Study on Program of Shenyang - Dandong Passenger Dedicated Line
ZHENG He - min
Research purposes: The Shenyang - Dandong Passenger Dedicated Line is in the southeast of LiaoningProvince,passing through Shenyang,Benxi and Dandong cities,with he typical characteristics of passenger dedicated line in mountain area,such as undulatory terrains and the complex geological conditions. The study was done on the programs of the railway alignments in the terminal and section to get experience about the alignment of the passenger dedicated line in mountain area.
Research conclusions: Based on studying the program of leading Shenyang - Dandong Passenger Dedicated Line into Shenyang terminal,the program of track joining in Dandong area,the program of the railway alignment along the Shiqiaozi development zone between Shenyang and Dandong,the program of the railway alignment along the existing Shengyang - Dandong Highway,the program of leading the railway between Benxi and Tongyuanpu into Benxi original station and the program of leading the railway into Benxi East via Wolong,the proposals were made that on the premise of fully considering the functions of passenger dedicated line,the passenger dedicated line should coordinate with the urban plans and should be led into the urban central area as much as possible to convenience passengers' entrainment and detrainment and enhance the railway service quality.
2011 Vol. 28 (2): 1-6 [
Abstract
] (
2494
)
HTML
(1 KB)
PDF
(855 KB) (
177
)
7
Research on Scheme for Leading Pucheng - Meizhou Railway into Wuyishan Region
FAN Jun - huai
Research purposes: The research was done on the schemes for leading the Pucheng - Meizhou Railway into the Wuyishan region to make the scheme more reasonable in technology and economy and achieve the max. social benefits,on consideration of the construction investment, traffic channel integrity, passenger and freight traffic functions,coordination with urban planning,environmental impact,topographic and geologic conditions and other factors. The design ideas on the alignment of this railway could be as the reference to the alignment design of high - speed railway line for mixed passenger and freight traffic in a difficult mountain region.
Research conclusions: The deep analyses of the alignment scheme features and research thoughts on leading Pucheng - Meizhou Railway into Wuyishan Region were made to determine a reasonable recommended scheme. The process analyses of the alignment schemes reflected the importance and influence of railway network,environmental protection, geology,planning and engineering quantity on choice of the alignment scheme.
2011 Vol. 28 (2): 7-12 [
Abstract
] (
2647
)
HTML
(1 KB)
PDF
(398 KB) (
207
)
13
Research on Scheme of Leading Huaihua - Shaoyang - Hengyang Railway into Hengyang Terminal
HUANG Tie - lan
Research purposes: The research was done on the schemes of leading Huaihua - Shaoyang - Hengyang railway into Hengyang terminal in order to determine reasonable one.
Research conclusions: The construction of Wuhan - Guangzhou Passenger Dedicated Line,upgrading of Hunan - Guangxi Railway,construction of Hengyang - Chaling - Jian Railway,upgrading of Lei River Bridge and other construction projects in Henyang terminal have been completed successively,and the Huaihua - Shaoyang - Hengyang and Ankang - Zhangjiajie - Hengyang railways will be led into the Henyang terminal. As construction and upgrading periods were different,the construction and upgrading seriously interferred each other. Based on the analysis of the current situation of Hengyang terminal,and on consideration of the function orientation and construction schedule of the Hengyang - Chaling - Jian Railway,making full use of the completed project and avoiding waste,the study was done on the scheme of leading Huaihua - Shaoyang - Hengyang Railway into Henyang terminal via main track and the scheme of leading the railway into the Henyang terminal via the outside track. This paper compares these two schemes from the aspects of track length,construction cost and the railway operational situation. It was decided to adopt the first scheme.
2011 Vol. 28 (2): 13-15 [
Abstract
] (
2541
)
HTML
(1 KB)
PDF
(282 KB) (
494
)
16
Railway Alignment in Section between Xi'an and Shanchuan of Xi'an - Chengdu Passenger Dedicated Line in Daba Mountain Area
JING Ji - chang,JU Xiao - qiang
Research purposes: This paper comprehensively analyzes and studies the geological conditions of the Daba mountain area in the research range for the Xi'an - Chengdu Passenger Dedicated Line to define the railway alignment in the area with the better geological condition.
