关闭×
Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
2013 Vol. 30, No. 6
Published: 2013-06-15
1
Research on Plan for Running 10 000 t Heavy·--haul Train on Houma
ZHANG Ming
Research purposes:The Houma—Xinxiang—Shijiu RailwayRailway,parallel with the Liangyungang—Lanzhou Railway.is a double—line electrified railway for the mixture of the passenger and freight traffic and a part of the transportation corridor.With the increase of the traffic volume,its transportation capacity is rather tight.The neighbor railways that can divert the freight traffic is currently under construction and the tight situation of the transportation capacity of the Houma—Xinxiang—Shijiu Railway can be relaxed after completion of the neighbor railways.The main technical standards and freight flow directions of the railways in the corridor are different because the Houma——Xinxiang——Shijiu Railway joins with the Jiaozuo—Liuzhou,Beijing—Guangzhou and Beijing—Kowloon railways.How to enhance the coal transport capacity of the railway with small investment in a short period of time is the urgent problem to be solved for enhancing the transportation capacity of the coal from west to east.
2013 Vol. 30 (6): 1-3 [
Abstract
] (
2689
)
HTML
(1 KB)
PDF
(794 KB) (
390
)
4
Study on Timing of Building Beijing——Shenyang High——speed Railway
LI Yong—jin
Research purposes:According to the functional orientation of the Beijing—Shenyang High—speed Railway in the railway network and the network plan for passenger outgoing and incoming of the Shanhai Passage,this paper systematically studies the timing of building the Beijing——Shenyang High——speed Railway through the comprehensive analysis and prediction of total passenger transportation volume of outgoing and incoming of the Shanhai Pass,the reasonable functions of various railways,the annual adaptability and transportation efficiency of existing railways and the demands of regional economic and social development.Construction of high—speed railway takes long time with the larger amount of investment,and it has the big influence on the local economic and social developments,SO the decision—making process is very complicated.The adaptability analysis of the corridor and passenger traffic volume related to the railway network is the most basic data for the decision—making on the timing of building the railway,but it is not the only determining factor.In addition,the regional economic development,improvement of comprehensive efficiency of railway network and environment change caused by the construction also should be fully taken into account.The research methods and ideas on the timing of building the railway presented in this paper can be as the reference to the similar works.
Research conclusions:conclusions:(1)From the views of meeting the traffic demands of outgoing and incoming of the Shanhai Pass and optimizing the railway network structure,the railway construction should be complete by 2020 in order to relax the traffic pressure and improve the service quality of the passenger outgoing and incoming of the Shanhai Pass.(2)From the views of promoting the coordinated development of the regional economy and improving the construction environment,the railway construction can change the poor transport situations of Chengde,Chaoyang and Fuxin areas along the railway,develop and enrich the travel resources and maintain the closely economic exchange of Beijing and Shenyang with the surrounding areas,and it is crucial to promotion of the coordinated development of the regional economy.(3)From the view of the projectg economic benefits,the two rapid passenger corridors with large traffic capacity will be formed after building the railway and they can enhance the railway network flexibility because they have enough traffic capacity in the early days after railway building.The trains of the different grades can run to meet the demands of the different passengers to reflect the public welfare and basic features of the railway.(4)The research on the method for the timing of building the railway presented in this paper is available for planing and construction of the transportation infrastructure.
2013 Vol. 30 (6): 4-9 [
Abstract
] (
4890
)
HTML
(1 KB)
PDF
(498 KB) (
101
)
10
Study on Adaptability of Chongqing——Huaihua Railway Construction wi Local Social -economic Development
YAO Ming
Research purposes:China witnessed an unprecedented upsurge in railway construction from 2000 to 2010 when the trans—regional trunk lines were built and opened to traffic one after another.The transportation demand is crucial to the railway planing and construction and the construction standard and process rely on the transportation demand level.It is necessary to sum up and research the necessity,opportunity and standards of the railways constructions in the last decade to meet the demands of the local economic development.
