Abstract:Research purposes: In order to validate the newly designed WT-1 fastener system's performance which is used in Venezuela Northern Railway,according to“EN 13146:2002 Railway applications-Track-Test methods for fastening systems”,the longitudinal resistance,torsional resistance,electrical resistance tests are carried out on the newly designed WT-1 fastening system in the laboratory.
Research conclusions: (1)The longitudinal resistance and clamping force of the tested fastening are 11 .3 kN and 20.64 kN. (2)The torsional resistance is no less than 48. 7 kN*m/rad.(3)After 3 million times of fatigue test,the variation values of the mean dynamic stiffness,the mean vertical stiffness,the longitudinal resistance and the clamping force are 16. 62 %,12.5%,11.5% and 9. 2%.(4)The electrical resistance of the tested fastener is 36. 87 kΩ. (5)After 300 hours salt spray test,the tested fasteners can be disassembled with no damage,and then can be reassembled. (6)The experimental embedded casing can withstand a load of at least 60 kN and there are no cracks in the concrete sleeper around the bolt holes.(7)The tested parameters can meet the requirements in WT-1 fastener design and “EN 13481-2:2002 Railway applications-Track-Performance requirements for fastening systems- Part 2:concrete sleeper fastening systems".(8)This paper provides experimental reference for the design of fastening system in the ballasted track.
潘自立,颜华,杨吉忠. 委内瑞拉北部铁路用WT-1型扣件试验研究[J]. 铁道工程学报, 2014, 31(6): 35-38.
PAN Zi-1i,YAN Hua, YANG Ji-zhong. Experimental Research on the WT-1 Fastener in Venezuela Northern Railway. 铁道工程学报, 2014, 31(6): 35-38.
Yang Jizhong, Pan Zili, Tian Chunxiang. Analysis of Effect of Clip Quality on Performance Parameter of Fastening[ J].High Speed Railway Technology, 2012 (4) ;15-18.
Yang Jizhong, Han Yitao, Pan Zili. Numerical Simulation and Experimental Study of Gauge Apron plate in WT-1 Fastening Clip[ J].High Speed Railway Technology, 2013(4) :76-79.
China Railway Eryuan Engineering Group Co. Ltd. Specification for Production Acceptance of WT-1 Fastener Used in Tinaco-Anaco Railway in Venezuela [R].Chengdu; China Railway Eryuan Engineering Group Co. Ltd, 2012.
[4]王其昌.无碴轨道钢轨扣件[M].成都:西南交通大学出版社,2006 Wang Qichang. Rail Fastener on Ballastless Track [M].Chengdu ; Southwest Jiaotong University Press , 2006.
[5]EN 13481,Railway Applications-Track-Performance Requirements for Fastening Systems [S ].
[6]EN 13146,Railway Applications-Track-Test Methods for Fastening Systems[ S].
[7]卢祖文.我国铁路的钢轨扣件[J].中国铁路,2005(7); 25-27.
Lu Zuwen. Rail Fastener in China Railway[J]. Chinese Railways , 2005 ( 7) ; 25-27.
[8]李炜红.高速铁路有碴轨道的扣件选择[J].铁道建筑, 2002(9):l5-18.
Li Weihong. Choice of Fasteners in High-speed Ballasted Track[J].Railway Construction, 2002(9):