Analysis of Settlement Influence on Beijing-Shanghai High-speed Railway Caused by Under-passing of Shijiazhuang-Jinan Passenger Dedicated Line's Bridge
SUN Zong-lei,LI Qiao
The Third Railway Survey and Design Institute Group Corporation, Tianjin 300142, China
Abstract:Research purposes: As the foundation of the new building near the existing railway bridge will produce additional stress to the soil,it is inevitable to cause foundation deformation of the existing railway bridge. The Jinan west connecting track bridge of the newly-built Shijiazhuang-Jinan Passenger Dedicated Line needs to under-pass the Yellow River south approach Bridge of the Beijing-Shanghai High-speed Railway. As the ballastless track is used for the Beijing-Shanghai high-speed Railway,it requires strict control of the settlement of the bridge substructure to ensure the safety of train running. Therefore,it is necessary to study the settlement influence on the Beijing-Shanghai High-speed Railway caused by under-passing of the Shijiazhuang-Jinan Passenger Dedicated Line s bridge. The Plaxis 3D finite element program was used to analyze the settlement influences on the bridge of the Beijing-Shanghai High-speed Railway when the solid bridge pier or frame bridge pier of the Shijiazhuang-Jinan Passenger Dedicated Line under-passes for the purpose of determining the minimum impact on the structure and stabilizing the track alignment.
Research conclusions: The analysis results illustrated that on consideration of the additional settlement of foundation caused by the newly building bridge ,the maximum unequal settlement of the adjacent solid pier structure of the existing Beijing-Shanghai High-speed Railway was 3.2mm and the frame pier structure was 4.3mm, and they were in the regulatory range of 5mm and feasible. It was recommended to use the solid pier structure because its additional impact was lesser than the others. In addition, it was proposed that the settlement influence on the existing high-speed railway bridge could be further reduced by extending the length of pile foundation of the new bridge properly and it also pointed out there was a variation between theoretical calculation and real data,so the perfect monitoring scheme,method, control value and early warning value would be established and improved to ensure the safe construction and safe operation of high-speed railway.
[1] 吴波,刘维宁,索晓明,等.地铁施工近邻桥基加固效果三维数值分析[J].铁道工程学报, 2005(5): 48-51.
Wu Bo, Liu Weinlng,Suo Xiaoming,etc. Research on the Reinforcing Effect of Adjacent Short Pile Bridge Foundation in Metro Station Construction [J]. Journal of Railway Engineering Society ,2005(5): 48-51.
[2] 李兆平,汪挺,项彦勇,等.北京地铁工程邻近桥桩施工风险评估及控制对策探讨[J].岩土力学,2008(7): 1837-1841.
Li Zhaoping,Wang Ting,Xiang Yanyong, etc. A study on Risk Grade Classification Method and Disposal Measures for Adjacent Bridge Piles in Beijing Metro Engineering [J]. Rock and Soil Mechanics, 2008(7): 1837-1841.
[3] 陈福全,杨敏.地面堆载作用下邻近桩基性状的数值分析[J],岩土工程学报, 2005(11): 1286-1290.
Chen Fuquan,Yang Min. Numerical Analysis of Piles Influenced by Lateral Soil Movement Due to Surcharge Loads [J]. Chinese Journal of Geotechnical Engineering, 2005(11) : 1286-1290.
[4] 屠毓敏,王建江.邻近堆载作用下排桩负摩擦力特性研究[J],岩土力学,2007(12): 2652-2656.
Tu yumin,Wang Jianjiang. Study on Negative Friction Characteristic of Row Piles Subjected to Surcharge Nearby [J]. Rock and Soil Mechanics,2007(12): 2652-2656.
[5] Ellis E A,Springman S M. Full-height Piled Bridge Abutments Constructed on Soft Clay [J]. Geotechnique,2001(1): 3-14.
[6] Springman S M. Lateral Loading on Piles Due to Simulated Embankment Construction [D]. Cambridge: Cambridge University,1989.
[7] Bransby M F, Springman S M. 3-D Finite Element Modeling of Pile Groups Adjacent to Surcharge Loads [J]. Computer and Geotechnics,1996(4): 301-324.
[8] Pan J L,Goh A T C, Wong K S,etc. Three-dimensional Analysis of Single Pile Response to Lateral Soil Movements [J]. Int J Numer & Anal Meth Geomech,2002(6): 747-758.
[9] 郑刚,颜志雄,雷华阳,等.基坑开挖对临近桩基影响的实测及有限元数值模拟分析[J].岩土工程学报,2007(5): 638-643.
Zhang Gang, Yan Zhixiong, Lei Huayang, etc. Field Observation and Finite Element Numerical Simulation Analysis of Effect on Adjacent Piles Due to Excavation [J]. Chinese Journal of Geotechnical Engineering,2007(5): 638-643.
[10]孙树礼.高速铁路桥梁设计与实践[M].北京:中国铁道出版社,2011.
Sun Shuli. Design and Practice of the High-speed Railway Bridges [M], Beijing: China Railway Publishing House,2011.