2010 Vol. 27, No. 9
Published: 2010-09-15

 
1 Dewatering Design and Subsidence-monitoring of Deep Foundation Pit Adjacent to Existing Railway Line
ZHANG Nan, HU Peng-hui
Research purposes: Dewatering from deep foundation pitwill certainly arouse the subsidence of surrounding environment. According to the condition that the deep foundation pitof the building of Tianjin West Station of Beijing-Shanghai High-speed Railwaywas adjacent to the existing railway line, a three -dimensional see page model was used to simulate the seepage field inside and outside the deep foundation pitand the effective dewatering design scheme was adopted to ensure the safety of excavation ofdeep foundation pitand the traffic of existing railway. At the same time, the monitored data on subsidence were analyzed for providing the reference to the similar works.
Research conclusions: In order to ensure rationality and validity of a dewatering design, the dewatering design must consider engineering geological conditions, hydraulic geological conditions and foundation bracing system to select reasonable hydrological parameters and make analysis of seepage flow with three -dimensional seepage mode.l The dewatering should be conducted strictly according to the dewatering design scheme with immediate dewatering and dynamic control to reduce dewatering depth ofpressure -bearingwater foreffective controlling the subgrade subsidence around the foundation pitasmuch as possible and ensuring the railway traffic.
2010 Vol. 27 (9): 1-4 [Abstract] ( 2592 ) HTML (1 KB)  PDF  (1037 KB)  ( 165 )
5 The Dynamic Analysis of the Existing Railway’s Subgrade Settlement Caused by Excavation Pit on Hu—Ning Line
LUO Kun,LEI Xiao—yan
Research purposes: With the increase of high—speed train’s speed,the dynamic response of track structure will be increased,which requires more about the track geometry.This paper takes the excavation pit on Hu—Ning intercity passenger rail by the side of existing railway line for example to analyze dynamic response of subgrade settlement caused by the excavation pit.
Research conclusions: In order to analyze the subsidence of roadbed caused by excavation of foundation ditch,the numerical model was set up,which is composed of two parts,including the vehicle—track—roadbed—ground coupling system and the roadbed—ground—ditch—supporting structure coupling system.It is shown that the depth.Support Method. and the load will induce the different sedimentation of the roadbed.The vertical dynamic displacement in the three cases is between 0.8 to 1.6 mm.and which come up to the standard.
2010 Vol. 27 (9): 5-8 [Abstract] ( 2557 ) HTML (1 KB)  PDF  (331 KB)  ( 125 )
9 Research on Soil Squeezing Effect of Pile Sinking of PHC Pile for Subgrade of High—speed Railway
LEI Yu,ZHANG Zhen,KONG Qing—zhe
Research purposes: In order to monitor the change of pore water pressure,the displacement of deep soil body and the elevation of the elevation of the pile top in the process of the construction of pretensioned prestrssed pipe pile of roadbed around the Hongqiao Station of Hongqiao integrated transportation hub in Shanghai for well knowing the effect of the process of pile sinking on soil squeezing against the soil body around the pipe pile,the research was done on the specific measures for effectively reducing the soil squeezing effect for the purpose of controlling and reducing the effect of the pile sinking against the surrounding soil structure.
Research conclusions: The monitoring result proved that the distance to the pilling area Was shorter and the effect of soil squeezing was bigger,the accumulated growth of super pore water pressure Was bigger.The depth WasS deeper,and the accumulated growth of super pore water pressure was bigger.By the monitoring of the super pore water pressure and the displacement of deep soil body,the construction speed and sequence were adjusted for the pile base construction.The soil squeezing of pipe pile Was obvious because the main direction of displacement was the reverse direction to the pilling.Therefore,before the placing of pile,the measure of deviation was taken to minimize the influence of the piling against to the existed pile.In the area where needs to control the soil body dispacement,the piling speed and the direction weFe strictly controlled,and at the same time,skip—piling technique was used to effectively reduce the soil squeezing by piling.
2010 Vol. 27 (9): 9-14 [Abstract] ( 2601 ) HTML (1 KB)  PDF  (518 KB)  ( 180 )
15 Study on Stability of Bridge Pile Foundation in Permafrost Area along Qinghai—Tibet Railway
MI Wei-jun,LI Yong,SHI Gang—qiang,QU Yao—hui
Research purposes: The uncertainties in the strength,homogeneity of pile and refreezing and deformation of soil around the pile existed to the pile foundation in permafrost area.To ensuer the smooth construction and the safe operation of the Qinghai—Tibet Railway,the bearing capacity test of the bridge pile foundation was carried out and the long—term monitoring for the ground temperature and deformation were conducted.In order to evaluate the stability of the bridge foundation of Qinghai—Tibet Railway,based on the long—term monitoring system for the bridge pile in the Qingshuihe experimental section and the bridge pile foundation of Qinghai—Tibet Railway,this paper studies and analyzes the homogeneity,static elastic modulus,compressive strength,static load and the characteristics of monitored ground temperature and deformation of the bridge foundation cross—section.
Research conclusions: The study results showed the integrality and homogeneity of concrete pile were rather perfect and there was no major quality defects like segregation.The majority of the compressive strength of concrete pile was between 28—33 MPa.and coe侬cient of variation of compressi。ve strength was only 0.14. and the static modulus of elasticity was 2.40×104 MPa.All these met the technical requirements.The artificial upper table for soil around the pile was between 0.08-0.2 m.and deformation of pile foundation in permafrost area was less than 10 mm,which satisfied the post— construction deformation demands for the ballasted deck piers.It was concluded the bridge foundation of Qinghai—Tibet Railway was stable.
2010 Vol. 27 (9): 15-19 [Abstract] ( 2578 ) HTML (1 KB)  PDF  (446 KB)  ( 229 )
20 Test and Analyses of Stress of Spatial Thin—wall Structure
DENG Rong,LI Cheng—jun
Research purposes: Based on the load test for the 4×1 28 m continunous steel truss girder bridge of the Jiaozhu—Liuzhou Railway,this paper describes the theory and method for testing the stress of spatial thin—wall structure and analyzes the stress performance of the main bar member,the power transmission characteristic and the stress condition as well as the secondary stress influence based on the theoretical calculation and tested data.
Research conclusions: This analysis reveals:(1)The steel truss girder bridge main bar is mainly bearing the axial force,which is consistent with the design theory.(2)The effect of the spatial load transferring of the bridge is associated with the connection stiffness of the bars,the bar location and the load location,and to simplify the calculation of the load distribution between the two main trusses with the leverage method is safe.(3)Compared with the plane stress model,the stress of bottom chords calculated with the space beam element model is smaHer by 9.9%~16.4%,and the verification coefficient to compute statistics structure with the plane trussing model stipulated in the”Code for Inspection of Railway Bridges”only has the reference meaning.(4)Under the condition of main force combination,the actual stress of each test member is smaller than the design permission stress and has certain margin for safety.(5)The secondary stress of the member is proportional with the rigidity of the gusset plate and member.
2010 Vol. 27 (9): 20-24 [Abstract] ( 2593 ) HTML (1 KB)  PDF  (491 KB)  ( 154 )
25 Dynamics Modeling for Structure of Bridge Erecting Machine and Analysis of Dynamic Characteristics
WU Xiao,LUO Wei,HU Xiao—le,ZHOU Xiao—ke
Research purposes: A dynamic model for the typical operating conditions of the bridge erecting machine is established through rational simplification and theoretical derivation to analyze the dynamic characteristics of bridge erecting machine for the purposes of providing the theoretical basis to improve the dynamic performance,optimize the structure and offer the technical support for developing the bridge erecting machine with good dynamic performance,light weight and low—cost.
Research conclusions: Based on the analysis of operating processes of JQ 900 series of bridge erecting machine with the finite element method,a dynamic model was established for the dangerous working condition of the bridge erecting machine.The dynamic model was simplified through the calculation and simulation of support stiffness of tire with the contact finite element method and energy method,and the calculation formula for natural frequency and corresponding vibrationl shape of bridge erecting machine were obtained.Compared with the calculated results of the finite element, the kinetic model Was verified.The new formula and corresponding vibration shape provide a theoretical basis for the dynamic optimal design of the beam structure of the bridge erecting machine.
2010 Vol. 27 (9): 25-30 [Abstract] ( 2630 ) HTML (1 KB)  PDF  (470 KB)  ( 258 )
31 Analytic Solution of Complex Function to Distribution of Seepage Field of Tunnel with High Water Pressure
WU Jin-gang, TAN Zhong-sheng, HUANG Pu-ming
Research purposes: In the design of the supporting structures for the mountain tunnel with high water pressure, how to determine the water pressure value on lining is the key element of the design. For the Liantang Tunnel on the eastern highway in Shenzhen, the distribution of seepage field of Liantang tunnel is studied in theory. The Liantang Tunnel is located in the hilly area of southwest Shenzhen where is the influence area of the Shenzhen fault with developments of fault and joint fissure to break out the surrounding rock. As the tunnel is close to the Shenzhen Reservoir and is under the constant water level, the tunnel will be always affected by the high water pressure in the future if the under-passing scheme is adopted to the tunne.l Therefore, the study on the distribution of seepage fields of the Liantang Tunnel and surrounding rock has the instructive significance to both the structure design and drainage design.
Research conclusions: The verifying calculation is carried out separately to seepage field of the tunnel with finite differential geotechnical software package FLAC3D and Harr solution. By calculation comparison, the contour maps of the seepage field distribution made with the analytical solution, the definite differential geotechnical solution and Harr solution are gained respectively. By comparison, the correctness of the analytical solution to the seepage field distribution of deep buried tunnel is proved.
2010 Vol. 27 (9): 31-34 [Abstract] ( 2615 ) HTML (1 KB)  PDF  (1495 KB)  ( 208 )
35 Comparison and Choice of Protective Schemes for Building Around Under—passing Tunnel and Experimental Study on Grouting Scheme
SUN Guo—qing
Research purposes: With enlarging the development scale of urban underground space,a number of tunnels and underground works have to under—pass the existing buildings.In order to ensure the safety of the surface building, the reliable and effective measures must be taken to support the buildings.
Research conclusions: Through comparison and choice of the protective schemes for the building around the shallow buried,the scheme of grouting reinforcement was proposed for the protection of buildings for the first time in this paper.Through the study and test results,the foundation grouting and trace grouting could effectively control the building settlement.Adopting the building protection scheme,the grouting parameters,uplifting value,uplifting rate and SO on should be adjusted.
2010 Vol. 27 (9): 35-40 [Abstract] ( 2611 ) HTML (1 KB)  PDF  (495 KB)  ( 192 )
41 Research on Control of Geological Disaster for Excavation of Long Tunnel
GUO Wei—jun,CHEN Xue-jun,XIAO Gui—yuan
Research purposes: In recent years,the tunnel in China gradually trends to the long one with large section and deep burying.But now the tunnel development is restrained by the geological disasters.This paper mainly discusses the effective measure for control of geological disasters to reduce the impact of the complex geological conditions on tunnel construction.
Research conclusions: In today of the continuous development of tunnel,how to effectively control geological disasters in tunnel construction is the key element for ensuring the normal service of the tunnel.According to the influence factors on the tunnel construction,this paper discusses the measures for control of geological disasters in tunnel construction and points out the control of the geological disasters in tunnel construction is complex engineering and it needs the coordinations among the authorities concerned.The methods of TSP and high density resistivity are the effective ways to control the geological disasters.If the warning forecast is used,combining long—term forecast with short—term forecast,combining the control of the disaster on the upper part with the control of the disaster on lower part and combining the quantitative control with qualitative control are needed to guarantee the the forecast accuracy.In addition,it is necessary to strengthen the works of the blast control,informationalization construction and applications of new technologies and methods.
2010 Vol. 27 (9): 41-45 [Abstract] ( 2568 ) HTML (1 KB)  PDF  (519 KB)  ( 86 )
46 Study on the Correlation between Stress Release and Displacement Release DuringTunnel Excavation
GUO Rui,FANG Yong,HE Chuan
Research purposes: The tunnel excavation is not only a process of gradual displacement release,but also a process of gradual stress release.This paper studies the correlation between stress release and displacement with numerical simulation method.
Research conclusions: The two—dimensional analysis show that there is a certain correlation between the stratum movement and stress release.The displacements of different points and their varying laws of the stress release rate are of obvious differences.Choosing the displacement at one area to describe the displacement release around the tunnel is incomplete,while using the volume loss rate of tunnel excavation to describe the displacement release around the tunnel is more complete.The study results also show that the stratum volume lOSS rate and stress release rate are of a linear relationship basically.This relationship can be as the references to determining the reasonable stress release rate and volume loss rate(displacement release rate).
2010 Vol. 27 (9): 46-50 [Abstract] ( 3068 ) HTML (1 KB)  PDF  (416 KB)  ( 229 )
51 Experimental Study on Grouting Materials for Submarine Tunnel and Their Application
TU Peng,WANG Xing—Hua
Research purposes: In constuction of submarine tunnel,the grouting formula is important for reinforcement of the surrounding rock and water—-proof.The strength and durability of the grouting materials are the key elements for ensuring the long—term normal service of the submarine tunnel.The chemical and physical corrosions caused by the environment change of sea water and its own effect of the grouting materials are the main reasons for the corrosions to the grouting materials.The orthogonal experiments were conducted to the grouting materials comprised of portland cement,slag—portland cement and water glass to analyze the basic performance of the slurry comprised of Portland cement, slag—portland cement and water glass.With the orthogonal experiment method,the matching ratio of slurry Was optimized by taking the compress—resistant capacity as the major factor.
Research conclusions: From the comparison between the compress—resistant capacities of two specimens at the same age of two kinds of different grouting materials it was found out the corrosion—-resistant capacity of the slag—Portland cement Was much better than the Portland cement.The optimized grouting slurry Was used to reinforce the ground of the service tunnel of Jiaozhou Bay in Qingdao,obtaining a good reinforcement result.
2010 Vol. 27 (9): 51-54 [Abstract] ( 2580 ) HTML (1 KB)  PDF  (480 KB)  ( 166 )
55 Analysis of Mechanical Properties of Double—layered Lining of Shield Tunnel Under Water Pressure
YAN Qi—xiang,CHENG Xi,HE Chuan,ZHAO Shi—ke
Research purposes: According to the situation of some of shield tunnels with internal secondary lining in China,in order to prove the interaction mechanism between the secondary lining and segment lining,the corresponding analysis model was offered for the purposes of evaluating the function of the secondary lining correctly and providing the reference to the proper application of the secondary lining.
Research conclusions: The analysis model of sheafing and compressing resistance for double—layer lining was used to analyze the characteristics of the internal force properties of the structure under three representative kinds of conditions.The result proved that adding secondary lining might increase the moment and decrease the axial force of segment lining,and this effect Was especially obvious when water leakage occurred in the segment lining.Compared with segment lining,the secondary lining only plays an assistant role in the load bearing.With adding the secondary lining,the entire load—bearing of the double—layered lining Was not more reasonable.The ideal combined beating effect of double—layered liner only happened under conditions of specific load,ground parameters and structure parameters.The secondary lining could mainly bear the load when the segment lining completely failed and it played an assistant t role in load bearing.
2010 Vol. 27 (9): 55-59 [Abstract] ( 2539 ) HTML (1 KB)  PDF  (433 KB)  ( 360 )
60 Research on Fuzzy Evaluation of Lining Health of Railway Tunnel
LI Yun,WU Xiao—ping,LIAO Qun—li
Research purposes: Railway tunnel belongs to half concealed work because it is constructed in the underground rock—soil medium.It is difficult to determine the specific disease situation of the lining because the lining is concealed.According to the investigation of the phenomenon of tunnel lining disease,the model for fuzzy evaluation of The lining health of railway tunnel was established with improved fuzzy AHP to determine the weight and improving multi—fuzzy algorithm,for the purposes of finding out the major diseases of the lining and their impact levels.
Research conclusions: Application of this model can quantitatively evaluate the lining health of railway tunnel and objectively analyze the impact factors and levels of the most important desease.The application shows the model can be used for the similar works.
2010 Vol. 27 (9): 60-63 [Abstract] ( 2570 ) HTML (1 KB)  PDF  (368 KB)  ( 654 )
64 Research on Prediction of Foundation Pit Deformation and Safety Control Based on Neural Networks
ZHENG Zhi—bin,LIU Yong,LIU Ji—Yao,ZHAO Zhi—tao
Research purposes: The foundation pit deformation threats the safety of the foundation pit and surrounding buildings and structures.Application of neural networks in prediction of the foundation pit deformation in advance and giving alarm is a new way to control the risk.
