关闭×
Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
2011 Vol. 28, No. 5
Published: 2011-05-15
1
Application of Advanced Geological Prediction System TSP 203 Plus in Advanced Geological Prediction of Fault for Construction of Gaozhuding Tunnel
HU Hui - rong,YU Gui
Research purposes: The fault F1 at the Gaozhuding Tunnel is a huge fault and it may produce some effects on stability of surrounding rocks during the tunnel construction ,so it is necessary to conduct the accurate advanced prediction of the fault.
Research conclusions: ( 1) TSP 203 plus is a long distance geological prediction system,and the distance is in 100 ~ 150 m; ( 2) Application of TSP 203 plus in the advanced geological prediction can rapidly and accurately judge the geological condition of the predicted area and it is crucial to choice of the construction scheme and measures of the tunnel,with the obvious economic benefits. ( 3) The application of the TSP 203 plus in geological prediction of the F1 fault for the Gaozhuding Tunnel guaranteed the construction safety and speeded up the construction process while the some experiences of the advanced geological prediction for tunnel were accumulated.
2011 Vol. 28 (5): 1-4 [
Abstract
] (
2602
)
HTML
(1 KB)
PDF
(563 KB) (
214
)
5
Advanced Karst Geological Forecast Area for Wayaopo Tunnel
DOU Shun,HOU Dian - ying
Research purposes: The geological conditions of Wayaopo Tunnel are complex and unfavorable with the structural abrasion,karst,shallow - buried gully,fracture zones and so on. In order to prevent the tunnel collapse,mud irruption,water bursting and other accidents,it is necessary to enhance the precision of the geological forecast for the karst tunnel.
Research conclusions: ( 1) Based on geology method,the type,location and scale of the karst cavity were predicted mainly by using the advanced geological forecast system TGP206. ( 2) The seismic reflection method was available for forecast of the structure profile of the long - distance unfavorable geological body. ( 3) The GPR was available for the forecast of short - distance unfavorable geological body.
2011 Vol. 28 (5): 5-8 [
Abstract
] (
4896
)
HTML
(1 KB)
PDF
(400 KB) (
177
)
9
Post - evaluation Analysis of Landslide Treatment
Geng Qiang,Cao Ji - shi,Wu Xi - yong
Research purposes: A feasible evaluation method and system for the post - evaluation of Landslide treatment has not formed . This paper analyzes all the relevant factors of the post - evaluation of landslide treatment,comprehensively compares and judges these factors with two by two,and offers a feasible evaluation method and system.
Research conclusions: For the post - evaluation of landslide treatment,the 12 main factors that affect the evaluation results are listed,including the quantitative factors and qualitative factors. On consideration of the factors weights and experts' weights,finally the comprehensive landslide evaluation model is established to determine whether the effect of the Landslide treatment is reasonable and appropriate or not for providing the scientific,rational and theoretical basis to the post - evaluation of the landslide treatment.
2011 Vol. 28 (5): 9-12 [
Abstract
] (
2551
)
HTML
(1 KB)
PDF
(264 KB) (
174
)
13
Study on Progressive Destroy Mechanism and Protection Methods for Bedding Plane Landslide
WU Kun
Research purposes: Due to the might - be serious project risk and the difficult remediation of long and large bedding plane landslide,this paper analyzes the sublevel sliding destroy mechanism and proposes protection methods for concrete construction.
Research conclusions: ( 1) The piecewise progressive destroy results from the combined effect of force condition and the soften characteristics of charcoal mudstone,with slippery characteristics playing a major impact; thus the charcoal mudstone should be paid special attention to in construction. ( 2) Anti - slide pile is considered as a major remediation towards such landslide,however,because of the landslide's deformation displacement and the limited time,it is better to use the AF&SPP( Anchor Frame and Steel Pipe Piles) methods on landslide management.
2011 Vol. 28 (5): 13-16 [
Abstract
] (
2687
)
HTML
(1 KB)
PDF
(496 KB) (
175
)
17
Application of Three - Dimensional Finite Element Method Limit Equilibrium Method for Slope Stability Analysis
LI Hong - jun,SHAO Long - tan
Research purposes: As an extension of two - dimensional FEM limit equilibrium method,the three -dimensional FEM limit equilibrium method based on the concept of strength reduction and the unique sliding direction,is presented. The definition and physical meaning of factor of safety ( FOS) ,the relationship between FOS and unique sliding direction are clarified as well as the application in earth and rock slope. On the basis of mean value theorem of integrals,the FOS corresponding to sliding body of arbitrary shape is defined. The relationship between partial FOS and overall FOS can be demonstrated by the definition of factor of safety in this approach.
Research conclusions: ( 1) the factor of safety and critical sliding surface for soil and rock slopes calculated from the proposed approach are in good agreement with those from 3D rigid limit equilibrium method and 3D shear strength reduction method. ( 2) 3D problem shouldn't be modeled as a 2D one owing to obvious spatial effect when the axial length of slope is short,the factor of safety obtained by 2D method is conservative. However,the stability analysis for 3D problem can be approximated by a corresponding 2D problem when the axial length of slope reaches a certain value.
2011 Vol. 28 (5): 17-21 [
Abstract
] (
2689
)
HTML
(1 KB)
PDF
(783 KB) (
376
)
22
Study on the Deformation Behavior of Soft Soil Subgrade under Dynamic Load
LIU Sheng - chuan,CAO Yuan,YANG Zhi - wen
Research purposes: To study the subgrade deformation characteristics under cyclic loading and identify the dynamic characteristics of embankment,the basic conditions of the test section of the Jiaozhou - Xinyi Railway are introduced in this paper. A theoretical analysis of the relationship between subgrade settlement and time is made and the model for calculation of the subgrade and equation for soil constitutive are given. Through studying the elastic and plastic deformation characteristics of the subgrade under dynamic load,the decay curve of the subgrade dynamic stress is obtained.
Research conclusions: ( 1 ) The practical strain wave propagates within limited depth and its elastic deformation is generally small under 5m of the subgrade . The proportion of the elastic dynamic strain is small with less than 0. 06% and it decreases with increase of the depth,so the elastic dynamic strain makes little impact on the post - construction settlement of the soft soil subgrade. ( 2 ) After doing the dynamic tests of 1. 5 million times,the subgrade plastic deformation values are as follows: the plastic deformation of graded crushed stone subgrade is 27. 35mm and the loose soft plastic deformation is 2. 67mm. The impact of the dynamic load on post - construction settlement mainly reflects in bedding,and the post - construction settlement is stable after 1 year.
2011 Vol. 28 (5): 22-26 [
Abstract
] (
2593
)
HTML
(1 KB)
PDF
(504 KB) (
161
)
27
Red Clay Subgrade Settlement Calculation Methods in Ballastless Track Design on High - speed Railway
YANG Xiao,YANG Guolin
Research purposes: Considering high requirement and strict control on post - construction settlement of high - speed railway, settlement properties of red clay foundation was studied. Furthermore, proper settlement calculation method and corresponding modification coefficient was obtained after comparative analysis.
Research conclusions: Red clay foundation settlement was calculated by E S method,e ~ lg p method,3D stress method, secant modulus method and field test method,by which following conclusions could be drawn: settlement obtained from theoretical methods varied linearly with load increasing,however,significant deviation appeared with heavy load. Calculated settlement by layer - wise summation method was closest to measured value,while 3D stress method and secant modulus lead to a significantly larger settlement. Based on measured settlement,all calculations were modified in which ES method resulted in a closer curve.
2011 Vol. 28 (5): 27-33 [
Abstract
] (
2678
)
HTML
(1 KB)
PDF
(517 KB) (
277
)
34
Reseach on Application of Composite Foundation of Composite Pile for New Yingkou Station of Harbin - Dalian High - speed Railway
Zhang Xianjun Zhao Shiyun
Research purposes: As the embankment of the Yingkou Station of Harbin - Dalian High - speed Railway is situated on the base of the littoral precipitation facies with thickness of 55m,there is no hard soil bedding as the supporting bedding to the CFG pile. The bearing characteristics of the foundation and deformation characteristics are not good for construction of the high - speed railway. In order to ensure the subgrade settlement meets the the code requirement,the new composite structure of CFG pile ( long pile) ,MIP pile ( short pile) ,bedding and reinforced concrete was used for the first time to reinforce the foundation of Harbin - Daling High - speed Railway. The measurement and analysis of the bearing situation and settlement deformation of this composite structure were made.
Research conclusions: In this new composite foundation,the CFG piles bears the most loads of the soiling filling of subgrade,the MIP pile bears some loads of the soil filling of the subgrade and the soil between piles bears a little load of the soil filling of the subgrade. They bear the load together and it satisfy the bearing capacity of the subgrade and fit to the design concept of the composite foundation. This new composite structure can control the total settlement and uneven settlement while make the rapid completion of the foundation settlement to ensure that the post - construction settlement can meet the code requirement and the track stability of high - speed railway is good during the operation. The research result is of the great significance and reference to the design and construction soft soil foundation.
2011 Vol. 28 (5): 34-39 [
Abstract
] (
2863
)
HTML
(1 KB)
PDF
(720 KB) (
71
)
40
Cooling Effect of Measures for Rubble Subgrade Convection of Chaidaer - Muli Railway
CHEN Ji,SONG Rui - fang,SHENG Yu,DONG Xian - fu,ZHANG Lu - xin
Research purposes: The total length of Chaidaer - Muli Railway is 142. 04km and lots of the unstable and extreme unstable permafrost regions under high temperature are scattered along the railway with the rich ice content of the frozen soil. The frozen soil subgrade faces the situations of the back slope and front slope because the Chaidaer - Muli Railway is from the southeast to northwest. The rubble convection subgrade was adopted in the area of 53km. To ensure the stability of the railway subgrade,it is necessary to analyze and research the cooling effect of the measures for the rubble subgrade convection.
Research conclusions: The monitored data obtained since 2007 show in the warm permafrost region,only the shadow parts of the rubble convection subgrade and the base of the slope can be cooled by adopting the rubble convection subgrade and convection berm and in the low - temperature stable permafrost region,application of rubble convection not only cools the subgrade base,but also plays a certain role in restraining the back slope and front slope.
2011 Vol. 28 (5): 40-44 [
Abstract
] (
2571
)
HTML
(1 KB)
PDF
(500 KB) (
266
)
45
Simulation Study on Impact of Track Irregularity on Dynamic Response of Vehicle
FANG Jian,LEI Xiao - yan,LIAN Song - liang,LIU Lin - ya
Research purposes: The main purpose is to study the impact of curved track irregularities on vehicle dynamic characteristics with the measured data and simulation calculation. With the measured data on the curved track irregularity from the track inspection car,the statiscs analysis was made for the relation between the track irregularity of speed - raise railway and the vehicle vibration acceleration and the primary estimation of track spectrum of Wuhan - Jiujiang Railway was made. The vehicle - track dynamic model was established with the software Adama / Rail to analyze the impacts of the types,amplitude and wavelength of the track irregularity on the stability and safety of the vehicle with the measured data. The wavelength range of the track irregularity that negatively impacted the train running was offered.
Research conclusions: The vertical track irregularities produced the obvious impact on vehicle vertical vibrations. And the track direction irregularities produced the obvious impacts on both vertical vibrations and transverse vibrations. In order to avoid the resonance of the train at the speed of 110 km / h,the track irregularities of 2. 5 m,3. 72 m,20 m and 28 m wavelengths would be controlled.
2011 Vol. 28 (5): 45-50 [
Abstract
] (
2745
)
HTML
(1 KB)
PDF
(1766 KB) (
610
)
51
Analysis of Periodic Track Irregularities on the Bridges of Chengdu -Dujiangyan Intercity Railway
YANG Fei,SONG Guo - hua,LI Guo - qing
Research purposes: Since the Chengdu - Dujiangyan Intercity Railway was open to traffic,the periodic track irregularities on the bridge have been found by many inspections of the track dynamic profile. In order to dynamically know the impact of the periodic track irregularities on the safety and comfortableness of EMU,this paper analyzes the cause for the irregularities and development law of the irregularities with the statistical methods and dynamics simulation technology.
Research conclusions: The analysis results show that the periodic track irregularities on the bridge may be mainly caused by the concrete 's shrinkage and creep or the low stiffness of bridges. In addition,the irregularity of the 32 m -wavelength on the bridges is exactly in the ranges of sensitive wavelength of the trains at the speeds of 160 km / h and 200 km / h. Under the same amplitudes,the maximum vertical acceleration response is got at the speed of 200 km / h and the maximum unloading rate response is acqured at the speed of 160 km / h,and when the amplitude reaches at 7 mm,the vertical acceleration is over 0. 15 g,which exceeds comfortableness index Ⅱ. So it is necessary to treat the track irregularity on the bridge.
2011 Vol. 28 (5): 51-55 [
Abstract
] (
2609
)
HTML
(1 KB)
PDF
(603 KB) (
156
)
56
Research on Bridge Splicing Technology for Expressway Extension Project
XING Fang - yi
Research purposes: As the bridge splicing technology is complex,the quality of bridge splicing must be controlled strictly during the construction. In this paper,taking Shixunhe Bridge of the Quanzhou - Xiamen Expressway in Fujian as an example,the introduction is given to the research and analysis of the technology of T - style bridge splicing during the expressway extention project for the purpose of providing the reference to the similar design and construction works.