Research conclusions: The summariy was made on the characteristics of geological conditions in Daba mountainous area ,a number of the optionalconstruction plans of the Xian - Chengdu Passenger Dedicated Line were proposed,and the basic ideas and principles of the railway alignment were offered. The comparative analysis of the different construction plans in geological conditions showed the CK Plan was better than the others in hydrogeological conditions and engineering geology conditions.
2011 Vol. 28 (2): 16-20 [
Abstract
] (
2593
)
HTML
(1 KB)
PDF
(202 KB) (
72
)
21
Application of Fuzzy Comprehensive Evaluation in Railway Alignment
ZHANG Xia - Lin,FENG Tao
Research purposes: Application of the fuzzy comprehensive evaluation theory in railway alignment work can direct the railway alignment work.
Research conclusions: Recognizing and measuring the influence factors and using fuzzy comprehensive evaluation method to select the scheme for the actual engi neering have the important directive significance to the railway alignment. It can be seen from the actual engineering that the same evaluation factors will produce different results with the work going on and the influence factors being clear and meticulous. This method has been used for comparison and selection of two schemes for the railway,getting good result. This method also can be applied in comparison and selection of many schemes for the railway alignment.
2011 Vol. 28 (2): 21-26 [
Abstract
] (
2613
)
HTML
(1 KB)
PDF
(368 KB) (
124
)
27
Study on 3D Visualization Technology and Evaluation Method for Railway Engineering Geological Alignment
GAO Shan
Research purposes: According to the problems in the geological alignment of mountain railway,such as the complex geological conditions,many alignment schemes,long period of demonstrating scheme and hard decision - making,the study was done on the3D visualization technology for railway geological alignment and GIS evaluation method for engineering geological condition to realize the modularization,quantification and systematization of geological alignment and evaluation method.
Research conclusions: Through the studies on multi - source geological information integration, remote sensing information sampling,3D geography modeling and engineering geological evaluation method,the 3D visualization GIS integrated system was established to realize the functions of geological information management,spatial analysis, thematic mapping and 3D view,and improve the efficiency and reliability of railway geological alignment in mountain area.
2011 Vol. 28 (2): 27-31 [
Abstract
] (
2614
)
HTML
(1 KB)
PDF
(321 KB) (
183
)
32
Research on Inherent Failure Mechanism of Black Rock Slope
MA Jian - jun
Research purposes: The black rock slope along Guizhou - Guangxi High - speed Railway in Guilin of Guangxi province is easy to be destabilized due to the effect of external environment to produce the negative influence on the railway design and operation. The research was done on the inherent failure mechanism of the black rock to provide the theoretical basis for control of such slope.
Research conclusions: From the research it can be seen the conditions of black rock slope to generate weathering failure include development of joint fissure and existences of ground water flow and pyrite,and the acid water produced by the oxidation of pyrite is the major factor to cause the failure of the black rock slope. And this chemical effect can enlarge the pore space of the rock,lose and dissolve the material composition,and weaken the friction force between the particles on the rock surface. It is proposed the engineering measures of containing pyrite weathering and oxidation and the corruptive change of material composition should be taken for control of such type of slope.
2011 Vol. 28 (2): 32-36 [
Abstract
] (
2548
)
HTML
(1 KB)
PDF
(442 KB) (
146
)
37
Features and Practical Examples of Geological Alignment of Guizhou - Guangxi Railway
HUANG Bo
Research purposes: As the topographic and geologic conditions of the areas where the Guizhou - Guangxi Railway passes are extremely complicated,the railway alignments were made again for the main optional construction schemes during the periods of feasibile study and preliminary design based on the new technical requirement and standard and in combination with the complicated topographic and geological conditions along the railway. This paper reviews and summarizes the comparison and choice of the optional schemes for the railway alignments in the sections between Jinchengjiang - Nachao and Nachao - Dashan for the purpose of providing the reference to the railway alignment in the karst and soft soil area.
Research conclusions: By comparing and selecting the optional schemes and following the principle of keeping the railway away from goaf and soft soil areas for the railway alignment in karst and soft soil areas,the track conditions were improved and the safety hidden danger was eliminated,obtaining good social and economic benefits.
