Abstract:Research purposes: Lots of the fair - faced concrete walls,fair - faced cylinders and fair - faced roofs were used for the Nanjing South Station,and the decorative faced concrete was also used in the some areas of the station. During the construction process,there were many engineering problems because of the structural features of the Nanjing South Station and the requirements of fair - faced concrete apparent quality,so it was necessary to study the apparent quality control technology of the fair - faced concrete. As there was no domestic fair - faced concrete quality standards and quality acceptance criteria,the fair - faced concrete construction control standards and measures were formulated through summing up the common surface quality defects of fair - faced concrete,analyzing the project characteristics of the Nanjing South Station and learning the experience of past projects to ensure fair - faced concrete quality for the Nanjing South Station.
Research conclusions: ( 1 ) The in - site test of the Nanjing South Station shows formulating the apprent quality standards,the surface texture control standards and the decorative effect control standards can effectively ensure the apparent quality of the Nanjing South Station and meet the fair - faced concrete apparent quality requirements of railway station building. ( 2) The construction quality is controlled from the aspects of the survey,the concrete engineering,the reinforcing bar engineering and the moulding engineering to effectively avoid the appearance of the apparent quality defects of the fair - faced concrete.
Wang Zelin, Yang Ding, Li Ning. Construction Technology of Fair - faced Concrete for Main Stadium of University 2011 Shenzhen[J]. Construction Technology, 2009( 12) : 95 - 98.
Ni Jinhua,Shi Jinfei,Shen Fengyun,etc. Comprehensive Construction Technology of Beijing Shooting Range Hall [J]. Construct ion Technology,2009( 2) : 1 -6.
Tao Jin,Zhao Guixiang,Yuan Yong,etc. Research on Workability and Optimum Mix Parameters of High - strength Selfcompacting Concrete [J]. Construction Technology,2005( S2) : 31 - 34.
Zhang Dongliang. Construction Technology of Concrete - filled Tubular Column for Nanjing South Station[J]. Journal of Railway Engineering Society,2011( 3) : 109 - 104.
Shen Min, Shen Fengyun, Shi Jinfei, etc. Green building construction technology in Beijing Shooting Range Hall [J] . Construction Technology,2009 ( 2 ) : 27 - 29.
Li Qiang,Meng Wenyuan,Li Xinmin,etc. Analysis, Selection and Design of Formwork System of As - cast - finish Concrete Project [J]. Concrete,2006( 11) : 82 - 86.
China State Construction Engineering Corporation. Construction Technology Criterion of As - cast - finished Concrete[M] . Beijing: China Architecture & Building Press.