Abstract:Based on the analyses o f the recent si tuatio n and the exi sting problems of the conveying equipments fo r co nst ructing sing le-t rack tunnels wi th non-rai l t ranspo rt , several conceptio ns and sugg estio ns are proposed for reference in situ.
魏举田 贾运宽. 单线隧道无轨运输施工装运 设备配套的探索[J]. 铁道工程学报, 1997, 14(1): 139-146.
Wei Jutian Jia Yunkuan. RESEARCH AND EXPLORATION ON FORMATION A COMPLETE SET OF CONVEYING EQUIPMENTS FOR CONSTRUCTING SINGLE-TRACK TUNNEL WITH NON-RAIL TRANSPORT. Journal of Railway Engineering Society, 1997, 14(1): 139-146.