Research conclusions: The neural networks can effectively predict the deformation and stability of the deep foundation pit in advance.and the stability based on which a judgement call be made on the stability of the deep excavation.The prediction value is much more closed to the measured value by using time series as an input layer.This shows the time series method can reflect the internal non—linear relation between the deformation of bracing structure of foundation pit and the time.In practice,the transfer of construction processing sequence can induce a sudden change of the measured value of the deformation.However,the big deviation of the predicted value from the mesaured value may result from ineffective training due to the small sample range of neural networks.
2010 Vol. 27 (9): 64-68 [Abstract] ( 2558 ) HTML (1 KB)  PDF  (453 KB)  ( 159 )
69 Research on Lightning Protection Effect of Lighting Arrester on Catenary
ZHANG Xue—yuan
Research purposes: The over—voltage of lighting seriously threats the reliability of power supply to the electrified railway.To install the lighting arrester on the catenary is one of ways to reduce lighting disaster,but now there is no theory on analysis of the lighting protection effect of lighting arrester on catenary.In this paper,based on the insulated strength of insulator of catenary and possibility distribution of lighting current,the analysis is made for the tripping situation caused by lighting when there is and there is no arrester on the catenary.
Research conclusions: The research shows as the external insulation level of the catenary of electrified railway is low,the insulator on support post is easy to flash over continuously under the over voltage of lighting.The attention should be paid to this when making analysis of the lighting—resistance capacity of the catenary and taking measures for lighting protection,otherwise,the big error will be brought out.The arrester is not suitable for the distributed lighting protection way in broad area,but it can obtain good effect for the lighting concentrated area with installation of it coneentratively.
2010 Vol. 27 (9): 69-73 [Abstract] ( 2766 ) HTML (1 KB)  PDF  (442 KB)  ( 358 )
74 Analysis of Monitoring Deep Foundation Pit for Xunlimen Station of Wuhan Metro
DING Lie—yun,LI Wei—ming,WU Xian—guo,ZHOU Cheng,LUO Han—bin
Research purposes: The open-cut method is often used for construction of metro station and with it the metro station construction affects the surrounding environment because the surrounding environment iS complex and there are many buildings and structures.For construction of Xunlimen Station of Line 2 of Wuhan metro,the distance between the excavation edge of 22 m deep foundation pit and the bridge pier light railway was only 1.25 m.The bridge piers should meet the operation requirement of light rail traffic,and they were sensitive to the differential settlements,So it waft necessary to monitor and analyze the construction in this key and complex section for offering the solution.
Research conclusions: During construction of Xunlimen Station,the monitored data on settlement showed the construction of Xunlimen Station may much affect the operation of the light railway.Through analysis of the relative position of the deep foundation pit to the bridge pier of light rail and the distribution of the soil layer,the construction scheme was optimized and the additional monitoring points are added.With these measures,the settlements of the bridge pier trended to stable and the absolute settlement values and the differential settlement values were effectively controlled in the next construction.
2010 Vol. 27 (9): 74-77 [Abstract] ( 3052 ) HTML (1 KB)  PDF  (472 KB)  ( 316 )
78 Analysis of Influence Mode of Shallow Gas on Construction of Hangzhou Metro
GUO Ai—guo,SHEN Lin—chong,ZHANG Jin—rong,QIN Jian—she,Huang Xian—feng,WANG Yong
Research purposes: The shallow gas existed in the soil stratum from depth of 15m to 30m under some section of Line 1 of Hangzhou metro might have influences on the constructions of the metro stations and shield tunnels.Based on consideration to the characteristics of shaHow gas and gassy soil,the influence mode of shallow gas on the construction of underground structures was analyzed and the corresponding measures were presented to prevent the disasters during the construction.
Research conclusions: During the construction,the uncontrolled release of shallow gas would seriously disturb the soil layer.The distablization of the trench wall or hole wall and the upheaving of foundation ditch might happen because of the high gas pressure.Moreover.there was the hidden peril of safety accident when shielding Was conducted across the gas soil layer.So,the measures like controlled release of the shallow gas had to be taken during the construction to prevent the disasters caused by the shallow gas.
2010 Vol. 27 (9): 78-81 [Abstract] ( 2621 ) HTML (1 KB)  PDF  (416 KB)  ( 189 )
82 Construction Method and Control Measure for Connecting Passage inWater-enriched Sand Bed
WANG Hui, ZHU Wei-bin, LI Da-yong
Research purposes: Through analyses and comparisons of the construction characteristics and dangers of four construction methods for the connecting passage in water-enriched sand bed, the construction method and control measures related to the design and construction are offered for construction of the underground connecting passage in water-enriched sand bed to guarantee the construction quality and safety.
