Abstract:Research purposes: The heavy haul railway station design is closely related to the charactenstic of coal transport corridor and transportation organization,it’s different from ordinary railway. According to the example of Mengxi-Central China railway coal transport corridor, the paper's purposes are to find the matters needing attention and solutions about the study on route scheme of railway terminal,combining with the programming of concentrated transportation system, the design on combinational station.
Research conclusions: From the research on the haul railway station design,it is concluded:(1)The route scheme of railway terminal should be determined with the function of project,the main technical standards and the influence of city planning.(2)The concentrated transportation system is consisted of the relevant line of railway net,special line and collection station. The station design should be considered with programming of concentrated transportation system,and set sufficient space for development.(3)The combinational station should be determined by the traffic organization principles,if necessary,it should choose appropriate layout according to the mainline traffic characteristic.(4)The paper analyzes the characteristics of heavy haul railway station design, the method of study on route scheme of railway terminal and the layout of combinational station in this paper can provide the reference to the other heavy haul railway project.
王志新. 蒙西至华中地区铁路煤运通道站场设计的研究[J]. 铁道工程学报, 2013, 30(10): 87-91.
WANG Zhi-xin. The Study about Railway Station Design of Mengxi-Central China Railway Coal Transport Corridor. 铁道工程学报, 2013, 30(10): 87-91.
[1]GB 50090—2006,铁路线路设计规范[S].
GB 50090—2006 , Code for Design of Railway Line[S].
[2]GB 50091—2006,铁路车站及枢纽设计规范[S].
GB 50091—2006,Code for Design of Railway Station and Terminal[S].
[3] 耿志修.大秦铁路重载运输技术[M].北京:中国铁道出版社,2009.
Geng Zhixiu. Datong-Qinghuangdao Heavy Haul Railway Line [M].Beijing: China Railway Publishing House, 2009.
[4]铁道第四勘察设计院.铁路工程设计技术手册?站场及枢纽[M].北京:中国铁道出版社,2004.
China Railway Siyuan Survey and Design Group. Ltd. Technical Manual of Railway Engineering Design? Railway Station and Terminal [M].Beijing:China Railway Publishing House, 2004. [5]铁道第三勘察设计院集团有限公司.新建铁路蒙西至华中地区铁路煤运通道工程预可行性研究报告[R].天津: 铁道第三勘察设计院集团有限公司,2011.
The Third Railway Survey and Design Institute Group Co. Ltd. The Preliminary Feasibility Study Report of Mengxi-Central China Railway Coal Transport Corridor [ R].Tianjin: The Third Railway Survey & Design Institute Group Co. Ltd, 2011.
[6]铁道第三勘察设计院集团有限公司.新建铁路蒙西至华中地区铁路煤运通道工程可行性研究报告[R].天津: 铁道第三勘察设计院集团有限公司,2013.
The Third Railway Survey and Design Institute Group Co. Ltd. The Feasibility Study Report of Mengxi- Central China Railway Coal Transport Corridor[R]. Tianjin: The Third Railway Survey &Design Institute Group Co. Ltd , 2013.
[7]崔永明.重载铁路车站设计有关问题的探讨[J].铁道标 准设计,2010(11) :30 - 32.
Cui Yongming. Exploration for Some Issues on Design of Heavy-Haul Railway Station [ J ].Railway Standard Design, 2010(11):30-32.
[8]李洪斌. 张唐重载铁路主要技术标准研究[J].铁道标准 设计,2011(7): 5 - 9.
Li Hongbin. Discussion on Main Technical Standards for Zhangjiakou-Tangshan Heavy Haul Railway[J]? Railway Standard Design , 2011( 7 ) : 5-9.
[9]娄强.20000列车技术站到发线腰岔设置方案探讨[J]. 铁道工程学报,2006(9):74 - 76.
Lou Qiang. Exploration on Setting of Middle Switch of Receiving-departure Track for 20 000 - ton Train in Technical Station [J].Journal of Railway Engineering Society, 2006 ( 9 ) : 74-76.
[10]吕建军.铁路枢纽规划与城市规划的协调[J].铁路运输 与经济,2005(10) :4 - 5. Lv Jianjun.
The Coordination between Railway Joint Terminal Planning and City Planning [J].Railway Transport and Economy, 2005 (10) :4-5.