Research conclusions: By adopting the technology presented in this paper to widen and splice bridge,the born loads of the widened bridge and primary bridge are specialized with no influence each other. In this way,the construction procedure is simplified,the reinforcing steel bar quantity of primary bridge is reduced,the construction difficulty of bridge splicing is cut,no influence is produced on the original highway traffic,the construction safety is ensured and the construction cost is reduced,obtaining good economic benefits.
2011 Vol. 28 (5): 56-59 [
Abstract
] (
2572
)
HTML
(1 KB)
PDF
(488 KB) (
509
)
60
Estimation of Heat - harm of Gaoligong Mountain Tunnel of Dali - Ruili Railway
HOU Xin - wei,LI Xiang - quan,JIANG Liang - wen,DU Yu - ben,DENG Hong - ke,ZHOU Zhi -chao,LIU Ling - xia
Research purposes: The high temperature heat - harm is one of common geological disasters of deep - buried long tunnels. According to the practical data,and considering the influence factors,such as the lithology,fault,ground temperature,hot spring,the main reservoir structure,and the major river,the heat - harm danger in the tunnel area was estimated and sorted with the weights and and grade standards by utilizing analytic hierarchy process and expert evaluating method,and the GIS space analysis for the purpose of providing the reference to the selection,design and construction of the tunnel in high temperature region.
Research conclusions: The heat - harm in the studied area was generally distributed in the west area from the north and in east area from the south,obviously controlled by the fault,and concretely speaking the heat - harm was mainly distributed in granite and metamorphosed rock regions. Along the C12K route,there were four sections where the hot water - bursting was easy to happen, featured with the fault concentration, located in the magmatic area and metamorphic areas or catchment basin edge.
2011 Vol. 28 (5): 60-65 [
Abstract
] (
2614
)
HTML
(1 KB)
PDF
(607 KB) (
228
)
66
Analysis of Mechanism of Water Leakage Induced by Longitudinal Uneven Settlement of Shield Tunnel
LIU Yin,ZHANG Dong - mei,HUANG Hong - wei
Research purposes: As the lining of the metro shield tunnel is commonly assembled of the jointed segmental precast concretes,during the operation of the subway,the longitudinal uneven settlements will happen due to various factors,resulting in enlarging the joint opening of the adjacent segments to cause water leaking between adjacent segments. It is necessary to analyze and research the mechanism of the water leakage of the shield tunnel.
Research conclusions: The longitudinal uneven settlement of the tunnel will make opening of the circumferential seam and weaken the property of the water resistance of the elastic gasket,resulting in water leaking between segments. The long coefficient influenced by the circumferential joints produces little impact on circumferential seam while the stiffness ratio of the different circumferential width and different bolts with the concrete will produce a certain impact on the opening of the circumferential seam. The big stiffness ratio of the circumferential width and bolts with the concrete is not good for the waterproofing of the joint segments. This research can provide the reference to the waterproofing design and maintenance of the tunnel.
2011 Vol. 28 (5): 66-70 [
Abstract
] (
2610
)
HTML
(1 KB)
PDF
(519 KB) (
265
)
71
Countermeasures for Energy - saving and Emission Reduction of Highway Tunnel
WANG Shao - fei,TU Yun,DENG Xin
Research purposes: Highway tunnel needs consumption of a large number of energy,the China's transport authorities focus on its energy - saving and emission reduction. Research shows that there are still many deep - rooted problems in the energy - saving and emission reduction of highway tunnel while making some progresses. On the basis of analyzing factors that effects the energy - saving and emission reduction of highway tunnel,the countermeasures for energy - saving and emission reduction of highway tunnel are proposes from the systematic engineering angle for providing the reference to the further energy - saving and emission reduction of highway tunnel.
Research conclusions: At present,the problems in the energy - saving and emission reduction of highway tunnel in China mainly relate to the balance of economic and social benefits,wide application of the of energy - saving products and technology,standardization of the statistical index system for energy - saving,special fund for energy - saving and emission reduction and the supported of the relevant policies and regulations. The factors that affect the energy - saving and emission reduction include civil engineering structures,mechanical and electrical facilities,traffic characteristics, economic capacity and natural conditions. The countermeasures for the energy - saving and emission reduction of highway tunnel include the energy - saving by the structure,the energy - saving by technology and the energy - saving by management.
