Abstract:Research purposes:This paper analyzes the scheme for the passenger transfer between the Northern Xi'an Station of national railway terminal and metro station and gives some ideas on the connection plan and passenger transfer scheme between the urban rail transit and national railway terminal for providing the reference to the similar works.
Research conclusions: From the design practice of the North Xi'an Passenger Station of the comprehensive transportation terminal and the analysis of the characteristic of typical national railway terminal,it can be seen for such comprehensive transportation terminal,it is necessary to make overall planing and do the research on project interface and operation management in the stages of the design,construction and operation. Moreover,the station of the urban rail transit should be installed according to the passenger transfer convenience,the scale of stations,the layouts of the station building of the national railway,the square layout and the layout of the metro facilities.
Shen Yuerong,Bao Deying.Transfer Program Analysis of the Five Lines of the Hongqiao Integrated Transport Hub for Rail Traffic[J].Journal of Railway Engineering Society,2009(4) : 86-90.
Zhou Tiezheng.The Formation and Construction Ideas of the Integrated Transport Hub of the New Railway Station[J].Jorunal of Railway Engineering Society, 2008(S) : 80-86.