Abstract:Research purposes: The main structure form of railway intermediate bridge type stations no-standing pillar canopy is usually be arched. Using Midas Gen software for structural static analysis of no-standing pillar canopy bracket,under various load conditions such as dead load with self-respect, roof live load,wind load,temperature and horizontal seismic action, we have come to the conclusion of the stress and deformation control factors of no-standing pillar canopy bracket under above conditions. Also proposed the points what should paid attention to in engineering designation.
Research conclusions ;(1)The main structure form of railway intermediate bridge type station’s no-standing pillar canopy usually be arched. It is made to bracket structure to bear bending moment and shear force in two directions. Due to the shear relative to the rod eccentric shaft, it withstands the torque and be regarded as typical bending shear and artifacts. ( 2 ) The temperature change will cause a certain degree of stress and strain of bracket structure,especially for steel pipe truss,which has larger stress and axial deformation.(3)The carrier structure of prestressed reinforced concrete girder is easy to cause concrete-cracking under the effect of temperature stress. Reasonable seam should be considered when designing the bracket structure, to avoid the stress and deformation accumulation.(4)The analysis and research of bracket steel truss structure in this paper, has a certain reference value in the structural design of the railway intermediate bridge style station.
China Railway Siyuan Survey and Design Co. Ltd. Analysis and Research on the Roof Truss of Elevated Railway Station[R].Wuhan; China Railway Siyuan Survey and Design Co. Ltd,2009.
China Railway Siyuan Survey and Design Co. Ltd. Railway Platform in the Form of Large-span Steel Structure Canopy and Related Performance Tests[R]. Wuhan; China Railway Siyuan Survey and Design Co. Ltd,2007.
Yang Huidong, Wang Shipei, Shen Yun. Overall Stability Analysis on the Roof Truss of Beidaihe Railway Station [ J ].Sichuan Building Science , 2007(2):24-27. [6]钢结构设计手册编辑委员会.钢结构设计手册[M].北京:中国建筑工业出版社,2004.
Peng Dawen, Ding Wensheng. The Research of Static Loading Test on Large-size Steel Tube Truss Structure [J].Journal of Shanghai Institute of Technology (Natural Science ) , 2010 ( 9 ) ;180-185.
Wang Zhi}ang , Li Huiqiang , Du Ting. Analysis of Simplified Calculation Models for Large Span Steel- pipe Bow Fame[J].Optimization of Capital Construction , 2005 (12 ) ;117-119.
Yang Jianguo. Mechanics Analysis of Curve Large- span Spatial Steel Pipe Truss[J].Journal of Anhui Institute of Architecture & Industry ( Natural Science ), 2013(6);17-19.
Wu Xiaobua. Jing Spring Delineating Source Water Protection Zone and Method Discussion[C ]//China Environmental Science Press,2008.
[2]TB 10027-2012,铁路工程不良地质勘察规程[S].
TB 10027-2012 , Code for Unfavorable Geological [3]Condition Investigation of Railway Engineering [ S ].
昊治生.岩溶塌陷地表稳定性分析及工程地质分区[J]. 铁道工程学报,2006(4);6-9.
Wu Zhisheng. Analysis of Stability of Subsidence Surface in Karst Area and Zoning for Engineering Geology [ J ].Journal of Railway Engineering Society , 2006(4);6-9.
Yuan Jie, Gao Zongjun, Ma Haihui. View on the Control Action of Karst Water bevel to Karst Collapse Formation[J].The Chinese Journal of Geological Hazard and Control , 2010 ( 4 ) ; 95-98.
[5]程星.岩溶塌陷机理及其预测与评价研究[Z].北京:地质出版社,2006.
Cheng Xing. Karst Collapse Mechanism and Prediction and Evaluation Research[Z].Beijing; Geological Publish House,2006.