2011 Vol. 28 (5): 71-75 [
Abstract
] (
2519
)
HTML
(1 KB)
PDF
(432 KB) (
175
)
76
Research on Safety Assessment of High Speed Railway Power Supply System
DIN Jian - yong,SUN Jian - ming,ZHANG Hua - zhi,DIN Wei
Research purposes: Railway Power Supply System ( RPSS) is an important part of high - speed railway.Whether the power system is safe and reliable or not is related closely to security and stability of railway operation.Safety assessment is a vital element in modern management. But so far safety assessment of the high - speed railway power system is only in qualitative analysis stage with no quantitative indices and correlative methods. Integrates the safety assessment of RPSS with the standard EN50126, some proper safety assessment quantitative indices and corresponding methods of RPSS are proposed by the paper. It is availed reference for enhancing safety management of the RPSS.
Research conclusions: By means of the novel safety assessment method based on ETA and improved LEC,The safty quantitative analysis for typical RPSS example is presented,criticality indices of power supply facility and so the risk grade of system are got respected. The validity of the safety assessment method and quantitative indices put by the paper is convinced.
2011 Vol. 28 (5): 76-80 [
Abstract
] (
2561
)
HTML
(1 KB)
PDF
(278 KB) (
238
)
81
The Monitoring and Numerical Analysis of Deep Foundation in Subway Station
HUO Run - ke,YAN Ming - yuan,SONG Zhan - ping
Research purposes: In the process of underground engineering building,security and stability of metro community facility shows its own particularly significance. This paper illustrates a subway in digging process,observing and studying the security and stability of the soil and supporting research,provides reference for future construction of a subway station.
Research conclusions: Through comprehensive analysis and evaluation,we get the changeable regular pattern. Among the law,the horizontal displacement of digging deep retaining wall incremental growth from blew to top; during excavation,support axial force have obvious change,and ultimately to stabilize. Through the comparison of software, the conclusion was found that first line support for Foundation pit using reinforced concrete support is more reasonable,and exerting prestressing force on support is effectively to inhibit lateral displacement of diaphragm wall and soil.
2011 Vol. 28 (5): 81-85 [
Abstract
] (
2566
)
HTML
(1 KB)
PDF
(736 KB) (
259
)
86
Analysis of the Construction Deformation of the Foundation Pit Excavated for Metro Station Built in Soft Site
ZHUANG Hai - yang,WU Xiang - zu,QU Ying - jun
Research purposes: In this paper,the construction deformations of the foundation pit excavated for metro station built in soft site are counted in system. The settlement of the ground surface,the horizontal deformation of wall and the settlement of the upright column are analyzed based on the monitoring results. The conclusions and suggestions given in this paper can be referenced in design and construction of the similar foundation pit.
Research conclusions: ( 1) The ground surface settlement during the underground structure being constructed may be larger greatly than that during the foundation pit being excavated when the underground structure is built in the soft site. Accordingly,the deformation of the foundation pit during the underground structure being constructed must be intensified. ( 2) The horizontal deformation of the support wall is very sensitive to the excavation thickness and the properties of soil layers every time. It is obviously that the cumulate horizontal displacement of the support wall becomes increasing faster with the excavated depth of foundation pit increasing. ( 3) When the excavated depth of foundation pit and the thickness of soil layers laying under the bottom of foundation pit change obviously,the differential settlement of upright column must be considered carefully. ( 4) The space - time variation of the foundation deformation is obviously when the soft soil layers existing around the foundation pit. The excavation size of soils must be designed carefully.
2011 Vol. 28 (5): 86-91 [
Abstract
] (
2571
)
HTML
(1 KB)
PDF
(886 KB) (
358
)
92
Analysis and Discussion on Shield Lectotype Design for Kunming Metro
LIANG Bo
Research purposes: With the rapid construction of the Kunming metro,the shield construction begins to the sectional tunnel. How to make the lectotype of the main shield system to reduce the impact of the shield construction on the environment under the complicated hydrological condition of the sedimentary deposit of the Dianchi Lake and the special construction conditions is an urgent problem to be solved. According to the situation of shield excavation and based on the experience of the shield construction of the metro in other cities,this paper analyzes and discusses the tectotype of the main shield system to be used under the special geological conditions of the Kunming metro.