Research conclusions: (1)Through the comparison and analysis of the local economic developments,transportation development and railway transportation before and after railway construction,the Chongqing—Huaihua Railway in general has met the requirement of the local social and economic developments and building the railway is a wise decision-making.(2)From the antecedent view,the Chongqing—Huaihua Railway was not built on full consideration of the traffic demand.It would be more reasonable to build the railway in the earlier five years.From the advanced view,the more social resources would be saved if double line was built for one time.(3)After opening to traffic for two years,lots of defaults are exposed,such as being insufficient of equipments and carrying capacity,passenger station faraway from towns and the not closely matching with the local planning.All these indicate that the concept of”Putting people first”was not implemented fully in the design,and the demands of the convenience,durableness and perfection are not met while the basic transport requirement are satisfied.(4)The advanced thought and foresight are needed to the railway construction on consideration of the local macro development trend and this is experience of the long - term traffic developments at home and abroad.Only in this way,can the railway construction well adapt to the local economic development.
2013 Vol. 30 (6): 10-16 [
Abstract
] (
4841
)
HTML
(1 KB)
PDF
(1122 KB) (
311
)
17
Research on Analysis Methods for Structural Dynamics on Considering the Effect of Constant Loads
ZHANG Ran,WANG Xin—min
Research purposes: When doing the research on the structural dynamic characteristics,the simulation analysis of the structural dynamic response that meets the engineering accuracy requirements is crucial to achieving the reality and veracity of the structure analysis.When making the analysis of the structural dynamic response,the effect of initial stress derived from constant loads on the 1ater performances can not be neglected.For example,the increase of self—weight of the bridge can be seen as the reduction of the proportion of the vehicle weight in the whole system,resulting in reduction of the impact of vehicle on the bridge.This paper researches and discusses the time—history analysis method for the response of structures under constant loads with the ANSYS software and presents two feasible methods of the stress—inputting method and slow dynamic method.These methods has the guidance meaning for the time——history analysis of nonlinear structures.
Research conclusions:In analysis of linear elastic structures,the final result can be obtain by superposition of the static response and dynamic response.Whereas for the nonlinear structures,with superposition,the truth can not be got.The stress——inputting method and slow dynamic method presented in this paper are feasible and applicable for dynamic response analysis of structures affected by constant loads.With the former.the dead loads and dynamic 10ads shall be put together in the steady—state analysis and transient analysis respectively.With the later,the both loads will be put together in the transient stage.The two methods can be applied in both linear elastic dynamic analysis and nonlinear dynamic analyses.
2013 Vol. 30 (6): 17-21 [
Abstract
] (
2635
)
HTML
(1 KB)
PDF
(344 KB) (
218
)
22
Analysis of Slope Landslide of Taigong Station of Lanzhou - Chongqing Railway
QIANG Xin-gang
Research purposes:When digging to earth - rock interface of the right cutting surface,multiple retrogressive tensile fractures appeared to the right ground of the cutting of the end area of the Taigong Station and the varying degrees of slide also appeared to the right slope to form the engineering landslide. Through analyzing the reasons for the engineering slope of the Taigong Station of the Lanzhou 一 Chongqing Railway, this paper puts foreward the treatment measures and ideas on how to strengthen the survey of high slope and deep cutting area and summarize the survey and test methods fo providing the reference to the similar projects.
Research conclusions:1) When the cutting soil layer is rather thick,the retaining engineering should be done first in the construction process and the monitoring of the slope on the both sides should be strengthened. ( 2 ) In the thick red soil layer area, the necessary retaining measures should be taken to the soil cutting or half soil and half rocky cutting with abundant groundwater. (3) When the parent rocks is possible to produce the dilatability argillaceous rock in the thick soil area, three indexes of the expansive soil should be distinguished to determines the soil nature for providing the reliable basis for the design and construction. (4) For high slope and deep cutting surveys, the exploration points should be rationally arranged according to concrete topographical conditions and the control sections should be properly arranged. In addition, the transverse width of the survey should be increased. ( 5 ) The result can be widely applied in the survey and construction of high slope and deep road bed of railway and highway.