Research conclusions: For construction of the connecting passage in water-enriched sand bed, the artificial ground freezing method is a prior construction method featured with high reliability and no pollution of groundwater and ground. Moreover, in order to ensure the successful and safe application of the artificial ground freezing method, the duct piece at the tunnel portal of the connecting passage should be designed specially. In order to reduce the impact of expansive soil on the tunnel, the internal support should be installed in the tunnel to effectively control the tunnel deformation. The special measures should be taken in the process of freezing, such as installation of safe door to prevent the appearance of accident. In addition, to install pressure-releasing holes and use heat -cycling and trace grouting methods are effective.
2010 Vol. 27 (9): 82-87 [Abstract] ( 2587 ) HTML (1 KB)  PDF  (447 KB)  ( 440 )
88 How to Effectively Judge Cost Price in Bidding for Highway Engineering
LI qian,WU Xiao—wei,TIAN jun
Research purposes: It is very common to use the lowest price winning bid method in the bidding process of highway engineering,and this method is also the preferred in the world at present.But with this method it is difficult to judge whether the lowest bidding price is below the the project cost price or not.To solve this problem,the reasonable calculation method is offered,and this calculation method can judge whether the bidding price is below the project cost price or not to prevent the problems related to the construction quality.
Research conclusions: Relying on the financial indexes of the bidding enterprise and determination the weight with entropy weight decision—making method.and taking fuzzy evaluation model for project risk as a rule,a complete set of models of integrating theory with practice are established to solve the problems.This method wa$examined in the real Construction practice.The result showed this method could solve the problems in the previous bidding and with this method not only could the the bidding cost of the highway construction be cut,but also it could make the bidding more fair and scientific.
2010 Vol. 27 (9): 88-91 [Abstract] ( 2557 ) HTML (1 KB)  PDF  (446 KB)  ( 140 )
92 Principles and Method for Choosing Transportation Equity Indexes
SHI Jing, ZHOU Nian
Research purposes: The study was done on the principle and method for choosing transportation equity indexes tomake establishmentof the transportation equity indexesmore scientific and purposive.
Research conclusions: The transportation equity indexes are the main elements in evaluation of the transportation equity, butchoice ofevaluation indexes are ofblindness and randomness atpresen.t By studying, the definition of the transportation equity is offered on the base of capacity -supply equity. Meanwhile, the eight basic principles forchoosing the transportation equity indexes are presented, namely, relativity, clear definition, consistency, correct incentive, flexibility, objectivity, practicality and comparability. The properworking process and requested information for choosing the indexes are also given ou.t From the study on chossing the indexeswithWilson entropy mode,l it is concluded by following these principles, requested information and working process, the selected indexes can be examined, and the new reasonable indexes can be selected forevaluation of the transportation equity evaluation.
2010 Vol. 27 (9): 92-97 [Abstract] ( 2745 ) HTML (1 KB)  PDF  (917 KB)  ( 224 )
98 Thoughts on Design Management of Railway Construction Project by Proprietor
LIU Wei
Research purposes: In the process of railway construction,management is the key ele4ment of the project management by proprietor.Whether the construction safety,construction quality,construction schedule,environment protection and technological innovation can be ensured or not mostly depends on the quality of engineering design.Taking construction of Yichang—Wanzhou Railway as an example,this paper analyzes the problems in design WoI'ks and causes for them from the perspective of proprietorg design management and puts forward recommendations.
Research conclusions:(1)The proprietor must play the core and leading role in the design management.(2)The design unit should bear all the responsibility for the design quality.(3)The major technical programs should be accredited by professional team.(4)For the total price contract,more attention should be paid to ensuring the construction security and quality in the engineering design and for the unit price contract,attention should be paid to examining the design.(5)It is necessary to study more appropriate field coordinated system of design corporation.(6)Implementation of the”Design Supervision”system is the inevitable trend of social and economic development.
2010 Vol. 27 (9): 98-101 [Abstract] ( 2545 ) HTML (1 KB)  PDF  (403 KB)  ( 287 )