Abstract:The paper expounds the measures for lowering the temperature in tunnel during the con?struction of the Qinling extra-long tunnel. The experience has been provided to solve the problem of lowering of temperature for constructing long tunnels in China hereafter.
苟彪,张军平. 秦岭特长隧道II线平导施工降温措施的现场监测和研究分析[J]. 铁道工程学报, 1999, 16(1): 50-53.
GOU Biao,ZHANG Junping. WORKSITE MONITOR AND ITS ANALYSIS FOR LOWERING TEMPER?ATURE IN PARALLEL HEADING DURING CONSTRUCTION OF QIN- LING EXTRA-LONG TUNNEL. Journal of Railway Engineering Society, 1999, 16(1): 50-53.