Abstract:Research purposes: Railway Engineering Quota Institute is organizing the formulation of ”The Calculation Unified Regulations of Railway Engineering Quantity". As one of the subject to participate in the preparation, the author classifies and analyzes present situation of railway engineering quantity, puts forward the proposal of preparation of ”The Calculation Unified Regulations of Railway Engineering Quantity”.
Research conclusions: ”The Calculation Unified Regulations of Railway Engineering Quantity” should include the "instructions" and ”engineering quantity calculation uniform provisions list of railway engineering”. A uniform provisions list should include the project name, unit of measurement, engineering quantity, engineering quantity calculation rules, formula, calculation parameters, calculation basis, note. The ”uniform provisions list” is formulated to prevent the engineering quantity problem, based on the number of the current budget quota and the engineering calculation rules, the construction technology, construction process and the typical guide site construction organization design, and the project quantum is set. Scientific and reasonable preparation" The Calculation Unified Regulations of Railway Engineering Quantity" to improve the railway construction project cost accuracy is important.
Railway Construction [2006]No. 113, Engineering Design of Railway Capital Construction Design Budget Method of Compilation [ S ]. [3]铁建设[2010]241号,高速铁路桥涵工程施工技术指南[S].
Railway Construction[2010]No. 241,Technology Guide for Construction of High-speed Railway Bridge and Culvert Engineering[S].
China Railway Siyuan Survey and Design Group Co.Ltd. Preliminary Design of Guangzhou-Zhuhai Railway Work Engineering[R].Wuhan: China Railway Siyuan Survey and Desigo Group Co. Ltd ,2007.
[6]杜永昌.高速与客运专线铁路施工工艺手册[M].北京:科学技术文献出版社,2006.
Du Yongchang. High Speed Railway and Passenger Dedicated Line Construction Technology Manual[M].
Beijing: Science and Technology Literature Press,2006.
[7]铁建设[2007]108号,铁路工程工程量清单计价指南(土建部分)[S].
Railway Construction[2007]No. 108, RaVway Project Quantity List Valuation Guide(Civil Part)[S].
Yang Shankui , etc. Desigo of Continuous Beam-arch Combined Structure for Passenger Dedicated Line [J]. Journal of liaVway Engineering Society , 2013 (2 ) ; 48-52. [9]林登春.深水高桩承台双壁钢吊箱围堰施工技术[J].广东建材,2012(2);82-84.
Lin Dengchun. Construction Technology of Double Wall Steel Boxed Cofferdam for Deep Water and High Pile Cap[J].Guangdong Building Materials , 2012 (2) : 82-84.