Abstract:Research purposes:There has been the argument about suspension and fixed modes of the catenary in tunnel since building high - speed railway. The analysis of the various properties of two fixed modes and selection of the rational suspension and fixed modes are the key points for design of the catenary of high - speed railway.
Research conclusions:In this paper,from the comparative analysis of two suspension and fixed modes of embedded spout and post - position anchor bolt from the areas of the load bearing situation,component properties,influence on tunnel,construction cost,construction methods,operation and maintenance,it is concluded: (1) The embedded spout has the advantages of the even load bearing,easy construction in later stage and reliable earthing,but with the high construction cost and the poor reservation accuracy of the pre - station construction.(2) The chemical anchor bolt has advantages of the no limitation of template,flexible positioning,controllable construction accuracy and low construction cost,but needing the additional earthing terminal with small adjustment allowance.(3) Based on the construction situation in China,it is recommended to give priority to using the suspension and fixed mode of post - position anchor bolt
Ding Zude,Peng Limin,Lei Mingfeng,etc. Analysis of Influence Factors on Dynamic Response of High-speed Railway Tunnel under Vibration Load[J].Journal of Railway Science and Engineering,2011(4) : 1 -6.
Deng Jie,Yu Nanyang,Zhaohaiheng. Study on the Adaptability of Effective Cross - section Area of the Tunnel of Beijing - Shanghai High - speed Railway[J]. Journal of Railway Engineering Society,2010(3) : 66-70.
Que Ming,Xiang Jiaqi. The Application of Chemical Anchor Bolt in the Suspension Engineering Innside the Tunnel of Contact Line System[J].Electric Railway, 2000(4) : 21-23.
Bai Jinlin, Liu Wei, Zhu Haibin. Construction Management and Engineering Practice of Tunnel Interface of Railway Passenger Dedicated Line [J]. Railway Standard Design,2010(1) : 200-204.
Li Shujing. Construction Technologies for Secondary Lining of the Low Wall and Primary Filling of the Side Arch of Tunnel[J]. Journal of Railway Engineering Society,2009(5) : 80-83.
Wan Zhansheng, Xia Yongxu, Han Ruichang. Experimental Research on Mechanic Behavior under High Temperature of Chemistry Anchor Bolts [J]. Journal of Chang' an University ( Natural Science Edition) ,2010(1) : 63-66.