Abstract:The paper makes compari so n amd amalysis on the t radi tio nal quantitative metho ds fo r delay 's g eneral ma nagement ex penses in the interna tional engineering claims. Th e sev era l main methods are studied in detai l, and thei r limi ta tio ns are pointed o ut. An improv ed Hudson method i s propo sed. The presupposi tions the applicable co ndi tio ns for dif ferent metho ds a re al so analy zed.
王亚平,叶仁荪,蒋根谋. 国际工程延期总部管理费 索赔的定量方法研究[J]. 铁道工程学报, 1998, 15(2): 142-146.
Ye Rensun Wang Yaping Jiang Genmou. STUDY ON INTERNATIONAL QUANTITATIVE METHOD FOR CLAIMING GENERAL MANAGEMENT EXPENSES DURING DELAY OF ENGINEERING PROJECT. Journal of Railway Engineering Society, 1998, 15(2): 142-146.