Abstract:Research purposes: As an important measure that serving the Pingtan comprehensive experimental zone and the cross-strait trying beforehand,Fuzhou-Pingtan railway will extend Beijing-Fuzhou Railway to the forefront of the mainland from Fuzhou,which meet the latest requirements of the development of the economic zone in the west coast, Wulongjiang bridge is the key project of Fuzhou-Pingtan railway. Having taken line,terrain,navigation,geological conditions into consideration,we compared and fixed the main bridge style to ensure the economy and rationality of the way in which Fuzhou-Pingtan railway leaping over Wulongjiang,as well as the beauty,economy,dynamic performance,technique,construction and maintenance of the bridge.
Research conclusions:(1)With the novelty , beauty,economy and rationality,Continuous Rigid Frame partially cable-stayed bridge style will be applied in railway for the first time. It is the best scheme for this bridge for its capacity of optimizing the forces of the beam and largely reducing the Creep deflection of the midspan. ( 2) Wulongjiang Bridge will take the (144+288+144 )m continuous rigid frame partially cable-stayed bridge style,which can ensure the force of the structure and the creep deflection,and meanwhile meet the static and dynamic requirement with some economy and beauty. (3)As a reasonable construction scheme,this bridge can provide some instructive experience to the subsequent bridges in the same style.
姚汉文. 福平铁路乌龙江特大桥主桥桥式方案设计研究[J]. 铁道工程学报, 2013, 30(10): 55-59.
YAO Han-wen. Design and Research of the Type of Wulongjiang River Super Large Bridge on Fuzhou-Pingtan Railway. Journal of Railway Engineering Society, 2013, 30(10): 55-59.
Zhou Yanling. Analysis of the Effects of Shrinkage and Creep on the Finished State of Cable Stayed Concrete Bridges [J].Traffic Engineering and Technology for National Defence, 2009 (6) :17-19.
Luo Shidong , Yan Aiguo , Liu Zhenbiao. Research on the long-span combined bridge type of continuous rigid frame with flexible arch [J].Journal of Railway Science and Engineering, 2004 (2): 57-63.
[5]刘振标.广珠城际西江特大桥主桥设计[J].桥梁建设, 2009(3):55-58.
Liu Zhenbiao. Design of Main Bridge of X River Bridge on Guangzhou-Zhuhai Intercity Rail Transit [J]. Bridge Construction 2009 (3) :55-58.
Cao Jianan. Study of Long Term Creep Deformation and Control Methods of Great Prestressed Concrete Bridge with Ballastless Track [D].Changsha : Central South University, 2011.
He Yibin. Study on Post Creep Deformation of Long- span Concrete Continuous Bridge with Ballastless Tracks [J]. Journal of the China Railway Society, 2008 (4):120-124.
Li Xiaoli , Xiao Rucheng. Mechanical Action Analysis and Design Practice of Short Tower Cable-stayed- Bridge [ J ].Structral Engineers, 2005 ( 4 ) :7-9.