2008 Vol. 25, No. 9
Published: 2008-09-15

 
1 Slope Stability Analysis of Sand Embankment for Expressway Engineering
JIANG Xin,LING Jian-ming,TAN Wei,WANG Xin-tian
Research purposes: The sand embankment has been growing concern in high class highway engineering construction over plain area to solve the difficult problem of high quality subgrade filling absence. The slope stability is one of the key factors in sand embankment design and construction. Based on Shear Strength Reduction Method (SSRM ),a sensibility analysis of embankment cross-section geometry size and filling material properties for sand embankment slope stability has been carried out.Measures to increase sand embankment slope stability were put forward to provide reference for expressway engineering construction.
Research conclusions: The Shear Strength Reduction Method(SSRM)can be conducted to analyse the sand embankment slope stability reasonably.The shear strength parameters(mainly cohesive c ) matching relations between sand filling and clay soil layer will effect the slip surface behaviors directly. Some constructive advice, such as decreasing the side slope angle, enhance sand filling-clay soil layer interface construction treatment and embankment compaction, was drawn to increase the sand embankment slope stability in practice.
2008 Vol. 25 (9): 1-6 [Abstract] ( 2590 ) HTML (1 KB)  PDF  (470 KB)  ( 495 )
7 Analyses of FEM Based on the Visco-Elasto-Plasticity of Reinforced Cohesion Soil Retaining Wall by Geogrids
XIAO Cheng-zhi,LIU Bo,SUN Jian-cheng,LUAN Mao-tian
Research purposes:5-element Nishihara 's rheological model of cohesion soil and creep model of geosynthetics are used to study long term behaviors of reinforced cohesion soil retaining wall. Additionally, the interaction effects of reinforcement and fills, panel and fill and panel and panel are rationally considered. The layer- by-layer filling process of backfills of retaining wall is also simulated. Nonlinear computations based on 2-D FEM are numerically implemented by hybrid algorithm in which the incremental scheme is incorporated. Furthermore, Denver test wall of cohesion soil has been simulated by proposed method here.
Research conclusions: The simulated results agreed with the measured results well. Vertical displacement for top surface and lateral displacement for panel are affected by rheology of reinforced structure. Stresses of reinforcement increased with time at the beginning, during a specified time the stresses in it decreased and the reinforcement showed the behavior of relaxation.
2008 Vol. 25 (9): 7-12 [Abstract] ( 2575 ) HTML (1 KB)  PDF  (512 KB)  ( 183 )
13 Research on the Red Clay Deformation Characteristics of Wuhan-Guangzhou Passenger Dedicated Line
FANG Wei, YANG Guo-lin,YU Dun-meng
Research purposes: Passenger dedicated line has strict deformation control after construction with very small amount. Along Wuhan-Guangzhou passenger dedicated line, extremely large area of red clay exists which covers more than 100km, from Wuhan to Shaoguan. And the harmful effects which red clay might bring to foundation deformation and slope stability. In order to avoid these results, red clay deformation characteristics were studied in 3 aspects, such as stress-strain relation,consolidation deformation and swell-shrinking deformation. Finally, the deformation control methods and engineering properties improvement were put forward.
Research conclusions: Take the entity project of Wuhan-Guangzhou passenger dedicated line for example,a lot of indoor tests, such as triaxial tests, consolidation tests, expansion tests and contraction tests were carried out. The characteristics of red clay including stress-strain relationship, consolidation deformation behavior, and expansive- contractive deformation behavior were studied. The following characteristics of red clay were obtained: behavior of ultra- consolidation characteristic, behavior of consolidation but without compassion, consolidation and anti-profile characteristic, medium compression, relative less expansive deformation and more contractive deformation. In red clay areas, we could improve the particle size distribution of red clay to reduce its deformation; use heavy load to constrain its expansion. During construction, CFG piles could be used to strengthen the foundation and pile-plank wall,as well as bolts could be adopted to strengthen slopes. These are of great significance to the construction of entity project of passenger dedicated line and provide references for similar projects
2008 Vol. 25 (9): 13-20 [Abstract] ( 2934 ) HTML (1 KB)  PDF  (556 KB)  ( 435 )
21 Research on the Detection Method of CP Ⅲ Points Stability in Fine Adjustment of Ballastless Track
XU Xiao-zuo, LIU Cheng-long,YANG You-tao
Research purposes: Fine adjustment of ballastless back has become one of the key technologies in control survey for ballastless track construction. In fine adjustment of ballastless track, the stability of CP Ⅲ points which are involved in resection should be detected before three-dimensional strict adjustment of the resection station, and then remove the unstable CP Ⅲ points. How to detect the stability of CP Ⅲ points and analyze the stability judgement method of CPⅢpoints as well as its feasibility, and also put forward some suitable judgement standards, so as to make sure the high precision of ballastless track laying.