2011 Vol. 28 (2): 37-43 [
Abstract
] (
2612
)
HTML
(1 KB)
PDF
(1006 KB) (
140
)
44
Research on Applicable Mechanism of Pipe Pile in Subgrade Engineering of Passenger Dedicated Line
LIU Yong - chao,XU Zai - liang,ZHANG Jin - song,WANG Qing - long
Research purposes: Pipe pile has been widely applied in construction of passenger dedicated line and high -speed railway. Combining the design,construction and subsidence monitoring of the Beijing - Tianjin Intercity Railway,the applicable mechanism of the pipe pile in the subgrade engineering was systematically studyed for further understanding of the pipe pile's bearing capacity and the roadbed's actual settlement characteristics,and for the study on the pipe pile's shear performance and role in guaranteeing the subgrade stability.
Research conclusions: Pipe pile featured with the high strength, short construction period and easy control of construction quality can meet the high demand of construction of passenger dedicated line with less total settlement and less settlement velocity at the different phases compared with other reinforcement methods. In the soil foundation,under the action of horizontal force,pipe pile is in failure state due to the bending moments. The check calculation of the entire stability of the subgrade is made with the shear strength,resulting in high safety coefficient valuations. The load bearing modes of the pipe pile include the modes of pile - raft structure,pile - board structure and pile - net structure.It is proposed to strengthen control of the construction quality,to improve the strength of soil between piles and the pipe pile's top connections and to do the research on pile - beam structure.
2011 Vol. 28 (2): 44-51 [
Abstract
] (
2607
)
HTML
(1 KB)
PDF
(886 KB) (
297
)
52
Research on Design of Waterproof and Drainage for Subgrade of Passenger Dedicated Railway
YANG Jun
Research purposes: As the train runs at high speed on passenger dedicated railway,the technical standard of passenger dedicated line is high,requiring that the slope preservation and drainage facilities have enough strength,stability and durability. The effects of water immersing,saturating and flushing soil are the major causes for the appearance and development of subgrade diseases,and even the factors of impacting roadbed security and stability.Selecting proper engineering measures and promptly draining the water collected in slope and slope toe and draining underground water are crucial to guaranteeing the traffic safety of passenger dedicated line with high speed.
Research conclusions: Considering the conditions of topography,geology,hydrogeology and other factors,the technical measures and suggestions are offered to subgrade waterproof and drainage engineering to ensure the structural strength and stability of the subgrade through doing the study on slope protection and waterproofing and drainage system for the subgrade of passenger dedicated line.
2011 Vol. 28 (2): 52-55 [
Abstract
] (
2607
)
HTML
(1 KB)
PDF
(297 KB) (
142
)
56
Research on Selection of Maximum Gradient for Datong - Xi 'an Passenger Dedicated Railway
MIAO Ming - ming
Research purposes: The section between Huozhou - Hongdong of Datong - Xi'an Passenger Dedicated Line had to cross the Huoshan mountain chain with steep terrain. In order to effectively decrease the negative impact of 24. 7 km long tunnel with unfavorable geological condition on the railway construction and operation,the research was done on the maximum gradient value for the railway.
Research conclusions: The discussion and technical and economic comparison were made for three schemes of 20‰ gradient,25‰ gradient and 30‰ gradient in the Huoshan crossing section,and the simulations of acceleration and breaking performances of the 250 - 300 km / h EMU running on long slope were made. If the 30‰ gradient was used, the Huoshan long slope tunnel could be cancelled and the construction investment could be saved. So the 30‰ gradient was determined as the maximum gradient in some difficult sections of this railway.
2011 Vol. 28 (2): 56-60 [
Abstract
] (
2619
)
HTML
(1 KB)
PDF
(489 KB) (
331
)
61
Comparative Analysis of the Ballast Track Design Standards of High - speed Railway between China and France
ZHANG Hong - ping
Research purposes: The track types of high - speed railway include ballast track type and ballastless track,and each has its own advantages and disadvantages. In France,ballast track is used for high - speed railway and France has the muture experience in laying ballast track of high - speed railway. It is very important to know what is the same and different in the ballast track design standards between China and France when designing the ballast track in China. This paper comparatively analyzes the ballast track design standards for high - speed railway between China and France.
Research conclusions: From the analysis it can be seen the most of the product standards are the basically same or equivalent,including the rail standard,fastening standard,sleeper standard and ballast standard,a few of the Chinese standards are higher than the French standards,including the precision of static laying ballast track and the precision of welding joint,and some standards are different in the content and system structure,including track bed standard,CWR standard,installation standard of rail expansion joint and track maintain standard.
2011 Vol. 28 (2): 61-64 [
Abstract
] (
3566
)
HTML
(1 KB)
PDF
(203 KB) (
1256
)
65
Analysis of Longitudinal Mechanics Behaviour of Ballastless Slab Track on Long Grade Bridge
WANG Wei - hua,LIU Kei - fei,LI Pei - gang
Research purposes: The analysis of the longitudinal mechanics behaviour of the ballastless slab track on long grade bridge under the effects of the temperature load and train load was made for providing the theoretical basis for the design of the long grade ballastless track.
Research conclusions: The finite element method was used to set up a longitudinal integration calculation model of rail -track slab - bridge - pier based on the longitudinal interaction mechanism of line - bridge - pier,and the corresponding general calculation program was compiled. With the program,the longitudinal stresses behaviour of the commonly - used 5 × 32 m simply - supported beam bridge and continuous bridge of passenger dedicated line were calculated,and the analyses of the parameter influence of the fastener longitudinal resistance,resin elastic modulus of the convex plate, friction coefficient of the bottom track slab and the temperature load value were made. The calculation results show ( 1) For the long grade slab track,the longitudinal relative displacements of rail - slab and slab - bridge should be limited within the range of 0. 2 mm and the corresponding resin elastic modulus of convex plate should be larger than 120 MPa. ( 2) The brake effect and longitudinal component force of live load should be applied to the bridge on long grade to make the computational check of convex plate. At the same time,the convex plate structure should be strengthened and the bonding strengths of convex plate,filling resin and track slab should be enhanced.
2011 Vol. 28 (2): 65-70 [
Abstract
] (
2606
)
HTML
(1 KB)
PDF
(829 KB) (
370
)
71
Study on Impact of Lateral Force of Heavy Haul Railway on Rail Overturn
CHANG Wei - hua
Research purposes: With the continuous development of the heavy haul railway in China,the lateral force between wheel and rail is gradually increasing. The track resistance capacity of lateral force has become a key factor of controlling the track stability and train running saftety. Therefore,the study on the corresponding critical lateral force of the track boundary is crucial to guaranteeing the safety of railway transportation.
Research conclusions: The structure model established with the finite element software ANSYS was adopted to analyze the impact of the rail lateral force of heavy haul railway on the fastening stress,lateral deformation of rail head,rail base elevation and rail pad deformation,and the change regulations of deformation and stress of all track components were obtained. According to the simulation of track structure,when the lateral force on rail was bigger than 250 kN,the rail overturn possibly happed.
2011 Vol. 28 (2): 71-73 [
Abstract
] (
2564
)
HTML
(1 KB)
PDF
(245 KB) (
198
)
74
Design and Calculation Analysis of Joint of Beam - column Constructed with Top - down Method
GAO Xi - liang1,LUO Zhi - yong1,LAI Yun - jin2,GAO Yan - bin2
Research purposes: The calculation analyses,including 2D and 3D finite element analyses,joint analysis and design calculation on consideration of all working conditions,were made for the inner forces and deformation behavior of the joint of beam - column of a subway station constructed with top - down method to solve the key design problems. According to the measured data on the deformation and born load of the structure,the design parameters and construction procedures were adjusted to ensure the smooth completion of the design and construction.
Research conclusions: For the design and construction of joint of reinforcement concrete steel tube column and reinforcement concrete beam - slab structure,a structural form called combination structure of steel ring plate -reinforcement concrete ring beam is presented. In which,the steel ring plate bears the shear force and reinforcement concrete ring beam bears the moment respectively. This kind of joint has the following advantages: clear load distribution,easy construction and being produced in factory to ensure its quality and reduce the construction cost and time.
