Abstract:Research purposes: There are many uncertainties in opening compartment and changing cutleries of the slurry shield in water - rich sand layer,and the technologies of the opening compartment and changing cutleries are not mature enough. In this paper,the construction process and the technical parameters about the opening compartment of the shield in actual construction in the complex stratum are summed up for providing the reference and basis to the further research on the technologies for opening compartment and changing cutleries of the shield and to the similar works.
Research conclusions: From the research on the technologies for opening compartment and changing cutleries of the shield in the complex stratum,it is concluded the clay membrane with the average thickness above 5cm must cover the entire soil of the working face. The feeding and compressing compartment must be done step by step at the same time. The pressure should be reduced step by step. The pressure needed for forming the clay membrane should be bigger than the cutting pressure by 0. 5 bar.
Tang Wei,Zang Jiqing,Wu Shaoyang. Research on Ground Reinforcement for Replacing Cutters for Long - distance and Large Diameter Shield Driving in Pebble Layer [J]. Journal of Railway Engineering Society, 2012( 2) : 19 - 24.
Yang Jiyan. Case Study on Arriving Construction Technology of Slurry Shield Machine with Super Large Diameter[J]. Journal of Tunnel Construction,2009 ( 5) : 548 -551.
[5] 周文波. 盾构法隧道施工技术及应用[M]. 北京: 中国建筑工业出版社,2004.
Zhou Wenbo. Sield Tunnelling Technology [M ]. Beijing: China Architecture and Buhilding Press,2004.
Peng Feng,Liu Guangjun. Research on Sleeve - valve - pipe Grouting Technology for Reinforcing the Pearl River Dam Underpassed by Shiziyang Tunnel [J]. Journal of Railway Engineering Society,2010( 7) : 55 - 58.