Analysis of Surrounding Rock Displacement of Subaqueous Tunnel with Complex Geological Condition
XIANG Xiao - hui1,WANG Li2,LI Chun - guang3
1. China Railway Siyuan Survey and Design Group Co. Ltd,Wuhan,Hubei 430063,China; 2. The Third Institute of Water Transport Engineering ,CCCC Second Harbor Consultants Co. Ltd,Wuhan,Hubei 430071 China; 3. Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China
Abstract:Research purposes: The Liuyanghe Tunnel in Changsha is a bi - way and four - lane tunnel with complex structure and it is composed of a small - distance tunnel,split tunnel and cut - cover tunnel. The monitored results of settlement and convergence of surrounding rock in subsurface excavated area and the analyses of the measures taken in construction and the procedures of tunnel excavation of Liuyanghe Tunnel can be as the reference to construction of the subaqueous tunnel in Changsha.
Research conclusions: The research results show if the measuring point is embed after excavation of core soil,the losses settlement is large. The full - face curtain grouting can be used to reinforce the surrounding rock to achieve better control of the vault settlement of the tunnel. The removal of temporary support has small impact on the displacement of surrounding rock. Using the three bench method and center diagram method to construct the subaqueous tunnel ,the displacement of surrounding rock canbe controlled well.
Hu Xuebin,Ma JianQing,Li Yong,etc. Research on Design of Shallow Underground Large Span Tunnel under Concentrated Urban Architectural Complex[J]. Technology of Highway and Transport,2007( z1) : 91 - 95.
Zhang Jianguo, Wang Mingnian, Liu Dagang, etc. Comparison of Different WorKing Procedures by CRD Method for Shallow - buried Subsea Tunnel Excavation [J]. Chinese Journal of Rock Mechanics and Engineering,2007( Z2) : 3639 - 3645.
Zhang Jianbin. Displacement Monitoring Analysis of Xiamen Xiang’an Subsea Tunnel in Landside Section Constructed with CRD Method[J]. Chinese Journal of Rock Mechanics and Engineering,2007 ( Z2 ) : 3653 - 3658.
Huang Mingqi. Fu Xianlun,Li Yunchao. Study on Stability Control of Large - section Subsea Tunnel in WeaK Strata by CRD Construction Method [J]. Chinese Journal of Rock Mechanics and Engineering, 2007( Z2) : 3805 - 3809.
Li Erbing,Wang Di,Wang Yuan,etc. Monitoring and Control of Construction Deformation of Urban Shallow - buried Large - span Double - arch Tunnel under Complex Condition [J]. Chinese Journal of Rock Mechanics and Engineering,2007( 4) : 833 - 839.
Zhang Dingli,Huang Jun. Analysis and Prediction of Vault Crown Settlement in Metro Tunneling at Shallow Depth[J]. Chinese Journal of Rock Mechanics and Engineering,2005( 10) : 1703 - 1707.
Qin Weimin,Sun Yi,Chen Runfa,etc. Application of Total Station Instrument and Sliding Micrometer to Monitoring Shuibuya Underground Powerhouse [J]. Rock and Soil Mechanics,2008( 2) : 557 - 561.
Wang Hao,Ge Xiurun,Song Gang,etc. Total Station is Applied in 3D Deformation Monitoring in Tunnel Excavation [J]. Chinese Journal of Rock Mechanics and Engineering,1999( supp) : 1217 - 1219.
[10] 王梦恕. 地下工程浅埋暗挖技术通论[M]. 合肥: 安徽教育出版社,2004.
Wang Mengshu. Technology of Shallow Tunnel Excavation[M]. Hefei: Anhui Education Press,2004.