Dalian,Liaoning 1 16001,China
Analysis of the Load Bearing Capacity of Reinforcement System with Space Structure for Track on I—beam of Frame B ridge
Journal of Railway Engineering Society 2009 Vol.26 (9): 42-45 [
Abstract
] (
2588
) 1 [
HTML
1 KB] [
PDF
380 KB] (
157
)
First page | Prev page | Next page | Last page
Page 1 of 1, 5 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech