[1]钱家欢,殷宗泽. 土工原理与计算(第2版)[M]. 北京:中国水利水电出版社,1996.
Qian Jiahuan,Yin Zongze. Geotechnical Principles and Calculation(V2.0)[M]. Beijing:China Water Power Press,1996.
[2]李志高,曾远,刘国彬. 临近地铁车站基坑开挖位移传递规律数值模拟[J]. 岩土力学,2008(11):3104-3108.
Li Zhigao,Zeng Yuan,Liu Guobin. Numerical Simulation of Displacement Transfer Law of Excavation Adjacent Metro Station[J]. Rock and Soil Mechanics,2008(11):3104-3108.
[3]TB 10002.1—2005,铁路桥涵设计基本规范[S].
TB 10002.1—2005, Fundamental Code for Design on Railway Bridge and Culvert[S].
[4]罗锟,雷晓燕. 沪宁城际铁路基坑开挖对既有线动态影响分析[J]. 铁道工程学报,2010(9):5-8.
Luo Kun,Lei Xiaoyan.The Dynamic Analysis of the Existing Railway’s Subgrade Settlement Caused by Excavation Pit on Hu-Ning Line[J]. Journal of Railway Engineering Society,2010(9):5-8.
[5]雷晓燕. 轨道力学与工程新方法[M]. 北京:中国铁道出版社,2002.
Lei Xiaoyan. New Methods in Railroad Track Mechanics and Technology[M]. Beijing:China Railway Publishing House,2002.
[6]Bose S K,Som K K.Parametric Study of a Braced Cut by Finite Element Method[J]. Computer and Geotechnics,1998(2):91-107.
[7]陈晓平,闫军. 深基坑支护结构的三维杆系有限元分析[J]. 岩土力学,2001(3):258-261.
Chen Xiaoping,Yan Jun. 3D Pole System PE Analysis for Bracing Structure of Deep Foundation Pit[J]. Rock and Soil Mechanics,2001(3):258-261.
[8]杨林浩. 郑西客运专线路基工程沉降观测方案[J]. 铁道工程学报,2006(4):10-13.
Yang Linhao. Procedure for Observation of Subgrade Settlement of Zhengzhou-Xi’an Passenger Dedicated Railway Line[J]. Journal of Railway Engineering Society, 2006(4):10-13.
[9]徐中华,王卫东. 敏感环境下基坑数值分析中土体本构模型的选择[J]. 岩土工程学报,2010(1):258-264.
Xu Zhonghua,Wang Weidong. Selection of Soil Constitutive Models for Numerical Analysis of Deep Excavations in Close Proximity to Sensitive Propertier[J]. Rock and Soil Mechanics,2010(1):258-264.
[10]JGJ 120—2012,建筑基坑支护技术规程[S].
JGJ 120—2012,Technical Specification for Retaining and Protection of Building Foundation Excavations[S] |