沪宁城际铁路基坑开挖对既有线动态影响分析

罗锟,雷晓燕

铁道工程学报 ›› 2010, Vol. 27 ›› Issue (9) : 5-8.

PDF(331 KB)
PDF(331 KB)
铁道工程学报 ›› 2010, Vol. 27 ›› Issue (9) : 5-8.
路网研究

沪宁城际铁路基坑开挖对既有线动态影响分析

  • 罗锟,雷晓燕
作者信息 +

The Dynamic Analysis of the Existing Railway’s Subgrade Settlement Caused by Excavation Pit on Hu—Ning Line

  • LUO Kun,LEI Xiao—yan
Author information +
文章历史 +

摘要

研究目的:随着列车运行速度的提高,轨道结构的动力响应将增加,对轨道结构动态几何形位的良好保持提出了更高的要求。本文以既有沪宁线旁沪宁城际铁路桥墩基坑的开挖为例,分析基坑开挖对既有沪宁线路基沉降的动态影响。
研究结论:通过建立车辆一轨道一路基耦合系统动力分析模型和路基一土体一基坑一支护结构耦合系统动力分析模型,分析基坑对路基沉降的影响。结果表明:基坑的开挖深度、开挖后支护方法、列车通过方式均对邻近既有线路路基沉降造成影响。3种不同工况下的竖向动位移范围在0.8—1.6mm,满足规范要求。

Abstract

Research purposes: With the increase of high—speed train’s speed,the dynamic response of track structure will be increased,which requires more about the track geometry.This paper takes the excavation pit on Hu—Ning intercity passenger rail by the side of existing railway line for example to analyze dynamic response of subgrade settlement caused by the excavation pit.
Research conclusions: In order to analyze the subsidence of roadbed caused by excavation of foundation ditch,the numerical model was set up,which is composed of two parts,including the vehicle—track—roadbed—ground coupling system and the roadbed—ground—ditch—supporting structure coupling system.It is shown that the depth.Support Method. and the load will induce the different sedimentation of the roadbed.The vertical dynamic displacement in the three cases is between 0.8 to 1.6 mm.and which come up to the standard.

关键词

有限元 / 基坑 / 高速铁路

Key words

finite element analysis / foundation ditch / high speed railway

引用本文

导出引用
罗锟, 雷晓燕. 沪宁城际铁路基坑开挖对既有线动态影响分析[J]. 铁道工程学报, 2010, 27(9): 5-8
LUO Kun, LEI Xiao—yan. The Dynamic Analysis of the Existing Railway’s Subgrade Settlement Caused by Excavation Pit on Hu—Ning Line[J]. Journal of Railway Engineering Society, 2010, 27(9): 5-8
中图分类号: U211.2   

参考文献

[1] 陈震.高速铁路路基结构动力有限元分析[J].路基工 程, 2007(131): 14 -16.
Chen Zhen. Dynamic FEM Analysis for High Speed Railway Subgrade [J ]. Subgrade Engineering, 2007 (131): 14 -16.
[2] 韩学伟,等.跨沪宁铁路既有线74号墩承台基坑支护设 计报告[R].上海:中国交通建设股份有限公司, 2009.
Han Xuewei, eta.l The Supporting Design Report of the 74th Foundation Ditch Crossing Hu-Ning Line [R ]. Shanghai: China Communications Construction Company Limited, 2009.
[3] 铁建设[2005] 140号,新建时速200~250公里客运专线 铁路设计暂行规定[S].
Railway Construction [2005 ] No. 140, The Temporary Provisions for the Design of Newly 200 ~250 km per hour Passenger Dedicated Railway[S].
[4] 铁建设[2007] 47号,新建时速300~350公里客运专线 铁路设计暂行规定[S].
Railway Construction [2007 ] No. 47, The Temporary Provisions for the Design of Newly 300 ~350 km per hour Passenger Dedicated Railway[S].
[5] 雷晓燕,圣小珍.现代轨道理论研究[M ].北京:中国铁 道出版社, 2006.
Lei Xiaoyan, Sheng Xiaozhen. Advanced Studies in Modern Track Theory [M ]. Beijing: China Railway Publishing House, 2006.
[6] 雷晓燕.高速铁路轨道振动与轨道临界速度的傅里叶变 换法[J].中国铁道科学, 2007(6): 30 -32.
Lei Xiaoyan. Analyses of Track Vibration and Track Critical Velocity for High-speed Railway with Fourier Transform Technique [J]. China Railway Science, 2007 (6): 30 -32.
[7] 雷晓燕.轨道力学与工程新方法[M ].北京:中国铁道出 版社, 2002.
Lei Xiaoyan. New Methods in Railroad Track Mechanics and Technology[M ]. Beijing:China Railway Publishing House, 2002.
 

基金

国家自然基金项目(50978099),江西省自然科学基金项目(2009GQC0017),铁路环境振动与噪声教育部工程研究中心资助(09GD03)