2013 Vol. 30 (6): 22-25 [
Abstract
] (
2643
)
HTML
(1 KB)
PDF
(842 KB) (
246
)
26
Application and Discussion on Comprehensive Analysis Method in Evaluation of Slope Stability
LI Guo-sheng,LIU Zhen-tian
Research purposes:The slope analysis is a complex work affected by various factors. There are more problems related to the slope stability because the railway engineering is a linear engineering, especially when railway crossing mountains. It is difficult to reflect the true stress and stability states of the slope by using one traditional slope stability analysis method. How to properly and reasonably analyze the slope stability becomes a difficult problem. In this paper, the finite element method is used to analyze the slope stability and compared with the traditional method, and some new ideas on how to analyze the slope stability are given out for providing the reference to the analysis of the slope stability.
Research conclusions:As the slope stability analysis is a comprehensive work, first the analogy method should be used to make qualitative analysis of slope stability based on the previous experience of the similar projects and then the limit equilibrium method should be used to make the quantitative analysis of the slope stability,and the model should be built to make simulation analysis if necessary. Finally the numerical simulation should be done with the finite element analysis software to find the weaknesses of the slope stress state so that the corresponding preventive measures can be taken with relatively low cost. The results of this study can be applied in the analysis and design of slope,particularly suitable for the alignment of the mountain railway and highway and slope design, and can effectively improve the efficiency and accuracy.
2013 Vol. 30 (6): 26-29 [
Abstract
] (
2597
)
HTML
(1 KB)
PDF
(1266 KB) (
171
)
30
Evaluation Method for Increase of Shear Strength of Soft Soil Foundation
PAN Xiao-cheng,LI Jing,XION Jin
Research purposes:There are three methods for comparing and evaluating the increase of the shear strength of soft soil foundation : the effective stress method, effective consolidation pressure method and specification method. When describing the increase of the shear strength of the unit soil on one spot,It is necessary to indicate the stress state of the unit soil and research the increase of the shear strength of the soil surface.
Research conclusions:(1) For the unit soil of the dam foundation s middle axle or the toe, when the effective stress method is used,the increase of the shear strength of the large main stress acting face is bigger than that of the shearing damaged face,and the increase of the shear strength obtained by using the specification method is between the above values. (2) For soil - stone dam built on the soft soil foundation, the increase of the unit soil of the dam foundations middle axle becomes less with the increase of the depth after its consolidating for a period of time while in the unit soil of the toe,this kind of becoming less trend is not obvious. ( 3 ) This research result is available for researching the increasing regulation of the shear strength in the drainage consolidation.
2013 Vol. 30 (6): 30-33 [
Abstract
] (
2647
)
HTML
(1 KB)
PDF
(363 KB) (
120
)
34
Calculation of Retaining Structure for Frame - type Deep Cutting and Comparative Analysis of Support Effect
LI Kun
Research purposes:Compared with construction of Harbin West Station,a new kind of retaining structure of the frame - type pile plate wall for the deep cutting was presented and the calculation and analysis were made for its structure compared with the retaining structure of the boring pile to verify its distinctions with the conventional retaining structures in the areas of load bearing,deformation and stability.
Research conclusions:(1) The frame - type pile plate wall is connected as a whole through its transverse supports to form a frame - type integral spacial structure. (2) The frame 一 type pile plate wall has the features of the evenly loading bearing, entirely coordinated deformation and high stability. So it can reach at the height that the conventional retaining structure can not reach at, with less impact on the surrounding building so that the land acquisition and demolition works can be much reduced. (3) Compared with the conventional retaining structure, the frame - type pile plate wall can play a big role in ensuring the stability of the deep cutting under complex environment and restricting the level shift of the soil on the both sides of the cutting and raising movement of the cutting foundation so that the landslide and unstability of the cutting can be effectively prevented and the stability of the whole cutting structure can be guaranteed. (4) This research result is available for the cutting project that needs high retaining and for constructions of railway and highway in the city proper with complex environment and in the narrow space,and it has the reference and applicable meanings for planing and construction of the similar railways.
