1 Study on Adaptability of the Existing Subgrade to Train Speed-increase
MA Wei-bin, HAN Zi-li, ZHANG Qian-li
Research purposes: Through continuous geophysical prospecting and in-situ test, physical and mechanical parameters of the subgrade are revealed to make a comprehensive evaluation of the subgrade and through train dynamic teat, dynamic responses of the subgrade under different statures are measured to make evaluation of adaptability of subgrade for the purpose of providing technical support for the train speed-increase on existing railway.
Research conclusions: The real train dynamic test indicates that the average dynamic deformation and dynamic stress of the subgrade are close to that of passing current trains when passing freight trains at speed of 120 km/h, and the average dynamic stress of the subgrade is the 1/2 of passing current trains and the average dynamic deformation of the subgrade is the 1/3 of passing current trains when passing 200 km/h EMU. Based on a comprehensive analysis of the test results, this paper points out the main controlled elements of speed-increase subgrade, and presents the technical condition of speed-increase subgrade and the problems and vulnerabilities existed in speed-increase subgrade of existing railway.
2008 Vol. 25 (3): 1-4 [Abstract] ( 2623 ) HTML (1 KB)  PDF  (382 KB)  ( 110 )
5 Analyses of adaptability of Using Gravel Soil as Filling Materials for Subgrade of Passenger Dedicated Railway
XU Guo-Ping, ZHOU Quan-neng, HU Yi-feng
1.Wuchang-Guangzhou Passenger Dedicated Railway Co. Ltd., Wuhan, Hubei 430077, China; 2. China Railway Siyuan Survey and Design Group Co., Ltd, Wuhan, Hubei 430063, China; 3. Obermeyer Planent + Beraten Gmbh Munich, Germany 80686, Germany Abstract:
2008 Vol. 25 (3): 5-9 [Abstract] ( 2493 ) HTML (1 KB)  PDF  (401 KB)  ( 180 )
10 Experimental Research on the Improving Filling Materials with Lime for Argillaceous Sandstone Subgrade
CHEN Hua-lin
Research purposes: Based on the example of improving the filling materials for the subgrade of Wuchang-Guangzhou Passenger Dedicated Railway, the chemical experiments are done on improving sandstone for the purpose of doing research on the feasibility of using sandstone as the filling materials for the subgrade of passenger dedicated railway.
Research conclusions: The improved sandstone is much better in property of physical mechanics, especially in mechanics strength and hydrological property, which can satisfy the requirements of railway subgrade for filling materials, so it is feasible to use calcined lime as the modified agent for all weathered and serious weathered sandstone.
2008 Vol. 25 (3): 10-14 [Abstract] ( 2544 ) HTML (1 KB)  PDF  (407 KB)  ( 284 )
15 Research on the Optimum Structure of Slide Bar Used for Speed-increase Turnout
WANG A-li, FEI Wei-zhou
Research purposes: The improvement and optimum are made for the structure of slide bar of speed-increase turnout for the purpose of solving the existing problems of it, such as failure of tightening force, cracks in spring shim and pin, large surface resistance of slide bed-plate, difficulty in gauge adjusting and so on.
Research conclusions: On the one hand, the improved slide bar can consistently and reliably pressure the inner side of stock rail to keep the consistent pressure. On the other hand, it can be easily and flexibly adaptable to gauge adjustment of stock rail. In addition, the slide bar can reduce the switching resistance of turnout and insufficient displacement of switch rail to guarantee the reliable switching of turnout, which meets the requirement of railway for slide bar.
2008 Vol. 25 (3): 15-19 [Abstract] ( 2507 ) HTML (1 KB)  PDF  (405 KB)  ( 239 )
20 Concept and Intension on System Function Design of Ballastless Track
XIAO Jie-ling, LIU Xue-yi, YANG Rong-shan
Research purposes: This paper analyses and researches the system function of ballastless track and actualization for the purposes of making proposals and providing reference to the design theory for ballastless track.
Research conclusions: The system function is the most important to ballastlesa track. But different structure models and components need different ways for realization of functions. To establish the theoretical system for ballastless track based on system function design is helpful for making the analysis of how to serve the function with structure, define the requirement of each component for function, seek the problems in structure system and establish scientific analysis methods.
2008 Vol. 25 (3): 20-23 [Abstract] ( 2513 ) HTML (1 KB)  PDF  (379 KB)  ( 177 )
24 Comparison of BS5400 with Chinese Highway Code in Reinforced Concrete Design
SU Wu
Research purposes: The introduction is given in this paper to the specifications in BS5400 PART 4: Code of practice for design of concrete bridges, mainly to the designs of reinforced concrete beams, slabs, columns, walls and bases in details for the purpose of helping our civil engineers to better understand the specifications of BS5400 for reinforced concrete design to open up the international construction market.
Research results: It is similar in concrete design strength between BS5400 and Chinese Highway Code and after being divided by 1.1, the value of reinforced characteristic strength in the Chinese Highway Code is similar to that in BS5400. In reinforced concrete design, the calculated result as BS5400 is Mu=5266 kN·m, the calculated result as Chinese Highway Code is Mu=4630 kN·m, these calculated results are the basically same. Chinese Highway Code is safer than others. On short columns design, it focuses on safety in Chinese highway codes; while for BS5400, more consideration is given for economical result. On considerations affecting design details, the mini Mum areas of reinforcement in members in Chinese Highway Code is Much less than BS5400.
2008 Vol. 25 (3): 24-32 [Abstract] ( 2541 ) HTML (1 KB)  PDF  (574 KB)  ( 342 )
33 Analysis of the Key Process and the Technical Method for Construction of the Bridge and Culvert Base on Existing Line with Jacking Method
ZHANG Qun-sheng
Research purposes: The analysis are made for the purpose of seeking the key process, the technology and the method related to the safety of traffic and construction when conducting reconstruction of bridge and culvert base and on existing line and on second line with jacking method.
Research Conclusions: There are large risks in reconstruction of the foundation of existing line and the second line, in jacking-in engineering and in pipe engineering, so it is necessary to pay more attention to these risks in the constructions, and for keeping these risks away to guarantee the traffic and construction safety, the key processes should be controlled, the reliable, effective and mature construction technology and methods should be adopted and construction organization should be done well.
2008 Vol. 25 (3): 33-37 [Abstract] ( 2495 ) HTML (1 KB)  PDF  (426 KB)  ( 171 )
38 Study on Construction Control of Large Span Prestressed Concrete Curved Continuous Box Beam
BAI Hai-feng
Research purposes: Considering the variations of flexibility, stress and geometrical configuration of large span curved continuous beam or continuous rigid frame bridge in the course of construction, the study is done on the issues of flexibility and geometrical configuration control and stress measurement.
Research results: The speck analytical and controlling method for flexibility and configuration control and stress measurement in beam with cantilever wall basket constructing method has been presented. The results show that the flexibility and configuration of the bridge adequately confirm with requirements of design and bridge construction codes.
2008 Vol. 25 (3): 38-41 [Abstract] ( 2485 ) HTML (1 KB)  PDF  (457 KB)  ( 208 )
42 Analyses of Causes for the Deformation Intrusion Structure Ambit of Tunnel on Yichang-Wanzhou Railway and Its Treatment
ZENG Wei, ZHANG Min-qing
Research purposes: Yichang-Wanzhou railway has 159 tunnels and 21 deformation intrusion ambit had happen to 14 tunnels in the course of tunnel construction, up to 8.8 percent of all tunnels. The analyses of the causes for deformation intrusion structure ambit of tunnel are made and the relative measures for deformation intrusion structure ambit of tunnel are proposed.
Research conclusions: The sectional size and burying depth of tunnel are not the causes for deformation intrusion structure ambit, the main causes for it, unfavorable geological conditions, excavation method, auxiliary construction method, primary lining on time and feedback of information on measured data. The study shows: (1) For single track tunnel, the short benched method should be adopted with length of 10~15 meters and for double track tunnel, CRD or CD method should be adopted, or through the leading grouting and big steel tube support in advance, the short benched method should be adopted. (2) The obligate distortion amount of 5~10 cm should remain in advance to single track tunnel of the IV level rock, 10~15 cm to two track tunnel, 10~15 cm to single track tunnel of the j1 level rock, 15-20 cm to two track tunnel and 30~40 cm to tall terra stressed tunnel. (3) If the deformation speed rate is more than or equal to 5mm per day and the total accumulative deformation amount is more than or equal one-third of the obligate distortion amount, the primary lining should be reinforced, and if speed rate is more than or equal l0mm per day and the total accumulative deformation amount is more than or equal to one-third of the obligate distortion amount, the working face should be closed, supported and reinforced with radial grouting. (4) For soft rock and tall terra stressed tunnel, the integrated techniques of primary support and release and reinforcement and lining should be adopted. (5) For intrude structure ambit of the tunnel, first grouting can be conducted to the intrude structure ambit and then the steel frame should be exchanged.
2008 Vol. 25 (3): 42-49 [Abstract] ( 4818 ) HTML (1 KB)  PDF  (607 KB)  ( 119 )
50 Analyses of Influencing Factors of Landslide at Tunnel Portal and Its Treatment
WANG Chong-xun
Research purposes: The discussion is made in this paper on the influencing factors of landslide at tunnel portal and its treatment measure for the purpose of effect control of the landslide at tunnel portal.
Research conclusions: The main causes for the landslide are decrease of the antiskid capacity of slides zone under the action of water, manual excavation of the tunnel open or blasting. The landslide can be controlled effectively by taking relative measures, such as surface drainage, jetting concrete, construction of gravity retaining wall before the tunnel excavation, adopting pipe-shed grouting in advance, steel structure, grouting anchored bar, consolidation grouting and lining.
2008 Vol. 25 (3): 50-53 [Abstract] ( 2561 ) HTML (1 KB)  PDF  (404 KB)  ( 118 )
54 Control Technology for Large Deformation of Highland Stressed Weak Rock in Wushaoling Tunnel
LI Guo-liang, ZHU Yong-quan
Research purposes: The ridge section of Wushaoling tunnel crosses the compressed zone of a regional fault with fracture weak surrounding rock and large compressed deformation, so it is necessary to seek feasible control technology for the purpose of guaranteeing the security of tunnel construction.
Research results: Through doing research on control technology for deformation of the ridge section of Wushaoling tunnel, the relative measures can be taken for successful control of the tunnel deformation in construction, including choice of reasonable dross section shape, remaining deformation amount for the tunnel in advance, multi-supporting, enhancing the rigidity of the flexible lining structure and adopting short benched method with rapid excavation, rapid supporting and timely lining.
2008 Vol. 25 (3): 54-59 [Abstract] ( 2581 ) HTML (1 KB)  PDF  (539 KB)  ( 190 )
60 Research on the Matching Rapid Construction Technology with Machinery for Weak Wall Rock Tunnel
WANG Bing-di
Research purposes: The researches are done on matching rapid construction technology with machinery for highland stressed weak wall rock tunnel for the purposes of setting performance of large-sized machinery in construction of highland stressed weak wall rock tunnel and providing mature and high efficient mode of matching construction machinery with construction technology.
Research conclusions: For rapid construction of the tunnel under condition of highland stressed weak wall rock, first, there should be a support with enough strength to resist the deformation of wall rock and the wall rock should be closed on time with suitable method to form a closed support ring to set performance of the support; then the construction machinery is matched according to the construction method and conditions.
2008 Vol. 25 (3): 60-63 [Abstract] ( 2561 ) HTML (1 KB)  PDF  (423 KB)  ( 87 )
64 Exploration on the Modification of Grades of Surrounding Rock of a Railway Tunnel with Highland Stress and High Water Pressure
GAN Kun-rong
Research purposes: A large number of large deep-buried tunnels are to be built for construction of high-speed railways. It is necessary to modify the original grades of some surround rock in the detailed grade determination of the surrounding rock during the construction: The modification of the highland stress and high water pressure is the dominant content of the modification.
Research results: The basic grades of surrounding rock under high water pressures can be modified by adopting [Q]=[BQ] Jw(Jw=0.1~0.05). Serious grade differences may occur near the standard values in the determination of the grades of the ground stresses on the basis of TB method. Doing researches on the in-situ ground stress assessment and in-situ acquisition technology are an effective means for the modification of the ground stress in the grade determination of the surrounding rock in the construction.
2008 Vol. 25 (3): 64-67 [Abstract] ( 2568 ) HTML (1 KB)  PDF  (333 KB)  ( 130 )
68 Construction Technology for High Risky Qiyueshan Tunnel
ZHANG Qing-xin, WANG Xiao-yan
Research purposes: Qiyueshan Tunnel is one of 8 grade one high risky tunnels on Yichang-Wanzhau Railway with complicated unfavorable geological conditions and high constructional risk. How to prevent and avoid high constructional risk and how to eliminate the unfavorable geological disaster are the key factors of ensuring construction security and quality.
Research conclusions: For prevention of and avoiding high constructional risk in construction of high risky tunnel, the geological risky grade should be classified, the geological forecast in advance, measurement and control of wall rock and measures for alarm of prevention of disaster should be conducted well, more attention should be paid to the construction organization in unfavorable geological zone and the suitable construction program and measures should be adopted and taken, including reinforcement, excavation, support and lining of the wall rock in advance.
2008 Vol. 25 (3): 68-72 [Abstract] ( 2437 ) HTML (1 KB)  PDF  (419 KB)  ( 95 )
73 A Staggered-grid High-order Difference Method for Modeling Seismic Wave Propagation in Tunnel Disaster Detection
LU Guang-yin, HAN Xu-li, ZHU Zi-qiang, HE Xian-qi, CAO Shu-jin
Research purposes: The researches are done on the exploration mechanism of seismic reflection method to the geological disaster during tunnel construction in karat area.
Research results: Results show that by the hybrid method of the absorbing boundary and the nonreflecting boundary, the boundary reflection may be absorbed completely, and by the staggered-grid high-order difference method, the simulated result is very efficiently and precisely. The snap shots of wave-filed and its characters of seismic wave propagation for the complex heterogeneous media, karat cave, and weak interlayer are very directly and exactly.
2008 Vol. 25 (3): 73-77 [Abstract] ( 4826 ) HTML (1 KB)  PDF  (396 KB)  ( 134 )
78 Analysis of the Reasonable Support Length for Multi-spans Submerged Floating Tunnel
QIN Yin-gang, ZHOU Sheng-guo, ZHOU Xiao-Jun
Research purposes: Submerged floating tunnel is a new type of fixed transport facility for crossing waterways and always needs support system between the banks to make it stable when it crosses broad water area. It not only affects the structure's stability but also affects the building coat whether the support system is set up reasonably or not.
Research Conclusions: The current velocity and the vortex frequency influence the support system length mostly. The unstable criterion of the support of the high order for submerged floating tunnel is larger than that for low one. The Melnikov method can be used for judging whether the allocation of support system is reasonable or not.
2008 Vol. 25 (3): 78-81 [Abstract] ( 2504 ) HTML (1 KB)  PDF  (351 KB)  ( 91 )
82 Discussion on the Guidance Effect of Computing Stress with Define-element on Design of Catenary of Electrified Railway
Ruan Yun-bin, QI Guang-feng
Research purposes: The fittings, mast and support system of catenary play an important role in design of catenary of high-speed railway. Whether its structure is stable or not directly makes effect on the dynamic received current between the pantograph and catenary and it is also one of the key factors of guaranteeing traffic safety.
Research results: With continuous development of railway and continuous increasing speed of train, the computing program with define-element analysis to create optimized computing input and output interface can improve the design efficiency, accuracy and quality of catenary of electrified railway.
2008 Vol. 25 (3): 82-84 [Abstract] ( 2531 ) HTML (1 KB)  PDF  (376 KB)  ( 117 )
85 Application of Equivalent Load in Installing Catenary
HUANG He
Research purposes: The equivalent load concept is introduced for purposes of enhancing the speed and security of installing catenary. The analyses of its shortcomings are made and the relative measures for them presented.
Research results: Application of equivalent tension not only reduces the tension of catenary, but also enhances its speed and improves construction security. And the requirement of installing catenary in place for one time can be met by this method.
2008 Vol. 25 (3): 85-87 [Abstract] ( 2551 ) HTML (1 KB)  PDF  (301 KB)  ( 150 )
88 Application of Floating Slab Damping Roadbed with Steel Spring in Metro
GAO Shi-bing
Research purposes: Floating slab damping roadbed with steel spring has been widely applied in metro construction recently, so it is necessary to do the researches on the damping property of it and its scientific link with the relative construction procedure because of high requirements and pressed time limit of metro construction.
Research conclusions: Compared with other damping mode, floating slab damping roadbed with steel spring has the advantages of perfect damping effect and less maintenance, and its disadvantage of long construction time can be overcome with scientific arranging the construction procedure, so it can play more important role in construction of urban mass transit.
2008 Vol. 25 (3): 88-91 [Abstract] ( 2553 ) HTML (1 KB)  PDF  (423 KB)  ( 273 )
92 The Gapless and Polymer Housing Zinc-oxide Surge Arrester with Disconnector for DC Railway
SUN Cheng-liang, ZHOU Lin, ZHAO Jin-feng
Research purposes: The introduction is given in this paper to the surge lightning protections for metro, and the research and test are done on the electrical, mechanical and disconnect operational properties of the gapless and polymer housing zinc-oxide surge arrester with disconnector.
Research conclusions: The gapless and polymer housing zinc-oxide surge arrester with disconnector integrates arrester, isolated device and disconnector together with the features of rational design, fresh structure, characteristics stability, good applicability and perfect operational effect. It is advanced in isolated structure and disconnector and its key property indexes can meet the requirement of metro for lightning protection, so it can be widely used in urban mass transit and intercity railway with DC1500 voltage.
2008 Vol. 25 (3): 92-96 [Abstract] ( 2479 ) HTML (1 KB)  PDF  (452 KB)  ( 104 )
97 Analyses of Present African Roads and Prospects for Access to African Roads Construction Market
WANG Heng, SHI Jing
Research purposes: The discussion is made in this paper on the market prospects of African roads infrastructure construction and the possibility of Chinese enterprise' access to the market.
Research conclusions: (1) The current African highway is at low level which becomes an important element of restraining the economic development. (2) The African highway construction market is a considerable market and it is feasible for Chinese enterprise to open this market. (3) It is necessary for Chinese enterprise to adopt BOT or PPP mode for opening this market and the better preparation works against the unfavorable elements should be done.
2008 Vol. 25 (3): 97-101 [Abstract] ( 2511 ) HTML (1 KB)  PDF  (447 KB)  ( 164 )
102 Discussion on Reasonable Pricing Method for Highway Engineering in Japan and Its Inspiration to China
ZHANG Ying
Research purposes: The analysis of advanced experience of Japanese reasonable pricing method for highway engineering is made and its inspiration to China is summed up.
Research conclusions: The "Market Pricing System" is adopted in Japanese engineering accumulative computing system which is very close to our highway engineering pricing management system, so our reform of highway engineering pricing management can draw following inspirations from it: The "Three exceeding" phenomena should be eliminated, the effects of quota should be paid more attention to, the valuation method of separating estimating price with pricing should be adopter and the intermediary organization should be independent.
2008 Vol. 25 (3): 102-107 [Abstract] ( 2485 ) HTML (1 KB)  PDF  (504 KB)  ( 271 )