2011 Vol. 28 (2): 74-79 [
Abstract
] (
2541
)
HTML
(1 KB)
PDF
(1162 KB) (
413
)
80
Study on Shear Buckling Property of Corrugated Steel Web PC Combined Box Girder
HU Hua - wan,LI Jun,QIANG Shi - zhong
Research purposes: The corrugated steel web of corrugated steel webs prestressed box girder is in pure shear stress state. The shear - resistant capacity of the corrugated steel web depends on the shear buckling strength of the section. The simulation was done for the defect of corrugated steel web with uniformly defect modal analysis method,and the defects were included in the material nonlinearity and geometric nonlinearity. On the basis of it,the study was done on the influences of corrugation configuration and the overall profile dimensions of the corrugated web on the ultimate shear bucking bearing capacity of the corrugated web and buckling mode for providing the reference to calculation of the similar bridge.
Research conclusions: Through comparing the results of theoretical formulas and model analysis,the change tendencies of the thickness of corrugated steel webs ,wave height ,the obliquity of inclined plate,the width of straight section and the height of bean were obtained.
2011 Vol. 28 (2): 80-83 [
Abstract
] (
2593
)
HTML
(1 KB)
PDF
(350 KB) (
177
)
84
Occurrence Mechanism and Prevention of Water - bursting Hazard for Karst Tunnel
ZI Yi,MA Shi - wei
Research purposes: Aiming to the presence of great loss and casualties caused by frequent geological hazard of water - bursting during large tunnel construction in karst zone,the occurrence mechanism and prevention of water -bursting hazard for karst Tunnel had been studied with the plate theory and shear failure theory for the purpose of knowing the occurrence conditions of water - bursting,taking the prevention measures and working out the construction principle.
Research conclusions: There must be four basic conditions for occurrence of water - bursting. The rock plate is easy to become slack,resulting in water - bursting due to the change of the stress field of rock mass and the effect of water pressure in the tunnel. The principle of draining water to cut the water pressure,conducting the advanced support,and ponding muddy water along with draining clean water should be followed in karst tunnel construction.
2011 Vol. 28 (2): 84-89 [
Abstract
] (
2564
)
HTML
(1 KB)
PDF
(462 KB) (
161
)
90
Assessment and Control of Water Loss Risk of Jinshazhou Tunnel of Wuhan -Guangzhou Passenger Dedicated Line
HAN Qiang
Research purposes: Water loss of the earth surface becomes more and more serious problem in construction of mountain tunnel. It's very necessary to recognize the risk of such problem and take the measures for control of such risk.
Research conclusions: Combined with construction of Jinshazhou Tunnel of Wuhan - Guangzhou Passenger Dedicated Line,by analyzing every fact that influences the risk of water loss,the hierarchy structure model was developed with AHP analysis method to get every factor's relative weight. Based on the sort of compound weight,the risk factors having significant impact on the water loss risk of the earth surface were distinguished,and the weak points in all aspect were found out. So the effective measures should be worked out to control and reduces the risk and the impact of the tunnel on environment for ensuring safe construction of tunnel and achieving the effective control of the risk. Such theory,method and thoughts on control of the risk could be as the reference to the similar works.
2011 Vol. 28 (2): 90-94 [
Abstract
] (
2658
)
HTML
(1 KB)
PDF
(332 KB) (
218
)
95
Characteristics of Geological Forecast for Construction of Complex Karst Tunnel of Yichang - Wanzhou Railway
CHEN Yi - min
Research purposes: The Yichang - Wanzhou Railway is in the very complex geological condition area where was called as the " forbidden zone" of railway construction,and there was a huge geological risk in tunnel construction.The main body of Major tunnel was buried deep inside mountain. The technical means of investigation only could detect the shallow statum,and it was difficult to detect deep stratum. So the contradiction between " Unable to fully detection and requiring full detection" always existed in tunnel construction. In order to solve this contradiction,what to do was to strengthen the geological survey work by conducting geological forecast for tunnel construction based on the previous geological survey.
Research conclusions: The " classification of geological complexity in tunnel construction " was researched and developed to realize the " geological prediction design for tunnel construction" and place it into the standard management range. This method could ensure the safe construction of tunnel and push forward the geological forecast work with obtaining good result.
