Abstract:Abstract:Research purposes:Aiming at the open and merge between solid track bed and foundation base of the enriched tunnel in the process of the railway operation, the causes of diseases is analysed, reasonable management measure is taken, which is used to plug underground water and grout the disease area, so as to ensure the structure safety of the process of the railway operation.
Research conclusions:Through the practice of construction, the method of composite anchor anchoring and quantitative amount pressure grouting which is used to cure disease is viable. The result of altitude monitoring shows that there is no obvious deformation happens before and after grouting construction, the grouting pressure can satisfy with the line safety control requirements. The result of dynamic monitoring results of the solid track bed when there is the train pass by shows that solid track bed is in a stable state, there is a good reinforcement effect in the disease area. The results of the study can provide a reference for similar enriched water tunnel diseases treatment.
郑保才 张俊兵 薛继明 吉洪江. 富水隧道整体道床及隧底病害治理技术研究[J]. 铁道工程, 2015, 32(1): 110-.
ZHENG Bao-cai, ZHANG Jun-bing, XUE Ji-ming, JI Hong-jiang. Technology Research of Disease Treatment about Solid Track Bed and Foundation Base of Enriched Water Tunnel. 铁道工程, 2015, 32(1): 110-.
[1]钟贞荣.地铁无碴轨道整体道床病害理论分析及有限元模拟[D]. 湖南衡阳:南华大学,2008.
Zhong Zhenrong. Theoretical Analysis and Finite Element Simulation on the Monolithic Track Bed Diseases of MTR Ballastless Track [D].Hengyang:University of South China,2008.
[2]郭飞,刘庆潭,李雅萍. 铁路隧道整体道床的沉降与基底状况关系的分析[J]. 中国铁道科学,2007(1):40-43.
Guo Fei,Liu Qingtan,Li Yaping. Analysis of the Relationship between Subsidence of Monolithic Roadbed of Railway Tunnel and the Situation of Foundation Base[J]. China Railway Science,2007(1):40-43.
[3]程学武,董敬. 隧道内整体道床的破裂原因分析及整治[J]. 铁道工程学报,2009(5):64-68.
Cheng Xuewu,Dong Jing. Analyses of the Cause for the Fracture of Monolithic Concrete Bed in Tunnel[J]. Journal of Railway Engineering Society,2009(5):64-68.
[4]苗晓岐. 九燕山隧道病害原因分析及整治措施建议[J]. 铁道工程学报,2003(2):70-73.
Mao Xiaoqi. Analysis on Reason of Defects in Jiuyanshan Tunnel and Suggestion of Measures for Their Regulation[J]. Journal of Railway Engineering Society,2003(2):70-73.
[5]翟可. 预防富水铁路隧道道床翻浆冒泥病害的设计施工措施探讨[J]. 隧道建设,2013(5):388-392.
Zhai Ke. Discussion on Countermeasures to Avoid Roadbed Mud Flow in Railway Tunnels in Water-rich Area[J]. Tunnel Construction,2013(5):388-392.
[6]于春华. 城轨交通整体道床病害及整治[J].铁道工程学报,2008(12):83-86.
Yu Chunhua. The Solid Track Bed Defect of Urban Mass Transit and Its Treatment[J]. Journal of Railway Engineering Society,2008(12):83-86.
[7]钟贞荣,罗科炎,杨仕教,等. 整体道床病害分析与整治[J].华东交通大学学报,2007(4):37-40.
Zhong Zhenrong,Luo Keyan,Yang Shijiao, etc. The Analysis and Treatment of the Track on Solid Bed Damage[J]. Journal of East China Jiaotong University,2007(4):37-40.
[8]杨新安,高艳灵. 沪宁铁路翻浆冒泥病害的地质雷达检测[J]. 岩石力学与工程学报,2004(1):116-119.
Yang Xinan,GaoYanling. GPR Inspection for Shanghai-〖JP〗Nanjing Railway Trackbed[J]. Chinese Journal of Rock Mechanics and Engineering,2004(1):116-119.
[9]黄先国. 水泉湾随道道床病害整治杖术[J]. 铁道建筑技术,2008(6):65-67.
Huang Xianguo. Treament Technologies for Roadbed Diseases in Shuiquanwan Tunnel[J]. Railway Construction Technology,2008(6):65-67.
[10]陆士良,汤雷,杨新安. 锚杆锚固力与锚固技术[M]. 北京:煤炭工业出版社, 1998.
Lu Shiliang,Tang Lei,Yang Xinan. Anchor Bolt Anchoring Force and Technology[M]. Beijing:China Coal Industry Publishing House, 1998.