Abstract:Research purposes: Field tests were conducted at a CFG pile-raft structure working point of Beijing-Shanghai High-speed Railway to investigate the deformation law of reinforced zone and substratum compression and total settlement. A further evaluation was made to investigate the settlement control effect of deep foundation treatment with CFG pile-raft structure.
Research conclusions: The result indicates that:(1)The settlement of CFG pile-raft structure meets standard requirements. (2)The substratum settlement is the main part of total settlement, which accounts for 74% of total settlement. (3)The foundation settlement control effect of CFG pile-raft structure is better than that of CFG pile-cap-net. Under current test conditions, the ratio of the former's total settlement to the latter's is 73.5-75%. (4)The analysis showed that, CFG pile-raft structure can be used in preference in unballasted track on soft soil subgrade.
李波,冷景岩. 高速铁路CFG桩-筏结构沉降控制现场试验[J]. 铁道工程学报, 2014, 31(2): 48-52.
LI Bo, LENG Jing-yan. Research on Settlement Control Effect of CFG Pile-raft Structure Based on Field Test of High-speed Railway. 铁道工程学报, 2014, 31(2): 48-52.
[1] Borland J B, Broms B B, DeMello V H B. Behaviour of Foundations and Structures [C] //Proceedings of the 9th International Conference on Soil Mechanics and Foundations Engineering. Tokyo, Japan, 1977: 495-546.
Zai Jinmin, Jung Gang, Wang Xudong, etc. Model Test on Pile-raft Foundation Interaction under Ultimate Load[J]. Chinese Journal of Geotechnical Engineering, 2007(11):1597-1603.
Hu Chunlin, Li Kun, Yang Zhiyong, etc. Study on Monitoring and Synthetical Analysis of Pile-raft Foundation under Complex Geological Conditions [J]. Rock and Soil Mechanics, 2003(4):673-676.
Qi Liangfeng, Zhang Baoyin, Jian Hao. Insitu Measurement and Analysis of Rafts Internal Forces of High-rise Building with Pile-raft Foundation[J]. Industrial Construction, 2004(1); 45-49.
[5] Chaudhary M A. FEM Modelling of a Large Piled Raft for Settlement Control in Weak Rock [J]. Engineering Structures, 2007(11): 2901-2907.
[6] Small J C, Liu H L S. Time-settlement Behaviour of Piled Raft Foundations Using Infinite Elements [J]. Computers and Geotechnics, 2008(2):187-195.
Zhou Jing, Ye Yangsheng, Cai Degou. Analysis of Calculation Method for Foreign Geosynthetic Reinforced Pile Supported Embankments [J]. China Railway Science, 2007(2):1-6.
[9] Zeng Juncheng, Zhang Jiwen, Tong Xiaodong, etc. Test Evaluation of Post-construction Settlement of Subgrade in Beijing-Shanghai High-speed Railway [C]//Proceedings of the Second International Conference on Transportation Engineering, Chengdu, 2009(2):1275-1280.
[10] Zhang guangzong, Wang V呵un, Wang xu. Simulation and Study for Pile-soil Stress Ratio of Composite Foundation under Station Embankment Load in Jinan West Railway Station of Beijing-Shanghai High-speed Railway[J]. Key Technologies of Railway Engineering High-speed Railway, Heavy RaVway and Urban Rail Transit, 2010(8):526-532.
Li Changning, Wang Binglong, Zhou Shunhua. Reinforcement Technique for Subgrade in Soft Soil Zone by Composite Structure of CFG Pile-net and Its Application [J]. Journal of Railway Engineering Society, 2006(1):27-31.