Research conclusions: The adaptabilities of the lectotype designs of the main shield system to the construction condition,such as physical structure,cutter head,drilling and excavation of shield machine,should be ensured to reduce the excavation risk except the necessary measures should be taken.
2011 Vol. 28 (5): 92-97 [
Abstract
] (
2747
)
HTML
(1 KB)
PDF
(671 KB) (
176
)
98
Research on Blasting Vibration Control of Tunnel Excavation of Qingdao Subway
XUE Li,SUN Fu - feng,SHI Yan - long,HAN Hui - hui,SUN Chao
Research purposes: Taking the experiment section of Line 3 of Qingdao subway project as the background,the test of the surface vibration vector resultant velocity caused by tunnelling was done to know the surface vibration characteristics and attenuation law induced by different types of hole when tunnelling and blasting the shallow tunnel,and the measures were offered for reducing the vibration on the premise of no cutting the tunnelling footage.
Research conclusions: The attenuation law relied on the blasting type for excavating the working face. With the number of blasting initiation section increasing,the K value of the attenuation formula decreased gradually; and the α value basically remained unchanged. According to the variation law and influence factors of K and α values,the additional measures were taken,such asundermining the central hole,improving the initiation blasting order and reducing the folder effect of blast,to reduce the velocity of blasting vibration to below 1. 5 cm / s.
2011 Vol. 28 (5): 98-101 [
Abstract
] (
2553
)
HTML
(1 KB)
PDF
(531 KB) (
245
)
102
Analysis and Discussion on Prominent Problems of Current Construction Market and Normalization of Market Competition Order
YANG Zong - lin
Research purposes: To normalize the market economic order,the state has issued many policies,laws and regulations since entering into the period of the market economy,but there are still no - order competition in the construction market,abnormal bidding and breaking the contract. So it is necessary to analyze the prominent problems of the current construction market and discuss the measures for normalization of the construction market to solve these problems.
Research conclusions: For solving these problems,it is necessary to further improve the legal system,normalize the all actions related to bidding,speed up the construction of credit evaluation system,manage the market by the different levels,promoter the EPC project,improve the project cost management system,normalize the payment and return of the guarantee deposit,cut the burden of the enterprise,establish the strict claim system and guarantee the legal benefits of the enterprise so as to ensure the healthy development of the construction industry.
2011 Vol. 28 (5): 102-105 [
Abstract
] (
2530
)
HTML
(1 KB)
PDF
(178 KB) (
127
)
106
Research on System - engineering - based Closed Loop Management Mode for Railway Engineering Project
YANG Ya - wei
Research purposes: How to scientifically and effectively manage the railway engineering project is crucial to the quality of the railway engineering. By adopting the traditional management mode,the engineering quality can be guaranteed in a certain sense,but there are still some problems,such as over investment,over scale,over standard,no supervision and over intervention by government. In this paper,based on the analysis of the these problems,the thoughts on the system - engineering - based closed loop management mode for the railway engineering project is offered.
Research conclusions: Based on the traditional management mode of design,bidding and building ( DBB) ,the thoughts on the system - engineering - based closed loop management mode for the railway engineering project includes the following seven management elements: the project approval, index design, bidding, engineering management,engineering supervision management,works acceptance and project evaluation. Based on this mode,the all roles related to in this management mode are sorted. The management of the railway engineering project is a complicated systematic engineering. Only one management mode can not cover and contain everything and the relatives managements are needed. This research result is of the great significance to the management of the railway engineering project.
2011 Vol. 28 (5): 106-109 [
Abstract
] (
2612
)
HTML
(1 KB)
PDF
(219 KB) (
167
)
110
Analysis of Legal Problems in Investing and Financing for BT Project
WU Qing
Research purposes: In recent years,the BT mode has been widely used for the infrastructure projects and the public utility projects,but up to now there is no special law on standardization and regulation of application of BT mode because its specificity of the legal theory is not well aware of,so the legal disputes and problems easily arise in the application. It is of the great significance for the construction enterprise to researching the legal problems in investing and financing for the BT project.
Research conclusions: For guaranteeing the quality and actual effect of the BT project,the government departments should adopt more flexible and wider competition modes for granting BT project. The government departments should grant the BT project to the high - qualified,perfect overall strength and good reputation enterprises by adopting many ways,especially adopting the bidding way. The state should issue the special law on standardization and regulation of the legal problems in application the BT mode.
2011 Vol. 28 (5): 110-114 [
Abstract
] (
2598
)
HTML
(1 KB)
PDF
(207 KB) (
261
)
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech