1.China Railway Eryuan Engineering Group Co. Ltd,Chengdu,Sichuan 610031,China; 2. Sichuan Research Institute of Building Science,Chengdu,Sichuan 610081,China
Abstract:Research purposes:In order to speed up the construction process,cut the construction cost,reduce the influence of remodeling the building on the social environment,reflect green environment protection and remain the style and features of the old building,sometimes it is necessary to remodel and reinforcing some parts of the substructure of the existing station building without demolishing the roof cover of the building. The research was done on the remodeling the substructure of the Chongqing North Railway Station with the support method of the flexible stayed cable according to the feature of the relatively light weight of the spatial frame roof of the building.
Research conclusions: (1) According to the light feature of the steel frame roof,by using the flexible tensile cable method,the active loading was conducted to the arc beam of the support base of the steel frame for controlling and adjusting the displacement of steel frame base of the roof and with the monitoring means and feedback design,it could control the internal force of the frame member effectively and avoid the demolishing and reconstruction works for the steel frame structure of the roof.In this way,the construction time of four months and the construction cost of 5.5 million Yuan could be saved.(2) Compared with traditional column support method,the 6. 45 million Yuan could be saved by using this method,with more concept of the green environment protection.(3) When needing to remain the historical style and features of the old building or consider the social influence,but it had no way to demolish the steel frame structure of the roof,the flexible tensile cable method could be used for remoulding and reinforcing the substructure of the frame on the premise of remaining the frame structure of the roof.
谷学东;高夕良;鲁兆红;鄢 炜;杨孟根. 站房改造钢网架屋面柔性吊索支托法的研究[J]. 铁道工程学报, 2012, 29(10): 84-89.
GU Xue-dong,GAO Xi-liang,LU Zhao-hong,YAN Wei,YANG Meng-gen. Study on Application Flexible Stayed Cable in Supporting Spatial Frame Roof of Railway Station Building for Remodeling. 铁道工程学报, 2012, 29(10): 84-89.
Han Lei,Zhang Junbing.Analysis of Optimization of Unsupported Cable Force of Steel Frame with Cable Hoisting Method[J].Journal of Railway Engineering Society,2009( 11) : 17-22.
[4]JGJ 7—2010,空间网格结构技术规程[S].
JGJ 7—2010,Technical Specification for Space Frame Structures[S].
[5]GB 50367—2006,混凝土结构加固设计规范[S].
GB 50367—2006,Design Code for Strengthening Concrete Structure[S].
[6]JGJ 116—2009,建筑抗震加固技术规程[S].
JGJ 116—2009,Technical Specification for Seismic Strengthening of Buildings[S].
[7]GB 50023—2009,建筑抗震鉴定标准[S].
GB 50023—2009,Standard for Seismic Appraisal of Buildings[S].