Abstract:Research purposes: The contact channel of Wuhan Metro Line 2, is the first built in the sand layer under Yangtze River of domestic metro. With Pump room of 3# contact channel bears the load of elevating head about 56 m, so it has the characteristics of heavy loads and construction of high risk. There is no precedent for reference, and a reasonable structural design solution should be used to ensure the structural safety and construction safety.
Research conclusions: In this paper, research and analysis on 3# contact channel with pump room are made, with the following main conclusions: (1)Practice has proved that the use of the river bottom sand freezing method is safe and reliable. But it should be possible to optimize the effective volume of the pump, reduce the sump volume, reduce the risk of freezing construction. (2)The conventional rectangular cross-section sump design is difficult to satisfy dual requirements of the freezing construction and structure of the high-pressure shear. (3)The contact channel taking the structure of the wall of variable thickness design and sump using nearly oval cross-section design, made an unexpected result which not only overcomes the problem of high pressure shear, the new structure type but also greatly improves force structure, improves structural safety affluence. (4)Currently this kind of contact channel structure type can provide the reference for the similar tunnel design.
孙雪兵. 国内地铁首条越江区间联络通道结构设计[J]. 铁道工程学报, 2014, 31(2): 72-77.
SUN Xue-bing. The Structural Design of Contact Channel of the First Domestic Metro Cross-river Interval. 铁道工程学报, 2014, 31(2): 72-77.
Yao Yunquan, Zhang Lei, Zhang Xingang, etc. Design and Construction Technology of the Connecting Passage of No.4 Rail Transit in Guangihou[J]. Safety and Environmental Engineering, 2012(5):140-143.
Ding Guangying, Zhang Rencai, Luo Liangyou. The Freezing Construction Technology of Connecting Passage in Underwater of Dalian Road Tunnel [J]. Underground Engineering and Tunnels, 2003(3):30-34.
China Railway Siyuan Survey and Design Group Co.Ltd. The Working Drawing of Jiang Han Road to Ji Yu-qiao Interval of First-phase Project of Wuhan No.2 Subway Line [R]. Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd, 2011.
Yang Taihua. Risk Analysis of Freezing Method Applied to Adjacent Passage Construction of Cross-river Tunnel Project [J]. Chinese Journal of Underground Space and Engineering, 2010(6):1201-1206.
Wang Lingznin, Wang Xianfeng. An Accident Analysis of Communication Passage for River-crossing Tunnel Engineering with Freezing Construction Method [J]. Building Construction, 2005(8):51-53.
Wang Shimin, He Chuan, Gao Yunlong. Construction Mechanics Behavior of Interconnecting Aisle and Sump Pit of Shield Tunnel under High Hydraulic Pressure [J]. Journal of the China Railway Society, 2012 (7):108-114.
Wang Hui, Zhu Weibin, Li Dayong. Construction Method and Control Measure for Connecting Passage in Water-enriched Sand Bed [J]. Journal of Railway Engineering Society, 2010(9):82-87.