2011 Vol. 28 (2): 95-102 [
Abstract
] (
2552
)
HTML
(1 KB)
PDF
(963 KB) (
439
)
103
Analysis of Surrounding Rock Displacement of Subaqueous Tunnel with Complex Geological Condition
XIANG Xiao - hui,WANG Li,LI Chun - guang
Research purposes: The Liuyanghe Tunnel in Changsha is a bi - way and four - lane tunnel with complex structure and it is composed of a small - distance tunnel,split tunnel and cut - cover tunnel. The monitored results of settlement and convergence of surrounding rock in subsurface excavated area and the analyses of the measures taken in construction and the procedures of tunnel excavation of Liuyanghe Tunnel can be as the reference to construction of the subaqueous tunnel in Changsha.
Research conclusions: The research results show if the measuring point is embed after excavation of core soil,the losses settlement is large. The full - face curtain grouting can be used to reinforce the surrounding rock to achieve better control of the vault settlement of the tunnel. The removal of temporary support has small impact on the displacement of surrounding rock. Using the three bench method and center diagram method to construct the subaqueous tunnel ,the displacement of surrounding rock canbe controlled well.
2011 Vol. 28 (2): 103-108 [
Abstract
] (
2856
)
HTML
(1 KB)
PDF
(976 KB) (
258
)
109
Research on Intercity Rail Transit Planning for City Belt of West Taiwan Strait
DENG Zhen - lin
Research purposes: With the development of the west Taiwan strait economic zone being raised to the national development strategy,the city belt of the west Taiwan strait is advancing toward urbanization,coastal and network - oriented development. According to the development experience of the city belt in the world,to build high -efficient,rapid and environment - friendly intercity passenger traffic system is crucial to easing the tension situation of regional transportation,to satisfying the passengers ' dem and of fast traveling among cities of the west strait economic development zone,to promoting regional integration urbanization process,to enhancing the economic radiation power,and to promoting the social and economic coordinated and sustainable development in the region. Based on the < < Long and medium - term Development of National Rail Network Planning > > and the < < Railway Network Planning for the Economic Development Zone of the West Taiwan Strait > > ,the research was done on development of the intercity rail transit in the cities of the economic development zone by trying to use the surplus capacities of the planed railway and the railway under building.
Research conclusions: According to the characteristics of the economic development zone of west Taiwan Strait,the function orientation and development strategy objectives of the intercity rail transit of the city belt of the west TaiwanStrait are offered. According to the resource of the existed railway and railway under building in this area,the adaptation of the capacity is analyzed after implementation of the Long and medium - term Development of National Rail Network Planning,the plans on running intercity train on the intercity rail transit by using the railway surplus capacity are presented,and according to the characteristics of the city belt,the plan and construction plan of intercity rail transit as well as the plan of running the intercity train are put forward.
2011 Vol. 28 (2): 109-114 [
Abstract
] (
2603
)
HTML
(1 KB)
PDF
(567 KB) (
398
)
115
Discussion on Power Supply to Midway Fan Room in Subway Section
LIU Yong - hong
Research purposes: The discussion is made on the optimization of power supply to the midway fan room in subway section to ensure that the high - power fan can start reliably in case of accident for reducing the accident loss as much as possible.
Research conclusions: When there are two fans with each power of 90kw and the total electric load more than 200 kW of the midway fan room and the distance of power supply is longer than 250 m,the high voltage power supply is always designed. Application of soft start mode to the high - power fan can cut the current of transformer's low voltage side,so the relative small capacity transformer is used with less investment. In case of the accident,the two fans can start at the same time with reliability.
2011 Vol. 28 (2): 115-117 [
Abstract
] (
2553
)
HTML
(1 KB)
PDF
(251 KB) (
190
)
118
Proposition of Layout of Freight Yard of Dalian Terminal
WANG Qiao,ZHANG Meng - tao
Research purposes: The layout of railway freight yard is an important part of urban freight traffic planning.Whether the layout of railway freight yard is rational or not not only influences the function of railway,but also influences the development of the city. In order to meet the new demand of Dalian overall planning and enhance the railway transport efficiency and reasonability,it is necessary to research the layout of freight yard of Dalian terminal.
Research conclusions: The freight traffic pattern of Dalian terminal is composed of five freight yards in order to coordinate with the urban overall planning,meet the urban freight traffic demand,achieve the concentrated and specialized management and enhance the efficiency of railway transport.
2011 Vol. 28 (2): 118-121 [
Abstract
] (
2517
)
HTML
(1 KB)
PDF
(306 KB) (
173
)
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech