Abstract:This paper analyses the division of engineering section, arrangement of construction schedule and service for rapid construction of submarine tunnel from strategy, presents the roles in rapid construction of submarine tunnel by adopting key techniques for advanced geological forecast, treatment of weathered trough, water proofing and air ventilation from tactics.
范恒秀,郝小苏. 厦门东通道海底隧道快速施工之浅见[J]. 铁道工程学报, 2005, 22(3): 61-64.
FAN Heng-xiu, HAO Xiao-su. COMMENTS ON RAPID CONSTRUCTION OF SUBMARINE TUNNEL FOR XIAMEN EAST CORRIDOR. 铁道工程学报, 2005, 22(3): 61-64.