TBM Type-selection and Study on Optimization of Support System for Super Long Dahuofang Water Tunnel
ZHANG Jun-wei1, MEI Zhi-rong2, Tang Yu3,ZHANG Yuan-ai2
1.China Academy of Railway Sciences, Beijing 100081, China; 2. Southwest Research Institute Co. Ltd. Of CREC, Chengdu, Sichuan 610031, China; 3. Liaoning Runzhong Water Supply Ltd., Liaoning,Shenyang 110000, China
Abstract:Research purposes:The Dahuofang water tunnel is a super long deep-buried tunnel with the length of main tunnel of 85.32 km and excavation diameter of 8.03 m. TBM was used as main construction method along with bored blasting method for construction of the tunnel. As the tunnel passed through the area with complicated hydrogeologic conditions, it was necessary to do the works of TBM type-selection and optimization of the support system so as to solve the technical problems related to the stability of surrounding rock, water inrush of the tunnel, tunneling efficiency in quartz sandstone area and rock outburst while tunneling.
Research conclusions:Based on studying a large number of data and TBM construction cases, the main engineering geological problems in the area where the tunnel passed through were analyzed. Based on the analysis of TBM construction experiences at home and abroad, it was decided to adopt the open-type TBM for construction of the tunnel and to adopt the composite lining structure made up of bolt-shotcrete support+cast concrete lining as support system of tunnel instead of segment lining. It played an important role in construction of tunnel and could be as the reference to the similar projects in the future.
张军伟;梅志荣;唐 与;章元爱. 大伙房输水工程特长隧洞TBM选型及支护系统优化研究[J]. 铁道工程学报, 2010, 27(3): 61-65.
ZHANG Jun-wei, MEI Zhi-rong, Tang Yu,ZHANG Yuan-ai. TBM Type-selection and Study on Optimization of Support System for Super Long Dahuofang Water Tunnel. 铁道工程学报, 2010, 27(3): 61-65.
MeiZhirong, Gao Juru, Tang Yu, et al. Study on Key Construction Technology for Super-long Tunnel of Dahuofang Transfer Project[R]. Chengdu: China Railway Southwest Research Institute, 2009.
Mei Zhirong, Zhang Junwei, Zhang Yuanai, et al. Study on Optimization of Construction Method and TBM Lectotype technology of Super-long Tunnel[C] //The Conference for the Fifth Chinese and Japanse Shield Tunnel Technology. Chengdu: Southwest Jiaotong University, 2009: 204 -313.
Wang Mengshu, Li Dianhuang, Zhang Jingjian, et al. Tunneling with Rock TBM and Related Case Histories[M]. Beijing:China Railway Publishing House, 2004.
Yin Juntao, Shang Yanjun, Fu Bingjun, et al. Development of TBM Excavation Technology and Analyses and Countermeasures of Related Engineering Geological Problems[J]. Journal of Engineering Geology, 2005(3): 389-397.
Zhang Jingjian, Fu Bingjun. Advances in Tunnel Boring Machine Application in China[J]. Chinese Journal of Rock Mechanics and Engineering, 2007(2): 226-238.
Qian Qihu, Li Chaofu, Fu Deming. Application Situation and Out look of TBM in Underground Project in China[J]. Construction Machinery, 2002(5): 28-35.
[ 8 ] ITA Working Group, Recommendations and Guidelines for Tunnel Boring Machine[R]. ITA, 2000: 10 -20.
[ 9 ] Katsushi Miura. Design and construction of mountain tunnels in Japan[J]. Tunnelling and Underground Space Technology, 2003(18): 115 -126.
[ 10 ] C.Carranza-Torres, M.Diederichs. Mechanical analysis of circular liners with particular reference to composite supports[J]. Tunnelling and Underground Space Technology, 2009(24): 506 -532.
[ 11 ] Kourosh Shahriar, Mostafa Sharifzadeh, Jafar Khademi Hamidi. Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions[J]. Tunnelling and Underground Space Technology, 2008(23): 318 -325. [ 12 ] ThomasKasper, et al. A numerical study of the effect of soil and grout material properties and cover depth in shield tunneling[J]. Computers and Geotechnics, 2006 (33): 234 -247.