Research conclusions: The paper proposes the method about the stability detection of Control Points m,which uses the information provided after the early CP Ⅲ plane and elevation control network adjustment and the measured distance and height difference of every two CP Ⅲ points calculated by measured data of free station in fine adjustment of ballastless track,and then compares with known distance and height difference. Theoretical analysis and testing results both validate that the method is correct and can detect the stability of CP Ⅲ points in plane and elevation. So the method proposed in the paper can be widely used in the project.
2008 Vol. 25 (9): 21-25 [Abstract] ( 2689 ) HTML (1 KB)  PDF  (424 KB)  ( 226 )
26 Research on the Growth of Fatigue Crack of Rail Steel under Moment of Flexure Condition
HU Jia-jie, WANG Wen-jian,ZHONG Wen,LIU Qi-yue
Research purposes: There have various combined loads on vehicles in the moving process. Because of variety factors,such as ovality of wheel,attack of vehicle at curve rail,rail slot,turnoff,fatigue crack's initiation and growth~ influenced by the moment of flexure which was induce by the normal force existing between wheel and rail in the course of vehicles running. The growth behavior of fatigue carck of U71 Mn and PD3 rail steel under moment of flexure condition was investigated using NENE-2 fretting test machine. Based on the results, measures are proposed to avoid fatigue damage.
Research results: The results indicate that the crack initiate in the stress focus position , and the impact of main shear stress is very important. The growth of crack under static load is different from dynamic load condition. Under the same loading rate, the crack of PD3 rail is easier to initiate and grow than U71Mn's. To prevent and mitigate fatigue damage, suitable materials must be chosen based on the type of the rail line and work environment. PD3 rail steel would be used at heavy haul railway. U71 Mn rail steel would be used at high-speed railway.
2008 Vol. 25 (9): 26-29 [Abstract] ( 2522 ) HTML (1 KB)  PDF  (362 KB)  ( 142 )
30 Experimental Research on the 68 kg/m Rails for Heavy Haul Railway
CHEN Zhao-yang, ZHANG Yin-hua, ZHOU Qing-yue, LIU Feng-shou
Research purposes: Now 75 kg/m rails are applied on heavy haul railway lines in domestic,but AREMA 136RE (68 kg/m) rails are applied widely and maturely on heavy haul railway lines in countries which have developed heavy haul railway network. It is necessary to investigate properties of 68 kg/m(136RE) rails in order to provide more type of rails for heavy haul railway in domestic.
Research conclusions: The ultimate tensile strength at room temperature of hot-rolled rails is 1 080 MPa, and hardness of tread is up to 300 HB. The H and O contents of finished rails are 0. 5 x 10-4% and 12. 3 x 10-4% respectively. The microstructure of tread and gauge comer is consist of pearlite and a little ferrite. The largest residual tensile stress in rails bottom is 200. 2MPa. The fracture toughness ( K1C) at -20℃is 32. 5 MPa?m1/2. When the stress intensity factor (?K) is 10 MPa?m1/2}and 13. 5 MPa?m1/2,the fatigue crack growth rate(da/dN ) is respectively 9. 55 m/Gc and 31.98 m/Gc. All results show that the 68kg/m hot-rolled rails satisfy requirements of”tentative technical specifications of 68kg/m rails",and could be laid on heavy haul railway line.
2008 Vol. 25 (9): 30-34 [Abstract] ( 2555 ) HTML (1 KB)  PDF  (432 KB)  ( 184 )
35 Research on the Force Test of Rail Welded Joints
LUO Wen-jun,LIAN Song-liang
Research purposes : By analyzing the effect on impact force between wheel and rail by track irregularity , technical evidences on limit of irregularity on rail welded joints are provided.
Research conclusions: By the measure experiment on the spot to compare of impact force between wheel and rail and track structure vibrational acceleration, the results show that effect on impact force between wheel and rail is distinct by irregularity on rail welded joints. Especially when wavelength of the irregularity on track surface at the size is inconsistent , the effects on the P1and P2 are inconsistent as well as. At the same time,it shows that P2 can be reduced distinctly by the improvement of irregularity on rail welded joints,so that stress of track structure can be reduced.
2008 Vol. 25 (9): 35-38 [Abstract] ( 2557 ) HTML (1 KB)  PDF  (378 KB)  ( 112 )
39 Design of Protective Removal Scheme of 5 Spans Arch Bridge
HU Yong
Research purposes: Based on the theoretical calculation and analyses of the bridge, the researches are done on the protective removal technique and its control system for the arch bridge and the analysis of the difficult points in removing is made for the purpose of presenting a safe, high efficient and non-polluted way for removing arch bridge.
Research results : The”High Trestle Bridge Gantry Crane Support Under Arch Method" is a safe,high efficient and non -polluted way for protective removing arch bridge in complicated construction environment requiring navigation under the span, high safety and short construction period. The control system for synchronous balance,multiple support and level restraint has been developed to guarantee the stability of the structure and pier, which forms a set of new technique for protective removing arch bridge.
2008 Vol. 25 (9): 39-43 [Abstract] ( 2554 ) HTML (1 KB)  PDF  (508 KB)  ( 115 )
44 The Current Development Situation and Trend of Monitoring Technology for Bridge Health
WEI Xin-liang, WANG Zhen-hong
Research purposes: Through making summary on the evaluation methods for the different status of model modification, fingerprint and dynamics involved in the monitoring technology for bridge health, the comprehensive analysis of the current development situation of monitoring technology for bridge health is made and its development trend is predicted.
Research results: The research on the bridge health monitoring and evaluation system is at the beginning stage and it has long way to go to put the system into practice. Nowadays only the response of low frequency can be measured precisely and only can reflect the entire status of the structure. However, even such response can be reflected in the entire status, but it is easily disturbed by the noise, error and unstable factors because the measured value is too small. The development trend of monitoring technology for bridge health is as follows; The first is to reduce the noise and unstable factors and the second is to enhance the sensitivity of diagnostic method of bridge damage to realize the quantization of the bridge damage through optimizing the technology.
2008 Vol. 25 (9): 44-47 [Abstract] ( 2567 ) HTML (1 KB)  PDF  (370 KB)  ( 188 )
48 Gray Comprehensive Assessment For Health State of Reinforced Concrete Girder Bridge
LI Guo-cheng,CHENG Tao
Research purposes: In terms of the systematic characteristics of the reinforced concrete girder bridge, a method of assessing the health state of Reinforced Concrete Girder Bridge is studied and it is meaningful to get hold of the safety status of the bridge.
Research Conclusions: Based upon Gray Theory and Analytic Hierarchy Process, a bridge is divided into three subsystems, namely superstructure, load-transmitted structure and substructure. According to the results measured from the bridge and the specialist's experience, quantitative values of indicating the health state for components can be conducted. The health state of each subsystem is assessed in accordance with that of the components. On the grounds of these, the health state of bridge structure can be produced.
2008 Vol. 25 (9): 48-51 [Abstract] ( 2606 ) HTML (1 KB)  PDF  (317 KB)  ( 113 )
52 Analyses of Erection Technology for Steel Truss Arch of Wanzhou Yangtze River Bridge
LIU Cheng-Bang
Research purposes : Large span steel truss arch bridge has become more popular for recent years because of its new structure, smooth streamline form, good looking and modern characteristics, but it requires high technical contents with lots of difficulties in construction, especially the choices of midspan closure scheme and closure measures are essential to the successful construction of it, so the discussion is made on it in this paper.
Research conclusions: The successful construction of Wanzhou Yangtze River Bridge shows:(1)The closure scheme of no stress on closure rod with adjusting height differences between the front support point and the rear support point and making one steel truss displacement to eliminate the influence of rotary angle of cantiever is feasible.(2)The calculation and analysis of position change of closure point is the same important as the fine adjustment in the course of closure.(3)The installation order should be optimized in accordance with the actual conditions of each bridge. (4) Whether the technical measure of installing binder is taken or not will rely on the calculation and analysis made after the closure. ( 5 ) Lowering the height of temporary support to master piler is one of important measures for safety.
2008 Vol. 25 (9): 52-57 [Abstract] ( 2568 ) HTML (1 KB)  PDF  (501 KB)  ( 525 )
58 Numerical Analysis of the Influence of Tunneling on Ground Movement and Adjacent Frame Structure
LI Hao,WANG Tao,XU Ri-qing
Research purposes: Current practice for assessment of effects on adjacent structures due to tunneling usually starts with a procedure in which ground movement is imposed on a structural model of the building. The process ignores the effects of the building 's weight and stiffness. Numerical modeling of damage to structure due to tunneling is established. The combined effect of tunneling and structures on ground movement is analyzed, and the deformation and endogenous force of framE structure and piles influenced by tunneling are studied. Some reference opinions are provided for the work of design and construction.
Research conclusions: The results show that the settlement and its area of the ground increase significantly due to the weight of structure, but the lateral movement of the ground reduces significantly due to the stiffness of structure; Vertical displacement of the structure is significantly influenced by tunneling, but the lateral deformation is not marked. The bending moment of middle beams change little, but the bending moment of side beams increase marked. The axial force of middle pillars decreases, but the axial force of side pillars increases. In practice, the side beams and side pillars should be measured.
2008 Vol. 25 (9): 58-61 [Abstract] ( 2621 ) HTML (1 KB)  PDF  (440 KB)  ( 278 )
62 The Scheme Design for Resistance Discharge Fume in Extra-long Subsea Tunnel of City Roadway
SU Li-yong
Research purposes: The resistance and discharge fume is the major and difficult part in the tunnel design. The rational design for the resistance and discharge fume system is in connecting with the tunnel design success-fail and the people's lives and property. Take the lengthy submarine tunnel for example, this paper studies how to choose rational design for the resistance and discharge fume system and provides referrenc for other tunnel designs.
Research conclusions: According to the tunnel's road net, resistance and recovery facilities' layout, traffic conation, ventilation system,this paper analyzes the fire probability in the different regions and the accepted extent of loss and absorbs the concept of performance fire control design. The transverse ventilation was adopted in the important fire resistance position and the comprehensive discharge fume scheme on the base of longitudinal ventilation in the general position. The resistance and discharge fume theory of civil architecture was taken in the tunnel's resistance and discharge fume design, and the tunnel's resistance and discharge fume theory was perfected. By analyzing the service tunnel, air flow and personal dispersal, the service tunnel's positive pressure design was cancelled to make the tunnel's resistance and discharge fume scheme on economic technique more proper and feasible.
2008 Vol. 25 (9): 62-65 [Abstract] ( 2589 ) HTML (1 KB)  PDF  (339 KB)  ( 174 )
66 Construction Technology of the High Pressure and Enriched Water Fault F1 in Bieyancao Tunnel on Yichang-Wanzhou Railway
WANG Shu-guo,ZHANG Min-qing,HUANG Hong-jian,CHEN Wei-yuan,YIN Huai-lian
Research purposes: Bieyancao tunnel is one of 8 level Ⅰ risky tunnels with the fault F1 grown in the tunnel DK 404+101~+550 and fault is on the interface of dissolvable terrain and undissolvable terrain. The fault is formed by calcified cementation of dissolvable limestone and dolomite. The measurement shows the water pressure is 0. 6~1. 8 MPa and the water quantity is 10~160 m3 per hour in the fault. The description is made on how to decide grouting parameters and support scheme in advance through conducting the survey in advance to the high pressure and enriched water Fault Fl based on the water pressure and the water quantity in the single hole.
Research conclusions:To the high pressure and enriched water fault F1,the construction method of geological forecast in advance, grouting consolidation, pipe-shed support and strengthening the structure is feasible. To the main fault, the grouting purdah thickness is 8 meters besides the tunnel contour line and to the fault influence zone, if the water pressure exceeds 1. 5 MPa and the water quantity exceeds 40 m3 per hour, the grouting purdah thickness is 8 meters besides the tunnel contour line. To the other cases, it is necessary to optimize the grouting purdah thickness and construction program,reasonably equip the construction machinery and strengthen construction organization and management for enhancing the production grouting capacity to curtain grouting per cycle/32 days and the process of boring-grouting-excavation" 22 meters per month.
2008 Vol. 25 (9): 66-70 [Abstract] ( 2566 ) HTML (1 KB)  PDF  (438 KB)  ( 211 )
71 Environmental Harm and Countermeasures for Water Outburst in Mountain Tunnel Construction
GAN Kun-rong,JIANG SU,Li Yuan-hai
Research purposes: On basis of the environmental harm of water outburst in the mountain tunnel construction, this paper analyzed the harm reasons from design and construction technique, studied the construction technique for preventing and harnessing and explored a construction thinking of mountain tunnel for controlling soil and water losses.
Research conclusions: The research obtained that water outburst is a main engineering factor caused by soil and water losses. From current design and construction technique, this paper analyses key links and the difficulties in tunnel construction. As a result, this paper holds that advance geological exploring and hydrologic monitoring are basis of the making plan of water outburst treatment. A pre-grouting comprehensive measure that reducing water pressure upon lining is put forward,the drainage mess and drainage time length are controlled with an allowed value of water inflow and at the given period. These research results have been applied to an engineering practice of water outburst treatment in mountain tunnel of Karst zone, and it has obtained good results.
2008 Vol. 25 (9): 71-76 [Abstract] ( 2496 ) HTML (1 KB)  PDF  (519 KB)  ( 281 )
77 The Geological Characters and Construction Countermeasures Corresponding on Tunnel through Shale ( T3sn)in Dali-Lijiang Railway
YANG Ying
Research purposes: There are some specifical engineering-geology conditions on tunnel through shale( T3sn) in Dali-Lijiang railway. Due to some peculiar characters of cracked with tectonics and intenerated and inflated with water for shale(T3sn),a great deal of difficulties are brought on construction of tunnel. It is necessary to investigate construction countermeasures corresponding shale ( T3sn).
Research conclusions: Based on the characters of shale(T3sn),a lot of construction countermeasures are adopted, including adjustment tunnel profile, accretion premeditate distortion, three-sidestep-diging into, setting steel structure, adjustment length of anchor-pole, strengthening inspection and so on. As a result of above measures, initial stage shoring distortion of tunnel is restrained effectively.
2008 Vol. 25 (9): 77-79 [Abstract] ( 2512 ) HTML (1 KB)  PDF  (342 KB)  ( 122 )
80 Research on the Deformation Law of Deep Excavation Supporting Structure in Metro Interchange Station by FLAC Simulation
REN Jianxi,GAO Tao
Research purposes:In the engineering background of deep excavation of Datunlu metro transfer station of Beijing subway Olympic branch line,the combination of in-situ monitoring with FLAC simulation is used as the methodology, deformation law of deep excavation supporting structure of city subway station is studied. And it provided a basis for supporting structure optimum design of Beijing metro excavation projects and information construction.
Research conclusions: When open excavation construction is carried out in deep excavation of city subway transfer station under complex environment, in-situ monitoring is a useful measure for safety guarantee to information construction. For subway station with complicated shape, compound maintenance forms that it includes retaining pile, steel support and anchor cable should be adopted to be as supporting structure of deep excavation. Stratified excavation method of earthwork and applying prestress to steel support are the important measure of reducing spatial effect and guarantee safe construction. FLAC numerical simulation is important means for the study of deep excavation deformation law.
2008 Vol. 25 (9): 80-83 [Abstract] ( 2541 ) HTML (1 KB)  PDF  (404 KB)  ( 145 )
84 Research on the Light Pollution of Glass Curtain Wall of Railway Station
ZHANG Yu-ming
Research purposes :Although light pollution still has not been placed into the scope of the environmental pollution protection, but its harm is obvious and becomes more serious, so people should pay more attention to protecting the light pollution in the daily life and create a fine and comfortable life environment to lower the light pollution. In this paper, the analysis of the causes for the light pollution and the light of railway station are made for the purpose of finding out the effective way and measures for overcoming the light pollution.
Research conclusions: Through making analysis of the cause for light pollution of the glass curtain wall of railway station to the surrounding buildings, the discussion is made on light pollution harm to human body and the proposal is made that the light reflection pollution from the glass curtain wall of railway station can be eliminated or reduced by adopting special glass, non-curved-face curtain wall, glass lamina and special structure of glass curtain wall to make railway station becoming more comfortable for using.
2008 Vol. 25 (9): 84-87 [Abstract] ( 2528 ) HTML (1 KB)  PDF  (361 KB)  ( 272 )
88 Discussion on the PPP Financing Pattern in Railway Construction of China
LIU Dong-mei, HAN Tong-yin
Research purposes: The railway financing's primary problem is how to broaden of the capital-raising and investment and financing channels .Realizing the leaping development of Railway Transportation,we should explore the feasible financing method to promote the development of diversified sources of investment.
Research conclusions: By discussing the concept, characteristics, operation procedure and feasibility analysis of PPP financing pattern, this paper puts forward the necessity of selecting PPP financing pattern in railway construction, also points out PPP financing pattern involved in railway construction is more easily to activate the private capital and foreign capital, and it is propitious to introduce the advanced technology and management experience. It provides reference for solving the financing problems in railway construction project of China.
2008 Vol. 25 (9): 88-90 [Abstract] ( 2570 ) HTML (1 KB)  PDF  (304 KB)  ( 251 )
91 Research on the Risk Analysis of Piling Exchange for Metro Line 1 in Shenzhen
LI Dong-mei
Research purposes: In order to resolve the difficulties in using”Interim Rules of Risk Evaluating and Management on Railway Tunnels" and”Guideline of Risk Management for Construction of Subway and Underground Works",this paper finds out a risk analysis method with simple used and maneuverability.
Research conclusions :(1)The result indicates that the risks of working drawing design, piling cut and pre-jack are greater than the ones of construction conditions and others.(2)The method of De1Phi uniting AHP could get the half-quantity result, which could meet the requests of”Interim Rules of Risk Evaluating and Management on Railway Tunnels" and "Guideline of Risk Management for Construction of Subway and Underground Works".( 3 ) 1'he method of De1Phi uniting AHP holds true for risk evaluating of simple works and risk identity of complex projects.
2008 Vol. 25 (9): 91-94 [Abstract] ( 2535 ) HTML (1 KB)  PDF  (349 KB)  ( 184 )
95 Thoughts on Introducing the Board System by the Enterprise Directly Under the Central Authority
TAN Feng-hua
Research purposes:Through making analyses of the formation,characteristics, existential conditions and environment, advantages and disadvantages of the independent board system, the issues for attention in introducing the system and its resolutions are put forward.
Research conclusions: Introducing board system is a very important innovative work for the enterprise directly under central authority, but the board system is not perfect. The primary goal and basic task of establishing the board system are to overcome the problem of”control of inner employees",but establishing the board system needs certain conditions and environment. The enterprise directly under central authority should have special purpose and not give a show when establishing the board system. In the cause of establishing the board system , the more attention should be paid to the natural defects and disadvantages of the independent board system and relative adjustments should be made in accordance with the real conditions.
2008 Vol. 25 (9): 95-99 [Abstract] ( 2475 ) HTML (1 KB)  PDF  (417 KB)  ( 73 )
100 The Effect of Construction Project Risk Management in the General Control Mode
QI Xiao-ming
Research purposes: Construction project risk management is an effective measure for controlling and keeping the construction project away to improve the project investment benefits, but the effect of construction project risk management can not been given full scope in the course of the construction because of the defaults of construction project management mode adopted popularly in China, resulting in construction project risk loss, so it is necessary to seek the way for giving full scope to the risk management for the purpose of enhancing the construction project capacity against the risk.
Research Conclusions: The full scope can be given to the construction project risk management by introducing the general control mode into the existing construction project risk management mode. In this paper, the analyses of the adaptability of the construction project risk management in general control mode and its effects are made
2008 Vol. 25 (9): 100-103 [Abstract] ( 2507 ) HTML (1 KB)  PDF  (365 KB)  ( 274 )
104 Discussion on the Materials Regional Management Mode for Construction Enterprise
YU Rui
Research purposes:The materials cost of construction enterprise is up to 60% of its total cost, so the materials management level is very important to control the materials cost and total cost of the enterprise. In this paper, the discussions are made on the new materials management mode for the purposes of effective controlling the materials in entire process from purchase to usage and overcoming the deep problems in existing materials management for construction enterprise.
Research Conclusions : Construction enterprise should change the materials management mode from decentralization into regional centralization by integrating the human resources, assets resources and information resources and establishing centralized management platform and reasonable regional network. In this way, construction enterprise can realize the integrations of standard,information and purchase and effectively control the materials to reduce the materials cost and enhance the benefits.
2008 Vol. 25 (9): 104-107 [Abstract] ( 2600 ) HTML (1 KB)  PDF  (351 KB)  ( 238 )