Abstract:Research purposes: In order to solve the problem of the large deformation in high geo - stress tunnel of ongoing lanzhou - chongqing railway,according to the characteristic of the complex geological conditions and changeable influencing factors,the high in - situ stress in the right hole was released in advance by using deformability of the super pilot tunnel,under these conditions,the right hole was in acceptable low - stress state when it was excavated,which was potengoally less the input of support rigidity. This paper determined reasonable by using numerical simulation method.
Research conclusions: By taking maoyushan tunnel as the research object,the displacement release rate corresponding various location and dimension of the super pilot tunnel was studied in the paper through numeric simulation. The two -dimensional analysis show that the reasonable dimension of the super pilot tunnel was 7. 6m( width) × 5. 5m( height) .The reasonable distance between the pilot tunnel vault and the right holr vault was 2. 5m. The displacement release rate fo A snd BB `and CC `and DD `were respevtively 37% ,54% ,72% and 59% . This paper can provide reference for construction and design of other similar projects.
马伟斌,张 梅,赵有明,刘艳青,郭小雄,付兵先. 高地应力软岩隧道超前洞室断面优化模拟研究[J]. 铁道工程学报, 2011, 28(9): 58-62.
MA Wei - bin,ZHANG Mei,ZHAO You - ming,LIU Yan - qing,GUO Xiao - xiong,FU Bing - xian. Simulation Study on the Section Optimization of the Super Pilot Tunnel in High Geo - stress Tunnel. 铁道工程学报, 2011, 28(9): 58-62.
Li Xuehua, Yao Qiangling, Zhang Nong. Fracture Characteristics of a Soft Rock Roadway: Staged and Zoned Control [J] . Journal of China University of Mining & Technology,2009( 5) : 618 - 623.
Gao Fuqiang. The Effect of Numerical Simulation Analysis of Cross Section Shapes of Roadways on Surrounding Rock Stability[J]. Journal of Shandong University of Science and Technology: Natural Science, 2007( 2) : 43 - 46.
Dai Yonghao,Chen Weizhong,Liu Quansheng,etc. Optimization Study on Cross Section of Deep Mine Tunnel under High in Situ Stress[J]. Chinese Journal of Rock Mechanics and Engineering,2004( S2) : 4960 - 965.
Ling Biaocan, Huang Xianghong. Three Dimension Numerical Simulation Analysis on the Mechanical Effects o f Roadway Across Shape [J] . Journal of Huainan Institute of Technology,2002( 1) : 6 - 9.
[5] 李建林. 卸荷岩体力学理论与应用[M]. 北京: 中国建筑工业出版社,1999.
Li Jianlin. Theory and Application of Rock Mass Mechanics under Unloading Conditions[M]. Beijing: China Architecture and Building Press,1999.
Gao Fuqiang. The Effect of Numerical Simulation Analysis of Cross - section Shapes of Roadways on Surrounding Rock Stability [J]. Journal of Shandong University of Science and Technology: Natural Science, 2007( 2) : 43 - 46.
Su Huayou,Huang Jing,Zhang Jiada. Fuzzy Maths is Applied in Selecting of the Optimal Section form of Road [J]. Journal of Sichuan Institute Building Materials,1993( 3) : 58 - 62.
Guo Rui, Fang Yong, He Chuan. Study on the Correlation between Stress Release and Displacement Release During Tunnel Excavation [J]. Journal of Railway Engineering Society,2010( 9) : 46 - 50.