2013 Vol. 30 (6): 34-38 [
Abstract
] (
3228
)
HTML
(1 KB)
PDF
(1332 KB) (
231
)
39
Research on Technologies for Laying Ballastless Track on Existing Subgrade
LI Qing-hai,XING Fu-qiang,JIANG Chu-sheng,LI An-hong
Research purposes: With the development of ballastless track technology of high—speed railway,more and more railways need laying the ballastless track.So it is necessary to research how to lay the ballastless track on the existing subgrade.Taking one oversea project as an example,this paper discusses the ways of laying the ballastless track on existing subgrade.
Research conclusions:(1) Compared with the standard code for the ballastless track of high - speed railway in China, the thicknesses of the bedding surface and bottom of the railways built with the UIC and the French high - speed railway code are thinner, but the compactness is over high. (2) When the QS2 or QS3 grade filling material is used, it can meet the requirement of the Chinas high - speed railway standard,but when the Qsl grade filling material is used, it can not meet the the Chinese standard unless the material is improved- (3) For the treatment of the transition section, the requirement of the Chinese standard is low, but it can be reinforced by enhancing the stiffness of some parts of the bedding. (4) The settlement control standard for the subgrade designed and built with the French experience is more concrete and more strict than the UIC and is the basically same as the Chinese standard. The gap between the France and China can be filled by prolonging the resting time of the embankment or by over filling and compressing.(5) According to the above comparison and the surveys results of the subgrade bedding,subgrade,foundation and transition section, the areas that do not meet the laying requirement can be reinforced by taking measures of refilling, strong compacting,grouting and using the CFG pile and pile - slab structure,and those that meet the laying requirement can be directly used. (6) This research result can provide the reference to laying the ballastless track on the existing subgrade built with the UIC and the French standard and laying the ballastless track on the existing subgrade in China.
2013 Vol. 30 (6): 39-42 [
Abstract
] (
2793
)
HTML
(1 KB)
PDF
(865 KB) (
308
)
43
Research on Measurement Methods for Track Geometry with CPIV
FU Heng-you,LIU Cheng-long
Research purposes:The track geometry survey should be carried out before the fine adjustment of high — speed railway tracks. The current method is to use the CPIII resection at freely - occupied station for the track geometry measurement and compare the measured data with the designed parameters, and then the fine adjustment is made to make the various parameters of track regularity meeting the design requirements. Based on the features of track reference network ( CPIV) that its adjacent points have higher relative accuracy and its control points can be reserved forever for the operation maintenance, this paper presents a new method for the track geometry static inspection by using track gauge along with the force - centering device used for the occupied station and backsight on CPIV points. The trials on site with this method have been carried out in the practices.
Research conclusions:(1) The method of force - centering occupied station on CPIV for the static inspection of track geometry of ballastless slab has the merits of the short setting time and high efficiency. (2) By using the high precision between adjacent points, this method can ensure the high regularity of the track,and the experiments on site prove the measured results are correct and reliable, satisfying the code requirement. (3) The application of the CPIV network for track geometry can unify the control references for the track slab and track fine adjustment, getting better regularity indexes and being worthy of wide application. (4) The research achievement can be applied in the static inspection of track geometry on the stages of construction and operation maintenance,and has the reference value for the code compilation and improvement.
2013 Vol. 30 (6): 43-46 [
Abstract
] (
2772
)
HTML
(1 KB)
PDF
(838 KB) (
441
)
47
Research on Selections of Bridge Site and Type of Hutiaoxia Jinsha River Bridge
LIU Wei, CHEN Ke-ian, YOU Li-hui
Research purposes:The Hutiaoxia Jinsha River Bridge is the key project of Lijiang - Xianggelila Railway and is located in the sensitive environmental and high seismic intensity region with the active fault. The reasonable bridge site and type should be selected for this bridge on consideration of the railway alignment, environment protection, topography,geological condition and the plan of hydraulic engineering on the midstream of the river.
Research conclusions:(1) Using the deck type steel braced arch at the No, 8 bridge site(416m) of the Hutaioxia Jinsha River Bridge is the best engineering plan. Using the steel truss suspension bridge at No. 27 bridge site (98 + 660 + 98 m) can remain the condition for the hydroelectric plan of river and can get the better economic and social benefits. The deck type steel braced arch has features of the good load bearing capacity, good rigidity and nice looking and is suitable for the high mountain and deep valley area,but it produces the impact on the water storage and shipping under bridge because the arch rib is installed on bottom of the structure. (3)The steel truss suspension bridge has the features of the fine anti - seismic performance and good rigidity to meet the train requirement. (4) The research result can provide the reference to the type selection of the large span railway bridge in mountain and deep valley area.
2013 Vol. 30 (6): 47-51 [
Abstract
] (
2630
)
HTML
(1 KB)
PDF
(1757 KB) (
328
)
52
Discussion on Calculation Model for Lining Structure of Shield Tunnel
DAI Zhi-ren
Research purposes:The compression spring calculation mode is commonly used for the arch bottom of the shield tunnel, but it lacks the theoretical support. The internal forces and the settlement deformation trend obtained with this model are less than and inconsistent with the real situation so as to make the safety factor over lower. In order to enforce the reliability and accuracy of lining structure design,the comparison and analysis of different calculation models are carried out,the fundamental reason for wide application of the compression spring calculation model is put foreward, and the reasonable calculation model is presented.
Research conclusions:(1 )The reaction force form of the foundation of the arch bottom of the tunnel is closely related to the displacement trend. When the arch bottom raises and deforms, the reacting force of the foundation is only composed of the counterforce,but when the arch bottom compressedly deforms,the reacting force is composed of the counterforce and the compression resistance of the foundation. (2 ) For the shield tunnel,the lining structure calculation model of reacting force on the arch bottom should be used and it can precisely reflect the load bearing characteristics and displacement trend,and overcome the security risk due to the insufficient safety factor. (3) The form of the reacting force on the arch bottom based on the displacement trend and the corresponding calculation model are put forward. (4) This research result can be applied in the shield tunneling project, mining project and open excavation subway station or subsurface excavation subway station.
2013 Vol. 30 (6): 52-58 [
Abstract
] (
2588
)
HTML
(1 KB)
PDF
(1951 KB) (
509
)
59
Design of Door - type Sealed Structure in Shallow Tunnel Under - passing Seasonal River Valley
PANG Tao, FANG Qian–bao
Research purposes:The terrain and geological conditions of the southwest mountainous areas are complicated. It is inevitable that tunnel of high - speed railway has to under - pass river valley. So when the shallow tunnel under - passes river valley,there is a high risk to bring about a lot of technical problems in the design. Taking the design of Yanshan Tunnel of Guiyang - Guangzhou Railway under - passing the Bakuang River as the engineering background, this paper researches the key design technologies for the shallow tunnel under — passing the seasonal river valley.
Research conclusions:(1) When shallow tunnel under 一 passes seasonal river valley,the main risk comes from the huge ground water inflowing into the tunnel possibly to produce the water and mud bursting and the collapse of subsurface cut tunnel and make the tunnel lining structure floating. (2) The construction risk can be much cut and structure can be safe and reliable by adopting the door - type sealed structure system composed of the secant pile, top beam, anti 一floating board,grouting to the rock in the framework and fully sealed lining structure of tunnel. (3) The working order of sealing before excavation and the effective risk control plan can ensure the construction safety and control the construction risk. (4)This study result can provide the reference to the similar projects.
2013 Vol. 30 (6): 59-63 [
Abstract
] (
4942
)
HTML
(1 KB)
PDF
(1800 KB) (
432
)
64
Study on Support Foundation of OCS Under Condition of Soft Soil Subgrade of Xuzhou - Lianyungang Railway
NG Man-hua,LI Fang-an,YANG Zhen-long,LI Wen-hao
Research purposes:During the electrified reconstruction of the Xuzhou 一 Lianyungang Railway, it was found the topsoil in Liangyungang area was soft clay like the marine clay and the muddy clay, with the mud silt under it. Under the effect of loading,the bearing capacity of the foundation was very low and the ground had a big settlement and deformation, easily resulting in the uneven settlement. When the external disturbances took place, the soil structure would be damaged with the sharp drop of the soil strength. So the geological condition in this area was extremely poor for the project. Considering the actual situation of the electrification reconstruction of the railway, it was necessary to do the study on the treatment plan for the support foundation of OCS under condition of soft soil subgrade of the Xuzhou - Liangyungang Railway.
