Research on Construction Control Technology for Railway Tunnel underneath Passing Existing Expressway Tunnel
ZHENG Jun-jie1, BAO De-yong1, GONG Yan-feng2, ZI Yi2
1.Huazhong University of Science and Technology, Wuhan, Hubei 430074, China; 2.The Fourth Survey and Design Institute of China Railway, Wuhan, Hubei 430063, China
Abstract:Research purposes: The purposes are to ensure the construction safety of newly-built tunnel and make existing road open to traffic usually while the newly-built tunnel underneath passes existing tunnel nearby.
Research methods: According to the real construction situation of Guantouling Tunnel underneath passing existing expressway tunnel on Wenzhou-Fuzhou Railway Line and in combination with the research achievements at home and abroad, and current state codes, the analysis and research have be made on construction scheme for newly building a tunnel around cross point and on measures for monitoring and measuring the existing expressway tunnel based on the analysis of integrity level of existing tunnel and construction countermeasures.
Research results: Several construction techniques and their relative parameters and control standard are presented.
Research conclusions: (1) more attention should be paid to the serious harm probably caused by blast vibration nearby. Therefore, it is necessary to evaluate the lining strength of existing tunnel cavity distribution behind lining and earthquake resistant behavior of lining, to work out the basic control standard for blast vibration and make research on rational blast parameters before construction of intersection of Guantouling Tunnel. (2)When the working face of newly-built tunnel approaches to whole diameter of 3~4 times from cross point, the monitoring and measurement in the existing tunnel should be done well. With the analysis result of monitoring, the adjustments should be made rationally of excavation way, blast parameters and method of ignition in order to ensure the safety of the tunnel. (3)After finishing the construction of intersection the safety should be re-evaluated to tunnel lining structure near the cross point of existing tunnel in order that the tunnel will not be damaged with time passing by.
郑俊杰,包德勇,龚彦峰,资谊. 铁路隧道下穿既有高速公路隧道施工控制技术研究[J]. 铁道工程学报, 2006, 23(8): 80-84.
ZHENG Jun-jie, BAO De-yong, GONG Yan-feng, ZI Yi. Research on Construction Control Technology for Railway Tunnel underneath Passing Existing Expressway Tunnel. 铁道工程学报, 2006, 23(8): 80-84.