Abstract:Research purposes:Taiyuan-Zhongwei-Yinchuan Railway is nearly 1 000 km with complex topographic and geological conditions.Bridge design speed is 200 km/h.Railway bridges across Yellow River in Zhongning County. Bridges are in octave seismic zone(peak ground acceleration 0.209).In order to satisfy navigation requirement and span requirements of the Yellow River Conservancy Commission,large span structure should be used.Accordingly,the most important problem becomes to select suitable bridge type in these bridge design.According to the natural condition of bridge site and external requirements,bridge type study on Zhongning Yellow River Super Major Bridge is carried out in this paper with emphasis on analysis of seismic force.
Research conclusions:Through the long—-unit prestressed concrete continuous beam and multi—-span simply supposed steel truss girder bridge type comparison,concluded that:(1)Steel truss girder meet a simple shape,force clear,light weight,stiffness and mass symmetry,the center of gravity low seismic design principles;(2)Steel truss girder to facilitate repairs,across major rivers,have a more important military significance;(3)Steel truss girder has a smaller temperature span,do not set the track temperature regulator,to avoid the adverse effects of passenger ride comfort; (4)This article can be a highly seismic region large span bridges bridge type choose to provide a theoretical basis,for other railway bridges style selection has a certain reference significance.
左家强. 太中银铁路中宁黄河特大桥桥式方案研究[J]. 铁道工程学报, 2013, 30(12): 36-40.
ZUO Jia-qiang. Bridge Type Study on Zhongning Yellow River Super Major Bridge on Taiyuan-Zhongwei-Yinchuan Railway. Journal of Railway Engineering Society, 2013, 30(12): 36-40.