Research conclusions:(1) In the high filling region with deep topsoils, the “T - type” foundation would be adopted, with its flange to bear the vertical loads so that the foundation would not settle. It had less impact on the traffic safety because of the less excavation of the deep soft soil. (2) In the subgrade region with the filling thickness of less than 2. 0 meters, the shallow foundation with the expanded underside would be designed. After replacement of substrate material, some parts of the soft soil subgrade would be reinforced by filling the flagstones and compacted by filling the sandy and stony soils. When the bearing capacity of the foundation met the design requirement, the shallow foundation with the constructed so as to lower the requirement of the foundation for the bearing capacity of the undisturbed soil. (3) The shallow foundation with the expanded underside was proved safe and feasible by the field testing. The horizontal displacement of the foundation surface, the foundation torsional angel and the support deflection met the technical demands of the design. (4)This research result could provide the reference to the similar works.
2013 Vol. 30 (6): 64-68 [
Abstract
] (
3382
)
HTML
(1 KB)
PDF
(848 KB) (
286
)
69
Research on Untwining Plan for Freight Train of Chongqing - Guizhou Railway Accessing into Guiyang Hub
LI-Jie,YAO Chuan-kai
Research purposes:The Chongqing - Guizhou railway is a line for the mixed passenger and freight traffic, and is an important part of the convenient,rapid,large capacity channel from the Sichuan,Chongqing and the northwest area to the Guizhou, Guangxi, Hainan, Guangdong areas. The line needs to access into the Guiyang hub in the northern city and the passenger train of the railway accesses into the Guiyang Bei Station. But where does the freight train access into the Guiyang hub is the urgent problem to be solved because it relates to the disturbance level to the city planing and the construction investment. This paper compares and analyzes the two optional plans of accessing the freight train into the Dulaying Station via connecting line and accessing the fright train into the existing Sichuang - Guiyang Railway via connecting line to determine the more reasonable plan.
Research conclusions:From the analysis of the line direction of the Chongqing - Guiyang Railway after it accessing into the Guiyang hub,it is concluded : ( 1) The plan for the freight train of the Chongqing - Guiyang Railway accessing into the Guiyang hub should consider the demands of the upgrading of the existing railway line to reduce the abandon projects in long — term future. (2) The plan for the fright train accessing into the existing Sichuang - Guiyang Railway via connecting line can save the construction investment and has a good coordinations with the projects in the near future and long - term future. (3) This research can provide the reference to the similar works.
2013 Vol. 30 (6): 69-72 [
Abstract
] (
2519
)
HTML
(1 KB)
PDF
(1240 KB) (
170
)
73
Study on Scheme for Selection of Station Type of Guiyang East Station
HAN Chang-heng,YAO Chuan-kai
Research purposes:With the Chongqing - Guiyang,Chengdu - Kunming,Changsha - Kunming and Guiyang - Kaiyang railway lines accessing into the Guiyang hub as well as the northwest and northwest loop lines of the Guiyang hub open to traffic,the general pattern of the Guiyang hub has to be adjusted. The Guiyang East Station is the station where the railway lines accessing into. How to choose the station type of the Guiyang East Station is crucial to the planning design of the Guiyang East Station in order to give the full play to the station function,optimize the route of passenger train and save the construction cost as much as possible. This paper intends to determine the reasonable and economic station type of the Guiyang East Station through comparing various station types.
Research conclusions:From the research on the schemes of the station types of the Guiyang East Station,it is concluded the layout of distributed yards should be adopted when several lines accessing into,the layout of the yards for the different lines should be adopted when there is a little exchange trains among the lines and the layout of the yards for the different directions should be adopted when there are many exchange trains among the lines. The method for selection of the general station type presented in this paper can provide the reference to the similar works.
2013 Vol. 30 (6): 73-77 [
Abstract
] (
2571
)
HTML
(1 KB)
PDF
(631 KB) (
132
)
78
Analysis of City Regional Rail Transit Construction and Development of Wenzhou
YANG Zhou
Research purposes:Research purposes : Currently, the city regional rail transit in most cities in China has been used as a meaning to solve the traffic problem. Based on the analysis of the current development situation and overall plan of Wenzhou, the introductions are given in this paper to the necessity, planning ideas and technical features of the city regional rail transit construction for providing the basis for the construction and development of the city regional rail transit.
Research conclusions:(1 ) The construction of city regional rail transit should fully consider the current development situation and overall plan of the city and meet the traffic demand and development characteristics of city. (2) Based on the compreh ensive analysis and study on the compliance of the planning,the speed target value,the transfer mode, engineering economy, traction power system and signal system, the city regional rail transit plan and system can be determined. (3) The construction of Wenzhou regional rail transit is very crucial to building the development pattern of the " 1650" large city and improving the urban traffic system, and it can provide the reference to the similar works.
2013 Vol. 30 (6): 78-82 [
Abstract
] (
2754
)
HTML
(1 KB)
PDF
(1339 KB) (
391
)
83
Necessity of Planning and Building Intercity Railways in Hubei Province
SHEN Hong-shan
Research purposes:This paper analyzes the regional, economic and population distribution features of the Hubei Province and researches the necessity of building the intercity railways in Hubei Province on consideration of the railway network planning, the function orientation and corresponding technical standards for providing the reference opinions on building the intercity railways in Hubei Province.
Research conclusions:(1) Construction of the intercity railways should fully considers the urban development features,the urban overall planning and the intercity railway network planning to meet the traffic demands among the cities. (2) The comprehensive analysis of the layouts of the tracks and network should be made according to traffic plannings between cities, such as the passenger flow distribution and the other transportation modes. (3) The radiate intercity railway network of "one loop and five axles" for the Wuhan city cycle,with the total railway length of over 1 000 km is presented in the research and it belongs to the moderate level of the developed city cycle in China. (4) The research result presented in this paper can provide the reference to the intercity railway development of the other cities and city.
2013 Vol. 30 (6): 83-87 [
Abstract
] (
2907
)
HTML
(1 KB)
PDF
(443 KB) (
193
)
88
Development and Research on Data Bank for Standardization Design of Rail Transit
YANG Yi-qiu, ZENG Guo-bao, LI Shuo
Research purposes:The standardization design of rail transit is very crucial to the enterprise development. In this paper,the introduction is given to the development process and development content of the data bank for the standardization design of the rail transit,the research is done on the data bank platform,the structural pattern of the data bank and the selection of development language, and the analysis of the key technology for the data bank system was made to determine the expected system function.
Research conclusions :(1) The establishment of the data bank for the standardization design should fully consider the characteristics of the all specialties and select the appropriate data bank structure. At the same time, the selection of the management platform of the data bank should meet the requirements of the large storage volume, rapid searching and common sharing, with the high security, high — efficiency and high reliability. (2)The server/client data bank system by using the SQL Server + Visual Studio can meet the requirements of the common sharing of data, reliable storage and backup, enhance the working efficiency and reduce the cost. (3)The application of the data bank system for standardization design of the rail transit can play a very important role in standardizing the rail transit design,accumulating the construction experience and developing the urban rail transit. This research can provide the reference to the similar works.
2013 Vol. 30 (6): 88-91 [
Abstract
] (
2645
)
HTML
(1 KB)
PDF
(1274 KB) (
461
)
92
Analysis of Technical Condition of Interconnection and Interoperability between City Regional Railway and National Railway
WANG Wei-li
Research purposes:The city regional railway is gradually becoming an important rail transit mode from the downtown to the new city,with the characteristics of high speed,large traffic capacity and public transport. The relation between it and the national railway is becoming important increasingly. This paper, taking the Line SI of the Wenzhou Regional Railway as an example,comprehensively analyzes some technical issues on the interconnection and interoperability between the city regional railway and the national railway so as to offer the basis for the decision - making on the current urban construction.
