Abstract:The structure of double-hinged arch tunnel is adopted in Dongzhimen section on Beijing urban transit, for which the shallow buried subsurface excavation method was adopted in order to under cross two high-rise buildings with shaoolw foundation in water riching and loosening formation. This paper describes the used technical methods for treating the formation related to the structure, tunnel construction and existing buildings and also describes the prevention technique for high-rise buildings and monitoring works in construction, for reference to future similar works.
范国文,王先堂. 暗挖双连拱隧道穿越浅基础高层楼群区施工技术[J]. 铁道工程学报, 2003, 20(3): 109-116.
FAN Guo-wen, WANG Xian-tang. CONSTRUCTION TECHNIQUE FOR SUBSURFACE EXCAVATION OF DOUBLE-HINGED ARCH TUNNEL CROSSING HIGH-RISE BUILDINGS AREA WITH SHALLOW FOUNDATION. 铁道工程学报, 2003, 20(3): 109-116.