Abstract:Research purposes: The adjustmen t processing w as made for themeasured data from CPIIII plane netw ork o fone high- speed railway w ith full- face and half- facemodes. The research and analysis w ere done and made for the feasib ility o f substituting ha lf- face observat ion mode for the fu ll- face observation on CPIII plane netwo rk for highspeed ra ilw ay.
Research conclusions: From the theo retica l analysis, ad justment ca lculat ion w ith large amounts of the data of the ha lfface observat ion on CP III plane netwo rk and compar ison w ith a ll prec ise indexes of the ad justment calcu lation of the all- face observat ion data, itw as conc luded the half- face observationmode on CPIII plane netwo rk could subst itute forthe full- face observation mode. Th is research result could provide the basis for rev ision and improvement o f the "Eng ineering measurement specificat ion for h igh- speed ra ilw ay".
赵梦杰, 刘成龙,王化光,黄志伟. CPIII平面网半盘位观测的可行性研究与分析[J]. 铁道工程学报, 2011, 28(1): 20-24.
ZHAOM eng- jie, LIU Cheng- long, WANG Hua- guang, HUANG Zhi- wei. Research and Analysis of Feasibility of Half- face Observation on CPIII PlaneNetwork. 铁道工程学报, 2011, 28(1): 20-24.
Subject G roup of Surveying Adjustment, School of G eodesy and Geomatics, W uhan University. Theory of Errors and Basis of Surveying Adjustment [ M ].W uhan: W uhan University Press, 2003.
Liu Chenglong, Yang Youtao, Xu X iaozuo. Simulated Determination of A ccuracy Requirement for Contro l Points III Intersection N etw orks in H igh- speed Railw ay [ J]. Journal of Southwest Jiaotong University, 2008( 6): 718- 723.
Cheng Ang, L iu Chenglong, Xu X iaozuo. R esearch on the Posit iona l Accuracy Required for Control Points III N etwork [ J]. Journal of Railw ay Engineer ing Society,2009( 1): 45- 48.
[ 5] 武汉测绘科技大学《测量学》编写组. 测量学[M ]. 北京:测绘出版社, 1991.
G roup of Geodesy, Wuhan University. Geodesy [M ].Beijing: Surveying Engineer ing Press, 1991.
W ang P eng, Liu Cheng long, Yang X .i Research on Calculation Me thods of Preliminary Coordinates for Adjustment in Ba llastless Track Base - piles Contro l Points III w ith Free - station Linear - angularIntersection[ J]. R ailway Investigation and Surverying,2008( 3): 26- 28.