Research conclusions:(1)The interconnection and interoperability between the city regional railway and the national railway can be convenient for the through passenger flow between the city regional railway and the national railway,but the traction mode, power supply system,signaling system and gauge of the city regional railway must be compatible with those of the national railway. (2) After the EMUs run on the national railway,it will produce the big impact on the traffic capacity of the city regional railway, resulting in the unsmooth transport organization and operation management of the city regional railway. The construction investment will increase because the gauge of the city regional railway has to meet the requirements of the national railway. So the Line SI of the city regional railway should not be interconnected and interoperable with the national railway. (3)This paper provides the theoretical evidence for the construction of the regional railway and also provides the valuable reference to the study on the relation between urban rail transit and national railway.
2013 Vol. 30 (6): 92-96 [
Abstract
] (
2822
)
HTML
(1 KB)
PDF
(427 KB) (
342
)
97
Application of Prestressed Concrete in the Large Span Underground Structures
TANG Jian
Research purposes: The sectional size and reinforcing bar of the common reinforced concrete underground structure will increase with increase of its span. The member of the common reinforced structure is difficult to meet the structure security demands when its span increases to a certain sense. It is necessary to research the design process of the prestressed structure and the calculation model and introduce the prestressed reinforced concrete into the design of the underground structure in order to make the underground spacial structure bigger and deeper. Research conclusions: (1) In the frame system, the two - way prestressed beams are easy to produce the large secondary internal force to largely increase the stress to the beam - column node and at the same time, the number of beam prestressed bars will substantially increase, so it is difficult to control the construction process. (2) Therefore, in the large - span underground structure, application of the prestressed beams and the common concrete stringers frame system mode not only makes the load transfer simpler and clearer and makes the load bearing of the structure more reasonable, but also makes the structure more economic. (3) The research can provide the reference to the design of large span underground structure.
2013 Vol. 30 (6): 97-102 [
Abstract
] (
2617
)
HTML
(1 KB)
PDF
(714 KB) (
252
)
103
Analysis of Dynamic Response of Subway Station under Horizontal Seismic Action
DU Xing-hua
Research purposes: This paper researches the dynamic response of a soil - structure system of one subway station under the seismic load with ANSYS software and analyzes the issues on establishment of the system interaction model for the soil structure, the determination of the model parameters and the setting up of the artificial boundary condition to seek the internal force and deformation behaviors of the subway station under seismic action.
Research conclusions : (1) The characteristics of the dynamic response of underground structure was associated with the soil characteristics. The horizontal deformation of the underground structure was limited by the soil, with its movement with the soil and a little variation along the structure height. (2) The moment of the outside component was larger because of the direct contact with the soil. (3)The earthquake can increase the moment and the shearing force to the middle column significantly, so the column would be more easy to be damaged. (4)The results can provide reference to the seismic design of subway station or other underground structure.
2013 Vol. 30 (6): 103-108 [
Abstract
] (
2678
)
HTML
(1 KB)
PDF
(1342 KB) (
82
)
109
Research on Time Series Model for Price Margin Coefficient of Railway Engineering Material
LIU Zhen
Research purposes :The price margin coefficient of material is an important parameter for compiling the budget of railway engineering. However, it is difficult to control the project investment because the issuing time of the price margin coefficient often lags behind and the material price often fluctuates due to the market influence. In this paper, a new model is presented for forecasting the expected value of the price margin coefficient of the railway engineering for the purpose of effective control of the project investment.
Research conclusions :(1) With the combination forecasting methods, the regression model for the price margin coefficient is built by using the curve fitting method and modified by using the residual series ARMA model and then the regression ARMA combination forecasting model is built to forecast the expected value of the price margin coefficient of railway project for effective control of the project investment. (2) The combination fitting model has good fittingness. By using this model, the material price margin coefficients from 2009 to 2011 were checked and the forecasting values were well fitting with the actual values. (3) The combination forecasting model presented in this paper is available for the investment estimate of the planned project, the investment evaluations of the medium and long term projects, the cost control of the undergoing project and the bidding price of contracting project.
2013 Vol. 30 (6): 109-112 [
Abstract
] (
2681
)
HTML
(1 KB)
PDF
(296 KB) (
152
)
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech