1 Discussion on the Counter-analysis of Soil Resistance Coefficient Ratio m
GAO Xi-liang
Research purposes; From the results of the actual active earth pressure and the actual lateral horizontal displacement, the counter-analysis of the value m are made in this paper to gain the ratio relation between the value m and the standard value as well as experience value for the purpose of providing the analytical data for optimizing design.
Research conclusions: In actual construction practice, value m is less than both theoretical value and experimental value. Whether the selected value m is reasonable or not will seriously affect the calculation results of the endogenous stress and the deformation of the bracing structure of foundation pit. Furthermore, it can become the key factor of influencing the selection of bracing project and bracing structure design. In addition, value m, must be calculated by different methods in the same state. Otherwise, the results would deviate greatly, resulting in losing the significance of counter-analysis.
2008 Vol. 25 (2): 1-5 [Abstract] ( 2677 ) HTML (1 KB)  PDF  (461 KB)  ( 218 )
6 Probability Distribution of Measured Standard Penetration Test of Granite Residual Soil and Completely Rotten Soil
ZHANG Kun, GUO Ju-bin
Research purposes: This paper researches the rock characteristics of granite residual soil, discusses the probability distribution of measured stand penetration test (SPT) N of granite residual soil and completely rotten soil and fitted their probability density function.
Research conclusions: At present, there is no consistent suggestion about revised SPT, use measured SPT' make field work more .operable. According to measured results, it can be named residual soil that N is ranging from 15 to 30, and N is ranging from 30 to 50 can be named completely rotten soil. The optimum probability distribution of measured SPT of granite residual soil and completely rotten soil in Shenzhen district is normal distribution by statistical analysis.
2008 Vol. 25 (2): 6-8 [Abstract] ( 2511 ) HTML (1 KB)  PDF  (355 KB)  ( 206 )
9 Exploration on the Temporary Limiting Speed Design Scheme of CTCS
ZOU Shao-wen
Research purposes: The theoretical exploration is made on the temporary limiting speed design schemes of CTCS-2 and CTCS-3 for the purpose of providing early a safe and reliable technical scheme of train running control on passenger dedicated line.
Research results: The explorations are made on the temporary limiting speed design schemes of CTCS-2 and CTCS-3 from the areas of the ways, contents and setting means of temporary limiting speed. The scheme is feasible in theory, but it needs to be verified in real operation for further improvement.
2008 Vol. 25 (2): 9-12 [Abstract] ( 2555 ) HTML (1 KB)  PDF  (348 KB)  ( 246 )
13 Discussion about Relation between Riding Comfortableness and Transition Curve
BAI Bao-ying
Research purposes: Standard of transition curve length is one of the main standards for railway permanent way design and it mostly lies on riding comfortableness and influences route selection, design optimum and precisions of construction and maintenance, so it is necessary to do research on it.
Research conclusions: Rational choice of design standard and calculated result is feasible in technology with definite limit. Base on the method mentioned in this paper, alignment design will be more flexible and design can be optimized reasonably for providing favorable conditions for construction and maintenance, reducing construction cost and reflecting the design concepts of putting man first and servicing traffic.
2008 Vol. 25 (2): 13-16 [Abstract] ( 2563 ) HTML (1 KB)  PDF  (395 KB)  ( 161 )
17 Option of Speed Target Value of the Haerbin-Qiqihaer Inter-city Railway
WANG Xiu-li
Research purposes: The analysis of the speed target value of domestic and international intercity railway, the determination of reasonable speed target value network in China, construction cost, economic benefits, allocation of EMUs and the actual running speed of the train are made for the purpose of determing the reasonable speed target value of the Fourth Line of Haerbin-Qiqihaer Railway.
Research conclusions: From the line functional, investment and economic points of view, the speed target "value of 200-250 km/h should be adopted for the Fourth Line of Haerbin-Qiqihaer Railway, and the speed target value of 300 km/h is the worst in investment profits. Therefore, it is proposed the speed target value of 200 km/h will be adopted in the early opening period of the line, but construction of infrastructure is conducted in accordance with 200-250 km/h because it only needs a little more investment in construction of 200-250 km/h line and the line is already in high plane standard.
2008 Vol. 25 (2): 17-20 [Abstract] ( 2532 ) HTML (1 KB)  PDF  (345 KB)  ( 134 )
21 Experimental Research on Mechanical Characteristics of Red Rock Filling for Subgrade of High-speed Railway
HU An-Hua, JIANG Guan-Lu, WANG Zhi-Meng, WEI Yong-Xing
Research purposes: The main researches are done on the heavy tamping property, CBR bearing ratio, expansibility under simulated load of subgrade, unconfined strength, tri-axial shear strength and modulus of compression for the purpose of verifying the feasibility of using red rock as the filling for high-speed railway.
Research results: Through doing researches, the mechanical and physics characteristics of red rock are obtained, such as the maximum dry density, optimum moisture content, shear strength characteristics under saturated and non-saturated conditions, CBR, expansive characteristic and so on. In combination with the experimental research and construction conducted in Dazhou-Chengdu Railway, the analysis of deformation characteristics of high embankment under saturated and non-saturated conditions are made and also the proposals are made to application of red rock as filling materials in filling subgrade.
2008 Vol. 25 (2): 21-25 [Abstract] ( 2568 ) HTML (1 KB)  PDF  (396 KB)  ( 169 )
26 Analysis of the Displacement Controlling Value of Large Load Pile Foundation Substitution Works
TU Qiang
Research purposes: Pile foundation substitution is a difficult problem in foundation work and the displacement controlling is the key to the pile foundation substitution works. This paper introduces briefly the foundation substitution works under the Grand Merchandise Building in Shenzhen metro, and emphasizes the analysis of the displacement controlling.
Research conclusions: The displacement controlling value is obtained, and the maximum internal force under this value is precondition for substitution structure and dynamic monitoring during constructing.
2008 Vol. 25 (2): 26-30 [Abstract] ( 2637 ) HTML (1 KB)  PDF  (405 KB)  ( 204 )
31 Research on the Bearing Capacity of Single Cement Mixing Pile in Soft Soil Area
LIU Yan-wen
Research purposes: Determining the length of soil-cement mixing pile for composite foundation is an important issue concerned in actual engineering. In this paper, the analytical researches are done on this issue according to different soils in Tianjin.
Research conclusions: The DM pile with more length of lc plays a little role in controlling subsidence and improving bearing capacity, which will be damaged in shallow place because of the material strength. So the proper length of pile should be determined according to actual construction conditions in order to avoid unnecessary waste.
2008 Vol. 25 (2): 31-34 [Abstract] ( 2485 ) HTML (1 KB)  PDF  (402 KB)  ( 169 )
35 Research on the Integrity and Bearing Capacity of Column Pile for Subgrade
CHANG Ju-you, LIU Zhi-jun, ZHOU Qi-xiang
Research purposes: The research is done on how to decide the thickness and characteristics of the slight segregated or serious segregated concrete on the end of column pile for the subgrade of Wuchang-Guangzhou Passenger Dedicated Railway.
Research results: The thickness and characteristics of the slight segregated or serious segregated concretes can be decided with the mass integrity of pile body made by reflection seismology. It can be seen from static test for single pile that the bearing capacity of the slight segregated or serious segregated concrete on the end of column pile is more than 2000 kN.
2008 Vol. 25 (2): 35-39 [Abstract] ( 2588 ) HTML (1 KB)  PDF  (421 KB)  ( 155 )
40 Design and Research on the Fuzhou-Xiamen Railway Bridge
CHEN Lie
Research purposes: To have a study of such, key technology as the design principle for bridge on Fuzhou-Xiamen railway with a speed of 250 km/h, design on steel-box tied arch bridge with a span of 128 m, prestressed concrete continuous beam with spans of (80+3*144+80) m, and construction organization of simple supported box girder bridge over hill and dale section.
Research Conclusions: In principle the integral span simply supported box girder, prefabrication in girder yard, integral span transportation, bridge position erecting shall be adopted on the whole line, if impossible. It is necessary to perform some special treatment; the steel-box tied arch bridge with a span of 128 m and a rise-span ratio of 1/5.333 is mainly composed of steel box section and steel deck structure. After installed on the bracket, it will be positioned by dragging method. It is shown from static and dynamic analysis as well as fatigue test that such structure design is safe and reasonable; that the structural type of prestressed concrete continuous beam with spans of (80+3*144+80) m is reasonable for navigation; the continuous beam structure, bearing support for earthquake-isolation and reduction, and beam-fixed equipment are adopted for insuring the safety and rationality of the structural design; the measures for the partial flange plate off integral span box girder to be transported by way of tunnel, casting-in situ integral span box girder by overhead launching gantry are effective on settling the issues of integral span box girder transporting and erecting in the dense bridge-tunnel connection section.
2008 Vol. 25 (2): 40-42 [Abstract] ( 2409 ) HTML (1 KB)  PDF  (440 KB)  ( 192 )
43 Overall Design of Variable Width Large-span Continuous Beam in Turnout Area of Hanjiang Bridge for Xiamen-Shenzhen Railway
YAO Jun-sheng, XU Zhi-yan, REN Wei, CHEN Lie
Research purposes: With the development of passenger dedicated line in our country, it is inevitable to install the turnout on the bridge due to the layout of stations. The researches are done in this paper on the design of the ballast track variable width continuous beam structure in the turnout area of Hanjiang Major Bridge with main spans (48+3*80+48 m)of Xiamen-Shenzhen railway from areas of bridge deck layout, structure style and construction program.
Research results: Through making analyses of large-span variable width continuous beam with finite element method, all indexes meet the standards for bridge and track, so Hanjiang Major Bridge satisfies the demands of station layout, navigation and flood protection. This is the first time for China to install the high-speed gapless turnout on the large-span PC continuous beam bridge, which is a new key breakthrough and innovation in technology for passenger dedicated line in China.
2008 Vol. 25 (2): 43-46 [Abstract] ( 2543 ) HTML (1 KB)  PDF  (340 KB)  ( 187 )
47 Design and Study of Continuous Welded Rail on Bridge in the Small Radius Curve Section
GUO Li
Research purposes: To solve the problems on designing continuous welded rail on bridge in the small radius curve section.
Research conclusions: When designing continuous welded rail on bridge in the small radius curve section, these factors should be especially considered; increasing lateral ballast resistance, reducing additional forces of the continuous welded rail on bridge, and properly increasing the design stress-free temperature of rail.
2008 Vol. 25 (2): 47-49 [Abstract] ( 2695 ) HTML (1 KB)  PDF  (326 KB)  ( 173 )
50 Counter-analysis of Displacement of Support Structures in the F4 Fault of Wushaoling Tunnel
SUN Qi-qing, ZHAO Wan-qiang, GAO Feng, YU Yu, KUANG Liang
Research purposes: The F4 Fault is an important district for design and construction of Wushaoling Tunnel, so it is necessary to define the parameters of the initial ground-stress of surrounding rocks and materials properties for the purpose of bringing the tunnel passing this district successfully.
Research results: Based on the site surveyed data of Wushaoling Tunnel, the research is done on defining the initial ground-stress of surrounding rocks in F4 Fault and materials properties with encounter-analysis of displacements and finite element method. Meanwhile, the initial support and bolts and the stress of second lining of tunnel are defined and the stable status of the support structure is evaluated with characteristic curve method.
2008 Vol. 25 (2): 50-53 [Abstract] ( 4784 ) HTML (1 KB)  PDF  (371 KB)  ( 189 )
54 Analyses of the Sloughing of Tunnel Portal of Yichang-Wanzhou Railway and Its Treatment
ZHANG Min-qing, HUANG Hong-jian, MIAO De-hai, TIAN Si-ming
Research purposes: Yichang-Wanzhou railway has 159 tunnels and 150 tunnel portals. Sloughing had happened to 9 tunnel portals during the construction. The analyses of the cause for the sloughing and its treatment are made for purpose of providing reference to the similar construction.
Research conclusions: The sloughing of the tunnel portal is not only related to the geological reason, but also to the unfaithful reconnaissance and unchanging the design scheme timely. Nowadays the main causes for the sloughing of tunnel portal are that the construction is not conducted according to the design, the construction scheme is not changed timely, the construction method is not suitable and the monitoring is not done on time. For the sloughing of tunnel portal, the following measures should be taken; the anchor bolt and steel gridding and spurt concrete are used if the thickness of the soft rock is less than and equal to Sm, the steel-pipe pile and grouting are adopted if the thickness of the soft rock is 5-10m, and the anti-slide pile should be adopted if the thickness of the soft rock is greater than 10m. At the same time, it is necessary to lay the secondary lining to the tunnel outside and tunnel portal.
2008 Vol. 25 (2): 54-60 [Abstract] ( 2552 ) HTML (1 KB)  PDF  (770 KB)  ( 239 )
61 Resampling TEM Sounding Data by Time-dependent Filter Method
ZHANG Ji-ling, WENG Ai-hua
Research purposes: To obtain the inversion of the transient electromagnetic sounding (TEMS) data sampled in an equivalent interval mode, the data should be compressed in an undamaged manner, so it is necessary to do research on it.
Research conclusions: The data show that although the signal-to-noise ratio of TEMS response is very low in late time, but the correct decay curve can be produced by adopting time-dependent filter method. Therefore, time-de-pendent filter technique can be used to compress dense TEMS data without losing of decay information.
2008 Vol. 25 (2): 61-64 [Abstract] ( 2466 ) HTML (1 KB)  PDF  (333 KB)  ( 134 )
65 Dynamic Reactive Power Compensation in Railway Substation
WANG Hong-mei, GUO Jing-wu
Research purposes: The research is done on the dynamic reactive power compensation in railway substation for the purposes of solving the problem of over-compensation or under-compensation caused by static compensation in the substation, lowering the loss of railway power supply line and guaranteeing the stability of power supply system.
Research results: According to the pole of demand load and the compensated capacity required in the running process, the dynamic reactive power device can control the capacitor equipments individually and integrally for realizing comprehensively automatic adjustment of voltage and reactive power to improve the power supply quality and balance the reactive power in place.
2008 Vol. 25 (2): 65-68 [Abstract] ( 2480 ) HTML (1 KB)  PDF  (333 KB)  ( 141 )
69 Research on the Application of Digital Video Monitoring System in Railway
XIAO Kun
Research purposes: The researches are done on the design of railway integral digital video monitoring system from the areas of system component, function requirement and network structure according to the requirement of digital video monitoring system for railway.
Research conclusions: The main things for design of railway digital video monitoring system are to choose camera model and storage capacity, calculate focus and communication bandwidth and realize linkage function. It requires that the designer has higher technical capability and overall idea of system for knowing the technical development of system and the requirement of users and actual conditions to present the proper design program of system for the customers.
2008 Vol. 25 (2): 69-72 [Abstract] ( 2539 ) HTML (1 KB)  PDF  (368 KB)  ( 194 )
73 Discussion on Operation Mode of Integrated Supervisory Control System for Rail Communication
DAI Lin
Research purposes: An integrated supervisory control system with proper system scale, system range, depth, and function should be established for playing the coordination role in metro operation, so it is necessary to do research on the operation mode of integrated supervisory control system for rail communication.
Research results: A suitable integrated scheme is proposed through comparison of system range and depth. The schemes of coordinating all subsystems are presented for the different operation conditions, such as normal condition, blocking condition, equipment failure condition, equipment maintenance, platform firing condition, station hall firing condition, section firing condition and so on.
2008 Vol. 25 (2): 73-76 [Abstract] ( 2512 ) HTML (1 KB)  PDF  (391 KB)  ( 238 )
77 Comparison and Selection of the Catenary Suspension Installed on the Platform Canopy without Post in Jinan Rail Station
WANG Guo-Bang, ZHAO Hong-yu, LUO Jian, DAI Lang-jie
Research purposes: The comparison and selection of catenary suspension installed on the platform canopy without post in Jinan Railway Station are made for the purpose of matching the innovation of the canopy without post in Jinan Railway Station.
Research results: Based on the general study and the checking computations of the bearing capacity of relative structure of canopy, it is recommended the through large-span soft cross bracing scheme should be adopted for catenary suspension installed on the platform canopy without post in Jinan railway station.
2008 Vol. 25 (2): 77-79 [Abstract] ( 2528 ) HTML (1 KB)  PDF  (294 KB)  ( 209 )
80 Comprehensive Analysis of Track Joining Scheme of Release Line of Dalian Metro Depot
ZHANG Peng
Research purposes: Taking the track joining scheme of release line of Dalian Metro Depot of the first stage project of Dalian metro line 2 as an example, the comprehensive analysis of the track joining are made for the purposes of optimizing the scheme and showing how to make the analyses of it based on the urban planning, land form conditions, line directions, depot location and form and location of the station as well as design principles and technical standards, so as to solve the difficult problems in track joining under different conditions.
Research conclusions: The release line should be located at terminal or reentry stations following by the principle of convenience, reducing the running time of empty train and operating costs. That is to say the rational choice of track joining scheme should be conducted after making the analysis of depot, line conditions, vehicle conditions and the joining condition from economical and technical points of view.
2008 Vol. 25 (2): 80-83 [Abstract] ( 2541 ) HTML (1 KB)  PDF  (330 KB)  ( 330 )
84 Analysis of Design Thoughts on Tianjin Terminal
GUO Lin
Research purposes: According to the feature of Tianjin terminal that integrates intercity train, ordinary-speed train, rail communication, bus, taxi and other transportation, the design thoughts on Tianjin terminal is presented for the purpose of providing reference to other similar construction.
Research results: Through predication of the passenger flow, control of terminal scale, orientation of geography and function, organization of interchange and traffic, arrangement of construction procedure and plan of other areas, the functions of Tianjin terminal are more integral for the convenience, high efficiency, economy and socialization.
2008 Vol. 25 (2): 84-88 [Abstract] ( 2675 ) HTML (1 KB)  PDF  (529 KB)  ( 212 )
89 Research on the Maximum Grade of Tianjin Underground Zhijing Line
TANG Wei-qiang, ZHANG Ji-qing
Research purposes: Tianjin underground Zhijing line is the connecting line between Tianjin West station and Tianjin station and an important part of Tianjin railway terminal as well as a shortcut of passenger dedicated line from Tianjin to Qinhuangdao and high-speed railway from Beijing to Shanghai. The line is located in flourishing Haihe economic zone in Tianjin with many controlled spots, so the construction investment and traffic safety are affected very much by the maximum grade. Therefore, it is very necessary to do study on determining the maximum grade for the purposes of controlling the construction investment efficiently, reducing engineering difficulties and ensuring the safety of railway operation.
Research conclusions: The scheme of 23‰ grade is feasible in technology and reasonable in economy, so it is suitable for Tianjin underground Zhijing line to adopt 23‰ maximum grade.
2008 Vol. 25 (2): 89-93 [Abstract] ( 2624 ) HTML (1 KB)  PDF  (407 KB)  ( 115 )
94 Research on the Inspection and Repair Technics of Straddled-type Monorail Depot
CAO Ke-fei
Research purposes: Take the first monorail depot in our country for example, this paper researches the rolling stock repair technical, then offers help to the design of new monorail depot in the future.
Research conclusions: In the design of inspection and repair technics of monorail depot, we should know the structure of staple of monorail, such as rolling stock, track beam, turnout and so on. When designing the workshop structure and collect equipment for inspection and repairing the rolling stock, we should be under the prerequisite on meeting the maintenance requirement of monorail rolling stock.
2008 Vol. 25 (2): 94-96 [Abstract] ( 2559 ) HTML (1 KB)  PDF  (580 KB)  ( 479 )
97 Choice of Maximum Running Speed of vehicles for Urban Mass Transit
XU De-xin
Research purposes: The analysis of main factors influencing choice of maximum speed of vehicles for urban mass transit are made for the purposes of seeking the general law of determining the maximum speed of vehicles so as to reduce the energy consumption and the vehicle quantity.
Research conclusions: The grade of maximum speed of vehicles for urban mass transit is generally determined as the mean distance between stations. It is recommend adopting the highest train running speed of 120 km/h for the distance of approximate 3.4 km between stations, the highest train cunning speed of 100 km/h for the distance of approximate 2.3 km between stations and the highest train running speed of 80 km/h for the distance of approximate 1.5 km between stations.
2008 Vol. 25 (2): 97-99 [Abstract] ( 2752 ) HTML (1 KB)  PDF  (265 KB)  ( 232 )
100 Establish the Technical Platform of Urban Mass Transit to Improve Its Design Technology
YU Chun-hua, MA Zhen-hai
Research purposes: It is very important to establishing the technical platform of urban mass transit, so it is necessary to determine its key technologies based on current development of urban mass transit. The proposals are presented.
Research conclusions: Our design level of urban mass transit can be reached at the advanced level through establishing the technical platform of urban mass transit as soon as possible, improving the design criterion and technical standard, paying more attention to designing standardization, strengthening the investment in the development of new product and technique and improving the design quality and efficiency.
2008 Vol. 25 (2): 100-103 [Abstract] ( 2515 ) HTML (1 KB)  PDF  (464 KB)  ( 155 )