Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
2008 Vol. 25, No. 7
Published: 2008-07-15

 
1 Analyses of Dynamic Response of the Loess Slope Under Construction Vibrations
GONG Cheng-ming, LIU Zheng-ping, YANG Dan
Research purposes: The tests of the dynamic responses of the loess slope excited by pile hammer vibrations are done and the analyses of the difference of dynamic response between level ground and side slope are made for the purpose of finding out the external dynamic factors for collapse of side slope in construction.
Research conclusions: The loess slope has strong dynamic responses to the construction vibrations, and especially, the dynamic responses of the crest part of the slope are much stronger than that of the free field (horizontal surface). The topographic amplification effects should be one of the potential factors for the collapse of loess slope in the foundation reinforcement process. Therefore,to ensure the stability of the slope and construction safety, it is very important to take temporaiy reinforcement measure for loess slope.
2008 Vol. 25 (7): 1-4 [Abstract] ( 2706 ) HTML (1 KB)  PDF  (427 KB)  ( 118 )
5 Case - based Reasoning Approach to Stability Evaluation of Structured Rock Slope
ZHAO Wen, HE Yu-long
Research purposes : The stability of rock slope is an inevitable problem in construction of mountain expressway. The influence of rock mass structure on stability of rock slope is seldom taken into account in current design.
Research conclusions : The rock slopes in base case are re-evaluated and the accuracy ratio of back evaluation is above 85%. The stabilities of 12 structured rock slopes in Changde - Zhangjiajie expressway are evaluated by the model and the results are in good agreement with the actual conditions, which shows that the model of stability evaluation of structured rock slope based on case - based reasoning method in this paper is effective. The stability evaluating method for rock slopes can be a reference for design in rock engineering.
 
2008 Vol. 25 (7): 5-9 [Abstract] ( 2501 ) HTML (1 KB)  PDF  (417 KB)  ( 93 )
10 Research on the Degree of Side Slope of Mountainous Highway Based on Ecological Environment
ZHAO Wen-yan
Research purposes : The degree of side slope of mountainous highway should be chosen with consideration of the local ecological environment for the purpose of reducing the influence of highway construction on the local ecological environment.
Research conclusions : How to choose slope degree becomes a hot study issues at present. With considerations of many factors of deciding the slope degree, slope stability, construction cost and ecological environment, the slope evaluation index and model for the slope degree are presented by adopting subject and object evaluation method. The engineering practice indicates the slope degree decided with this method is reasonable, which can reduce the influence on environment effectively.
2008 Vol. 25 (7): 10-13 [Abstract] ( 2523 ) HTML (1 KB)  PDF  (390 KB)  ( 162 )
14 Research and Development of Computer Aided Design for New Railway Line
WANG Yu-ze
Research purposes : Chinese railway construction develops rapidly with large scale and high standard, so it is necessary to research and develop the CAD software for route selection based on 3D data, taking vector landform diagram as reference for the purpose of satisfying the requirements of construction design. In this way,we can achieve the aim of enhancing production efficiency and improving design quality.
Research conclusions : Based on the analyses of survey and design flows of new railway lines at different grades, CAD for railway line are presented and researches are done on the key technologies of establishing digital ground model, interaction of the graph with the data, the interactions of track plane section, track longitudinal section and track lateral section, interaction design of railway II line, track scheme management and real 3D visuals of design. The application results show the CAD based on these technologies can be generalized and applied in the construction design.
 
2008 Vol. 25 (7): 14-17 [Abstract] ( 2548 ) HTML (1 KB)  PDF  (436 KB)  ( 187 )
18 Research on the Method to Define the Classification of Line Accessibility for Railway Network
YANG Mian,WEI Qing-chao
Research purposes : Reasonably determining the role and consequence of lines in the regional railway network has great significance to the reasonable railway network plan and deployment of railway technical standard, however, the quantitative methods are still absent now. In this paper, the line accessibility classification model is established for classifying the consequences of the lines in the network, which provide a quantitative mean to determine the role and consequence of lines for railway network plan and design.
Research conclusions; By calculating the classification of line accessibility for railway network in Northeast area, the practicability of the method is validated and a great correlation exists between the line accessibility classification and the railway classification. The model built in this paper could be adopted in the fields of network planning,network analysis and evaluation.
2008 Vol. 25 (7): 18-21 [Abstract] ( 2542 ) HTML (1 KB)  PDF  (427 KB)  ( 98 )
22 Researches on the Key Construction Equipments and Technologies for CRTS II Slab Ballastless Track for High - speed Railway
QING San-hui, CHEN Shu, HU Jian
Research purposes : Aiming at the real situation that there is no experience and special equipments for construction of high - speed slab ballastles railway track, the researches are done on the key technologies and equipments for construction of high 一 speed CRTS II slab ballastles railway track for the purpose of providing technical and machinery support to construction of intercity railway between Beijing and Tianjin and reference to similar work.
Research conclusions : The prices of China - made special gantry crane for laying slab,twi - direction slab carrier,fine adjustment system for slab,cement-asphalt-mortar carrier and rail layer for 500m long rail are lower than those from foreign countries by over one third. The applications of these equipments in construction of intercity railway between Beijing and Tianjin show China can manufacture the special equipment for construction of CRTS II slab ballastles railway track and a set of construction process and technique have been formed,which mark China - made special equipments for CRTS II slab ballastles railway track have arrived at the advanced level of the world,and promoted the innovation and development of Chinese equipments for construction of slab ballastless track.
2008 Vol. 25 (7): 22-27 [Abstract] ( 2586 ) HTML (1 KB)  PDF  (589 KB)  ( 374 )
28 Overall Comments on Study and Application of Ballastless Track at Home and Abroad
ZHU Gao-ming
Research purposes : The summaries are made on the study and application achievements of ballastlless track at home and abroad for the purpose of providing reference to academic researchers.
Research conclusions: Through analyses of the study and application of ballastless track at home and abroad, the following key points are presented : (1) The suitable R&D technological of ballastless track for Chinese conditions should be found out so as to establish the research model that takes enterprise as main part with integration of university and academy organizations to realize the industrialization of ballastless track. (2) The research team should be set up to overcome the key problems by doing deep research. (3) The researches should be done on the structural form of ballsdess track that adapts to Chinese conditions through summarization and comparison of different structure forms of ballastless track.
2008 Vol. 25 (7): 28-30 [Abstract] ( 2587 ) HTML (1 KB)  PDF  (340 KB)  ( 461 )
31 The NoIllinear Analysis of Vehicle—induced Vibration of Railway Cable—Stayed Bridges with Long Span
WANG Gui-chun, PAN Jia-ying
Research purposes : Cable 一 stayed bridge may produce large deformation due to its long span when vehicle passes the bridge, so the structural geometrical nonlinear characteristic becomes significant. The dynamic analysis of cable - stayed bridge can provide more precise theoretical basis for bridge structural design. On the basis of structural geometrical nonlinearity and the characteristics of the railway bridge, a model of 3 - dimensional dynamic analysis of cable - stayed bridge is advanced. The dynamic responses of cable 一 stayed bridge are calculated by simulating the whole history of a locomotive passing on the bridge.
Research conclusions : The dynamic responses of a railway cable - stayed bridge with 300 m main span are obtained by linear and nonlinear analysis respectively, and the time history curves of structural displacements are given. For railway cable - stayed bridge with long span, the difference between the results of nonlinear analysis and those of linear analysis is obvious. It is necessary to consider the structural geometrical nonlinearity in analysis of vehicle - induced vibration of railway cable - stayed bridges with long span.
2008 Vol. 25 (7): 31-35 [Abstract] ( 2662 ) HTML (1 KB)  PDF  (381 KB)  ( 145 )
36 Research on the Seismic Mitigation Control Algorithm for Cable 一 stayed Bridge
QI Xing-jun, LI Xiao-jun,TANG Hui
Research purposes : Take a long-span floating cable-stayed bridge for example, the semi - active control, active control and passive control analysis of seismic responses is performed with the finite element model. The influence of different seismic control algorithms on seismic response control effect of floating cable - stayed bridge is discussed in order to present theoretical advice for actual cable - stayed bridge mitigation.
Research conclusions ; Seismic mitigation control methods can not make all the seismic responses of bridge less. They make most seismic responses less, but make some other seismic responses larger including bottom shearing force of the bridge tower. Passive control with the most damping force is the best in the 8 control algorithms on vibration - suppressed effectiveness. Semi- active limited Hrovat control algorithm, active control and passive control can not bring acceleration magnified effect, but the other semi - active control algorithms can show acceleration magnified effect with various degrees.
2008 Vol. 25 (7): 36-40 [Abstract] ( 2714 ) HTML (1 KB)  PDF  (431 KB)  ( 136 )
41 Optimum Design of Normal Section and Reinforcement Replacement of Rectangular Reinforced Concrete Beam with Single Reinforcement
WEI Wei
Research purposes: Optimal non-linear mathematical mode is established by taking cross - sectional area of gravity retaining wall as object function and then taking the requirement of ground bearing capacity and stability check as constraint condition. Based on Matlab toolbox, the optimum result is obtained. This method avoids trial calculation process and appropriate cross 一 section is available. Based on considering relative principles of reinforcement replacement, some practical methods for calculating reinforcement replacement of rectangular section flexural members with equal strength, equal deflection and equal crack width are presented,and the key factors in different conditions are analysed. The process of replacing reinforcement becomes shortcut and the results are reliable with this method.
Research conclusions : For large - sized sectional bended members, the optimum design can be made with the method of controlling cross - section bearing capacity and deflection control to avoid the waste caused by blindly increase of the size and amount of reinforcing bars for the cross-section. With using Matlab, the optimum design of rectangular cross section beam with single reinforcing bar can be easily made, and from it the primary values of the section height and ratio of reinforcement can be obtained and the final design result can be obtained after the slight modification is done in consideration of the requirements of beam, weight and its size, module. For the rectangular cross section beam,its common ratio of reinforcement is within 0. 6% and 1. 6%. With using the substitution principle of reinforcing bar and concrete computing method described in this paper, the substitution outcomes can be easily obtained, which meet the checking calculation requirements of section bearing capacity, deflection control and crack width. The calculation example shows this optimum design method can make perfect economic benefits and is worth wide using.
2008 Vol. 25 (7): 41-44 [Abstract] ( 2619 ) HTML (1 KB)  PDF  (363 KB)  ( 153 )
45 Calculations of Temperature Effect on Light Bent Pile Pier of Overhead Bridge and Braking Force of Vehicle for Light Rail .
HAN Ren-hai
Research purposes: At present ,there is no unitary calculation standards for the temperature effect on light bent pile pier of overhead bridge for light rail and the braking force of vehicle in China, so the researches are done on these issues for the purpose of providing reference.
Research conclusions: ( 1) Flexible bent pile pier is composed of single - row or double - row reinforced concrete pile and reinforced concrete cover beam through connections with the main features of transferring the level force (temperature effect and braking force ) from the top structure to every flexible pier of the bridge and rationa allocating the temperature effect and braking force in accordance with rigidity coefficient. (2) From the calculations of the typical bridge, it is found that the uneven level distribution coefficient of overhead bridge for light rail is larger than that of railway bridge, so more attention should be paid to it.
 
2008 Vol. 25 (7): 45-48 [Abstract] ( 2564 ) HTML (1 KB)  PDF  (376 KB)  ( 131 )
49 Designs and Constructions of Vietnamess Baicheng Bridge and Chinese Yamen Bridge
SHE Qiao-ning
Research purposes: The introductions are given to the moldings, structures and construction methods of the bridges in typhoon zones and scenery zones at home and abroad.
Research conclusions : The single cable face cable-stayed bridge can easily integrated into the surrounding scenes because of its light molding and it can meet the requirement of wind resistance in lateral direction with help of buffer. The introductions are given in this paper to the advanced technologies applied in design and construction of scenes, upper and bottom structures, wind resistance and cable staying for Vienames Baicheng Bridge and Chinese Yamen Bridge. In which the innovative technology of steel delta support with prestress and pneumatic caisson method applied in construction of Vienames Baicheng Bridge are worth studying.
2008 Vol. 25 (7): 49-52 [Abstract] ( 2670 ) HTML (1 KB)  PDF  (409 KB)  ( 175 )
53 Discussion on a New Measurement Way for Bridge Deflection
BIAN Yu-sheng
Research purposes: The bridge structured deflection is the integrated reflection of the bridge body's active condition and the significant index of the structure bearing capacity. Especially after the implements of the speed - increase and the heavy haul by China railway, the change law of the bridge deflection must be known in time in order to ensure train running safety. Because there are a large number of bridges needed to be measured after the six - round train speed - increase,the existing instruments and methods to measure the bridge beam deflection are all have some certain limitations and cant meet the requirements. It is urgent to need a portable measuring instrument with features of easy operation and installation and perfect applicability.
Research conclusions: Through making the comparisons of the four current methods in China for beam deflection, the bridge deflection measuring instrument is developed based on the program of using CCD imaging technology to measure the deflection. The experimental results of measuring the bridge deflection on site with this instrument and the special deflection measuring instrument from the bridge examine organization of Beijing Railway Administration show the error is between 3. 0% - 6. 9% and the average measuring difference between them is between 3. 9% , which meets the requirement.
2008 Vol. 25 (7): 53-56 [Abstract] ( 2489 ) HTML (1 KB)  PDF  (355 KB)  ( 211 )
57 Study on the Impact on the Surrounding Buildings by Changjiang River Shield Tunnel and Its Protection
WU Xian - guo1,CHEN Yue - qing2,DING Lie - yun1,WANG Rui', LIU Hui - tao1
Research purposes: The analysis of the impact scope and level are made to the buildings during the tunnel construction. The impact level and the protection standards for the buildings are presented based on the analysis of an example.
Research conclusions;(1) The surface subsidence calculated by Peck Formula is consistent with the actual situation, so Peck Formula has better applicability in Wuhan. (2) Damage level of the building caused by tunnel construction mainly depends on the buried depth of the tunnel, the distance of building to the tunnel and strata loss caused by the construction. The less buried depth of the tunnel and the less distance of building to the tunnel cause larger loss of strata, resulting in larger deformations of surface and building. (3) Damage levels of the buildings caused by tunnel construction can be divided into five categories. To the I and E extent affected buildings, it does not need to take the measures for protection and treatment. To the extent IH - V extent buildings, it must take effective measures for protection.
2008 Vol. 25 (7): 57-60 [Abstract] ( 2716 ) HTML (1 KB)  PDF  (395 KB)  ( 199 )
61 Establishment and Application of Water Bursting Prediction Model for Karst Tunnels '
GAN Kun-rong,LV Xiao-ping, JIANG Su
Research purposes; The studies are done on the variable selection and establishment of mathematical model for the water bursting prediction for karst tunnels on the basis of the analysis of the measured data and the prediction data of the previously typical water bursting of karst tunnels for the purpose of probing into the multi-source cooperative prediction model for the water bursting of karst tunnels.
Research conclusions : With multivariate statistical analysis method, the mathematical water bursting prediction model is established, taking stratum joint density increment, ground water pressure, ratio between longitudinal waves and transverse waves and apparent resistance as prediction variables. The established model can bring active effect on the full use and integration of the available geo 一 physical prospecting information and improving the reliability of water bursting prediction,and is helpful to the probing into the practical multi-source cooperative prediction technology.
2008 Vol. 25 (7): 61-64 [Abstract] ( 2494 ) HTML (1 KB)  PDF  (409 KB)  ( 110 )
65 Analyses and Treatment of Geological Disaster of Heavy Water Bursting to Large Tunnel in Complex Geological Condition Zone
YE Qiao
Research purposes: The geological condition of Tonghai Tunnel is complex with big amount of bursting - water,so the large -scaled water bursting easily happens in construction. The heavy water bursting happened at PDK 35 + 770 of Tonghai Tunnel portal,so it is necessary to analyze and treat such geological disaster in theory.
Research results : Through doing study on and analysis of local geological conditions and hydrographic conditions,the measures of blocking with mortar - stopping wall, radial and ahead grouting reinforcement, central draining water by pipe and by - pass pilot tunnel are taken to the flat pilot tunnel on main line,which avoid the risk of water bursting and guarantee the construction safety, resulting in saving the construction cost and time.
2008 Vol. 25 (7): 65-68 [Abstract] ( 2498 ) HTML (1 KB)  PDF  (400 KB)  ( 169 )
69 Design and Construction of Buffer Structure of Large Section Loess Tunnel Portal
LIU Xu-quan
Research purposes: Taking construction of large section loess tunnel in east Shanxi Province for example, the introduction is given in this paper to the design of buffer structure, treatment of foundation and concrete construction technology for tunnel portal for the purpose of doing research on the negative influence of aerodynamics when high - speed train passes through the tunnel on passenger dedicated line.
Research conclusions : Concrete compaction pile can effectively eliminate the moist and sinking of loess to reinforce the foundation. Hie buffer structure with open and cap brim type incline gate are adopted to the entry of the tunnel,which brings good buffering effect and meets the environmental requirement with good looking and integration of topographical features. But it is proposed to adopt typical design to the gate and buffering section so as to enhance the utilization coefficient of model loop wheel machine because there are lots of difficulties in construction of cap brim type Incline gate with low working efficiency and high cost of model loop wheel machine.
2008 Vol. 25 (7): 69-73 [Abstract] ( 2620 ) HTML (1 KB)  PDF  (552 KB)  ( 200 )
74 Research on the Technology of Single - pipe Drill Level Retrograde Grouting for Completely Decomposed Granite
WANG Quan-sheng,XIAO Hong-qu, LI Zhi-guo
Research purposes ; The site experiment is done on the single-tube drill pipe level retrograde - grouting technology for the purpose of overcoming the bad effect of the forward - stage grouting for the rich water completely decomposed granite because it easily softens, collapses and even flows away, resulting in the open collapse and difficult opening.
Research conclusions : Single - tube drill pipe level retrograde grouting can obtain better grouting effect,but the grouting process and technical parameters should be controlled strictly. In order to obtain a better result of stopping water, it is proposed to use ultra - fine cement or solute grouting liquid.
2008 Vol. 25 (7): 74-78 [Abstract] ( 2518 ) HTML (1 KB)  PDF  (466 KB)  ( 210 )
79 Experimental Research on the Influencing Factors on Electric Flux of High Property Concrete Applied in Passenger Dedicated Line
WANG Xiu-fen
Research purposes: The researches are done on the influencing regulation of ail factors on the chloride ion penetration resistance of the high property concrete applied in passenger dedicated line for the purpose of choosing the concrete matching ratio for the construction.
Research conclusions : As an important evaluation index of the durability of high property concrete for passenger dedicated line,electric flux is influenced by many factors ; The electric flux of concrete increases gradually with increase of water - glue ratio. The air content has less influence on the electric flux of concrete and the electric flux of concrete still meets the requirement of the concrete durability when it is up to 4%. The mud content of sand for concrete should be less than 4%. The 40% fly ash blend ratio is not only the return point of the pressure resistance of concrete, but also the limitation point of the concrete durability. The ignition loss of fly ash has big influence on the early electric flux and 28d electric flux of concrete, but less influence on 58d electric flux. To the electric flux of concrete, the external agent should have the max. limitation ratio.
2008 Vol. 25 (7): 79-82 [Abstract] ( 2657 ) HTML (1 KB)  PDF  (407 KB)  ( 162 )
83 Discussion on How to Improve the Sulfate Corrosion Resistance of Concrete
WANG Xiao-qing
Research purposes: In many areas of northwest, southwest and coastal region in China, underground water riches in sulfate which erodes concrete. So, discussing on how to improve the sulfate corrosion resistance of concrete is of great practical significance to improve engineering quality and lifetime.
Research conclusions : In construction, impregnation with WQ serial or SRA type concrete corrosion - prevention combining with other measures can improve the sulfate corrosion resistance of concrete. Therefore, WQ serial or SRA type concrete corrosion - prevention can be spread and applied in sulfate - rich areas to improve the sulfate corrosion resistance and quality of concrete.
2008 Vol. 25 (7): 83-85 [Abstract] ( 2582 ) HTML (1 KB)  PDF  (411 KB)  ( 278 )
86 Design and Research on Operation Automation of Railway Marshalling Station
LIU Wen
Research purposes : The operation automation of railway marshalling station is a complicated systematical engineering and there is no construction standard and mature technical scheme for its system integration in China,so it is necessary to do the researches on how to effectively integrate resources and improve current systems for the purposes of enhancing entire operation efficiency and quality and realizing the operation automation of marshalling station.
Research conclusions : The design and research scheme mentioned in this paper can notably improve the operation level, management level and production capacity of the marshalling station by transferring the information in time and accurately.
2008 Vol. 25 (7): 86-90 [Abstract] ( 2518 ) HTML (1 KB)  PDF  (474 KB)  ( 208 )
91 Construction Technology of Molded Steel Plate for Canopy Rooting of Railway Station Platform
YANG Hong-tao
Research purposes: The researches are done on how to do the work well of materials selection and how to deal with the nodal point well in construction for the purpose of providing the reference to the design and construction of the canopy roofing of railway station platform.
Research conclusions ; The small ribbed plate should be adopted to the large-span and small-curvature canopy roofing because the curved part requires smooth transition, but the work should be done well on leak - proof with waterproof structure and waterproof paints. The canopy structure should be truss structure with structural rods crossing each other.
2008 Vol. 25 (7): 91-93 [Abstract] ( 2557 ) HTML (1 KB)  PDF  (311 KB)  ( 181 )
94 Time - frequency Analysis of Dynamic Responses for Super - tall Buildings under Typhoons
GU Yuan-sheng,LI Chun-xiang,LI Jin-hua
Research purposes : With the height and ratio increasing,material being low-weight and high-strength, structure system being complex,super - tall building always suffer acute swing under typhoons. So it is extraordinary importance to choose design parameters,forecast structure response,reinforce data of modal parameters,verify design veracity that time-frequency analysis of dynamic responses for super - tall buildings under typhoons.
Research conclusions : By resorting to full-scale measurements of typhoon effects on a super-tall building,the dynamic characteristics of the super - tall building can be obtained with the measured data. Meanwhile,an evaluation may be carried out on the reliability of typhoon - induced responses. The time - frequency analysis methods of typhoon - induced responses of super -tall buildings mainly include the Fourier transform,wavelet transform,and Hilbert-Huang transform (HHT). This paper demonstrates 3 methods mentioned above in detail to summarize their advantages and disadvantages and to further prospect the trends of future researches in this domain.
2008 Vol. 25 (7): 94-97 [Abstract] ( 2555 ) HTML (1 KB)  PDF  (475 KB)  ( 113 )
98 The Effect of Stiffness Ration on Seismic Behavior of Arch Transfer Floor Structure
LIANG Jiong-feng,YANG Ze-ping,WANG Jian-bao,YI Ping-hua
Research purposes; The analyses are made for the effect of the stiffness ration on seismic behavior of the prestressed arch transfer floor structure which is a new type of transfer story structure.
Research conclusions ; The equivalent stiffness ration has an important impact on the sudden changes of the absolute displacement and the displacement angel between floors in transfer floor. When the floor shear suddenly changes in transfer floor and the equivalent stiffness ration is far away from 1.0,earthquake action may be more acute to this structure. It is suitable for control of the equivalent stiffness ration by 0. 8 to 1.5.
2008 Vol. 25 (7): 98-102 [Abstract] ( 2558 ) HTML (1 KB)  PDF  (335 KB)  ( 121 )
103 Research on the Rapid Predicting Model for the Pre - estimated Investment in Railway Construction Project Based on Fuzzy Mathematics
JIANG Zai-qiu
Research purposes: Aiming at the problem that there is no rapid and accurate method for predicting the pre - estimated investment in railway construction project,the rapid predicting model for the pre - estimated investment in railway construction project is established with fuzzy mathematics method for the purposes of rational decision and control of the construction investment and improving the accuracy of predicting pre-estimated investment.
Research conclusions : The rapid predicting model for the pre - estimated investment in railway construction project established with fuzzy mathematics method is easy to use with good applicability, which can realize rapid predict the pre - estimated investment in railway construction project,satisfy the requirement of accuracy,enhance the management level of railway construction and the competition capacity of construction enterprise.
2008 Vol. 25 (7): 103-106 [Abstract] ( 2652 ) HTML (1 KB)  PDF  (388 KB)  ( 151 )
107 Comments on the Key and Difficult Points of Green Construction
ZHANG Gen-feng
Research purposes: Nowadays the huge resources are consumed and the environment is affected by construction industry, so it is very significant to make discussion on how to work out the policy for green construction for the purpose of making construction industry sustainable development.
Research conclusions : It is proposed that the policy should be implemented at the beginning stage of construction in order to strengthen the force of green construction and the policy should rely mainly on the forced indexes while making non - forced indexes as assistance, and the cost of the project funded by the state should be brought into the project budget.
2008 Vol. 25 (7): 107-110 [Abstract] ( 2521 ) HTML (1 KB)  PDF  (420 KB)  ( 265 )
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech