研究结论:对武广高速铁路红粘土地基采用 ES法、e ~ lg p 法、三向应力法、割线模量法、现场试验法进行沉降计算,研究表明: 几种理论计算方法基本上随外荷载的增加呈线性变化,但外荷载越大,理论值偏离越大。分层总和计算的沉降量值较其他方法最接近实测值,三向应力法、割线模量法偏离得较大。根据实测沉降量分别进行修正,修正后的曲线中,E S法的修正曲线比较接近实测值。
Abstract:Research purposes: Considering high requirement and strict control on post - construction settlement of high - speed railway, settlement properties of red clay foundation was studied. Furthermore, proper settlement calculation method and corresponding modification coefficient was obtained after comparative analysis.
Research conclusions: Red clay foundation settlement was calculated by E S method,e ~ lg p method,3D stress method, secant modulus method and field test method,by which following conclusions could be drawn: settlement obtained from theoretical methods varied linearly with load increasing,however,significant deviation appeared with heavy load. Calculated settlement by layer - wise summation method was closest to measured value,while 3D stress method and secant modulus lead to a significantly larger settlement. Based on measured settlement,all calculations were modified in which ES method resulted in a closer curve.
Wei Shihong, Liao Yiling. Overconsolidation Properties,Low Degree of Density,and Characteristics of Deformation of Red Clay in Qianzhong Area [J]. Journal of Guizhou University of Technology ( Natural Science Edition) ,2006( 4) : 9 - 12.
Wang Zhiliang,Gao Feng. Study on Modified Factors for 1 - D Calculation of Embankment Settlement Considering soil Lateral Deformation [J]. Rock and Soil Mechanics,2005( 5) : 763 - 768.
Wang Tiexing. Analysis and Amendment of Layerwise Summation Method for Calculation Setting of Ground [J]. Journal of Xi’an University of Architecture & Technology,1996( 2) : 179 - 182.