Abstract:Research purposes: To get more clear height of overpass railway bridge in electrified upgrading of existing railway,the structure with lower height should be designed to replace the existing beam,and in the meantime the upgrading work should not disturb the traffic of the existing railway.The application of orthotropic deck through steel plate girder to replace the existing 16 m prestressed concrete beam is discussed in this paper
Research conclusions:The orthotropic deck through steel plate girder is a kind of structure with two main girders connected with steel bridge deck stiffened by longitudinal and transverse beams to transfer the loads from bridge deck and longitudinal and transverse beams to main girders.Compared with prestressed concrete girder,this steel plate girder can reduce structural height and can be prefabricated in factory and assembled and erected in construction site.Replacement of existing concrete girder can be done and completed in skylight time,which can speed up the construction process.In addition,the ballast can be laid directly on steel deck,which call reduce the maintenance difficulty caused by open bridge floor.The mechanical performance of orthotropie deck through steel plate is discussed as well in this paper.This structure has already used in electrified upgrade of Beijing—Kowloon Railway successfully.
Guo Wenhua,Zeng Xiangyuan. Calculation and Analysis of Spatial Vibration for Through Steel Plate Girder Bridge[J].Journal of Vibration and Shock, 2003(3):l-5.
Gu Ping,Gu Jianxin.Study on Lateral Stiffness Strengthening for the Existing Through Steel Plate Girder Bridges[J].China Railway Science,2005(1):54—57.
Xu Wei,Zhang Xiaoning.Numerical Simulation and Optimization Analysis of the Structure of Steel Orthotropic Bridge Deck[J].Journal of Central South Highway Engineering,2006(3):59-62.
Gu Jianxin.Xia Wei. Research on Raising the Transverse Rigidity Technology of Low Support Steel Plate Beam[J].Shanghai Railway Science& Technology,2004(4):2-3
[6]TB 10002.2—2005,铁路桥梁钢结构设计规范[s].
TB 10002.2005.Code for the Designs of the SteelStructures in the Railway Bridges[S].
[7]铁道专业设计院.钢桥[M].北京:中国铁道出版社,2003.
China Railway Institute.Steel Bridge[M].Beijing:China Railway Publishing House,2003.
The Third Railway Survey and Design Institute Co.Ltd.Prelhninary Design for Electrified Renovation of Beijing Kowloon Railway Line,Beijing—Huaibin Section[M].Tianjin:The Third Railway Survey and Design Institute Co.Ltd..2007.
[9] 李桃.京沪铁路电气化改造上跨建筑物的处理方案[J].铁道运营技术,2006(3):8—9.
Li Tao.Solution of Overpass in Electrified Renovation of Existing Jing—Hu Line[J].Railway Operation Technology,2006(3):8-9.
[10]宋久涛.浅论京九线电气化改造的必要性[J].铁道工程学报,2006(3):75—78.
Song Jiutao.Discuss on the Necessity to the Electric Reconstruction of BeUing—Kowloon Railway Line[J].Journal of Railway Engineering Society,2006(3):75—78.
[11]TB 10002.1q005,铁路桥梁设计基本规范[s].
TB 10002.1—2005.Fundamental Code for Design on Railway Bridge and Culvert[S]